Laserfiche WebLink
ScheduleFire Sprinkler Pipe <br /> and Schedule <br /> SubmittalData Sheet <br /> FM Approved and Fully Listed Sprinkler Pipe Finishes and Coatings <br /> Wheatland Tube's Schedule 10 and Schedule All Wheatland black steel fire sprinkler pipe <br /> 40 steel fire sprinkler pipe is FM Approved receives a proprietary mill coating to ensure a <br /> and ULs and C-UL Listed. clean, corrosion-resistant surface that outperforms <br /> and outlasts standard lacquer coatings. This <br /> Approvals and Specifications coating allows the pipe to be easily painted, <br /> Schedule 10 and Schedule 40 meet or exceed without special preparation. Schedule 10 and <br /> the following standards: Schedule 40 can be ordered in black or hot-dip <br /> • ASTM A135, Type E, Grade A galvanized, to meet FM/UL requirements for dry <br /> (Schedule 10, 1-8 NPS) systems that meet the zinc coating specifications <br /> of ASTM A795 or A53. <br /> • ASTM A795, Type E, Grade A <br /> (Schedule 40, 1-2 NPS) Product Marking <br /> • ASTM A53, Type E, Grade B Each length of Wheatland fire sprinkler <br /> (Schedule 40, 2-8 NPS) pipe is continuously stenciled to show <br /> • ASTM A53, Type F, Grade A the manufacturer,type of pipe, grade, size <br /> (Schedule 40, 1-4 NPS) and length. Bar coding is acceptable as a <br /> supplementary identification method. <br /> • NFPA' 13 and NFPA 14 <br /> Manufacturing Protocols <br /> Schedule 10 and Schedule 40 are subjected <br /> to the toughest possible testing protocols to ensure <br /> the highest quality and long-lasting performance. <br /> SUBMITTAL INFORMATION <br /> PROJECT' CONTRACTOR: DATE: <br /> ENGINEER: SPECIFICATION REFERENCE: SYSTEM TYPE: <br /> LOCATIONS: COMMENTS: <br /> ❑ BLACK ❑ HOT-DIP GALVANIZED <br /> -,.'G� ,!I"' 1C:.;Ali','.G� . :`r•c.,+`iCdc;v ` :,., <br /> .., - �61:4 ;, - <:�, Whea <br /> tiandTub <br />