My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1001 N BROADWAY LEARNING RESOURCE CENTER 2026-01-15
>
Address Records
>
N BROADWAY
>
1001
>
LEARNING RESOURCE CENTER
>
1001 N BROADWAY LEARNING RESOURCE CENTER 2026-01-15
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/15/2026 8:47:21 AM
Creation date
9/23/2025 9:58:56 AM
Metadata
Fields
Template:
Address Document
Street Name
N BROADWAY
Street Number
1001
Tenant Name
LEARNING RESOURCE CENTER
Imported From Microfiche
No
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
1616
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
i Permit Inspections <br /> V E R E T T City of Everett <br /> WASHINGTON <br /> PW 25-SITE APPRVD-PERMIT <br /> 1/10/2024 1/10/2024 FINAL/PERMIT Andy Erickson FINAL eTRAKiT Inspection Request <br /> CLOSE OUT <br /> Notes: <br /> 1/9/2024 12:59 PM Sam Galey <br /> Site was walked 8/18 and approved,submitting for permit final now that all paperwork is submitted. <br /> Contact Name:Sam Galey <br /> Site Address:1001 N BROADWAY <br /> Phone:2066834135 <br /> e-Mail:sam.galey@mortenson.com <br /> 6/2/2025 6/2/2025 BOND RELEASE JIM KNAPPERT CORRECTION <br /> INSPECTION REQUIRED <br /> Notes: <br /> Stormwater infrastructure bond release inspection.Create punch list or let Terri know if approved so release letter can be sent. <br /> Inspection Contact:Jennifer Kim;Project Executive <br /> mobile 425.686.2461 <br /> jennifer.kim@mortenson.com <br /> Filter socks in basins and straw waddles around bio retention cells can be removed.Reschedule when completed. <br /> Inspector will notify contractor what corrections are needed. <br /> 6/10/2025 6/10/2025 BOND RELEASE JIM KNAPPERT APPROVAL <br /> INSPECTION <br /> Notes: <br /> Okay to release bond. <br /> Bond release eligible on 11/2/2025 if bond release inspection shows good working condition at that time. <br /> Eligible bond release date 11/2/2025 is for the 2 year drainage improvement warranty. <br /> The eligilble bond release date for the 1-year Public Improvement warranty bond was 11/2/2024 <br /> 1-year Public Improvement Warranty Bond released and attached <br /> 10/20/2025 BOND RELEASE PW INSPECTOR <br /> INSPECTION <br /> Notes: <br /> Stormwater bond release eligible on 11/2/2025,if inspection is approved. <br /> I <br /> Printed:Tuesday,23 September, 2025 5 of 5 rk <br /> SUPERION <br />
The URL can be used to link to this page
Your browser does not support the video tag.