Laserfiche WebLink
PUBLIC VORKS PERMIT Date Applied: 8/6/2020 <br /> City of Everett Permit Services <br /> Public Works Permit#: PW2008-011 <br /> EVERETT 3200 Cedar Street, 2 Floor Associated Bldg Permit#: B2008-007 <br /> Everett, WA 98201 Planning Reference#: SEPA20-011 <br /> WASHINGTON 425-257-8810 Public Works Fee: $61,727.56 <br /> OWNER NAME AND ADDRESS: APPLICANT NAME AND ADDRESS: <br /> EVERETT COMMUNITY COLLEGE CHERYL COHEN <br /> 2000 TOWER ST <br /> EVERETT,WA, <br /> PHONE: PHONE:2069715655 <br /> TAX PARCEL ID#:29051700200100 SITE ADDRESS: 1001 N BROADWAY <br /> DESCRIPTION:SITE WORK FOR LEARNING RESOURCE CENTER <br /> THIS PERMIT TO BE POSTED ON JOB SITE AT ALL TIMES <br /> PERMIT CONDITIONS: <br /> 1. All calls for inspection shall be made 24 hours in advance. <br /> 2. All work shall be performed in accordance with the permit and current City of Everett'Design and Construction Standards and Specifications <br /> for Development'. <br /> 3. Call Location Underground Service 48 hours before you dig.The day you call does not count.TOLL FREE NUMBER 811. <br /> 4. Site Civil Work to be done per plans,SWPPP,and drainage report approved by the City of Everett Public Works Department dated <br /> 06/04/2021.Approved plans must remain on job-site at all times. <br /> 5. Inspections are required for all stages of construction.Visit the City's Online Permitting Portal at pw.everettwa.gov to formally request all <br /> required inspections.A handout is provided at permit issuance with instructions on how to request an inspection online. <br /> 6. Any damage to City improvements(sidewalk,curb, roadway,etc.)shall be replaced per City Standards and/or as directed by the City PW <br /> Inspector. <br /> 7.City of Everett Water Department crews shall make all connections to City water main at owner/contractor's expense.This work to be <br /> under a separate Utility Permit to be purchased at the Permit Services Counter per a cost estimate by the Water Department.Work shall be <br /> scheduled 3-4 weeks in advance. <br /> 8.As-builts of storm,sanitary sewer,and water systems will be required to be submitted to the PW Inspector per City Design and <br /> Construction Standards and Specifications for Development prior to final approval/close out of the permit. <br /> 9.On-site water main will be staked within an easement to the City. The easement documentation will be submitted to the City prior to <br /> issuance of permits and must be recorded by the project team with a copy of the recorded document submitted to the City prior to final <br /> approval/close out of the permit. <br /> 10. A 1-year Warranty Bond in the amount of 10%of the construction costs for all public improvements shall be submitted to the City prior to <br /> final approval/close out of the permit. <br /> 11.A 2-year Warranty Bond in the amount of 10%of the construction costs for all Stormwater Infrastructure shall be submitted to the City <br /> prior to final approval/close out of the permit. <br /> 12.A Landscape Inspection is required by the Planning Department prior to final by the Public Works Inspector.To schedule a planning <br /> inspection,contact Planning@everettwa.gov and request an inspection with the permit number,site address,and inspection type listed. <br /> Please allow up to one week for the inspection to be scheduled. <br /> 13.Prior to any interruption to the public right-of-way(roadways,parking lanes,or sidewalks)a Traffic Street Use permit shall be obtained <br /> from the City's Traffic Engineering Division.This permit can be applied for online at pw.everettwa.gov and requires a traffic control plan to be <br /> submitted for the area of requested closure. Please allow 1-2 weeks for TSU permit issuance from the date of application. <br /> 14.Provide Environmental Construction Contingency Plan(ECCP) to City of Everett prior to any earthwork activities. <br /> 15.This permit must be finaled in order to close out this permit/grant a Certificate of Occupancy. Request a final inspection online by <br /> selecting PW 25-Site Final/Permit Close Out within the Online Permitting Portal Inspection Req ts,4 en It s have been completed for <br /> this permit. � U <br /> �J [E <br /> Continued on next page..... AUG 1 1 2021 <br /> 0 <br /> CITY OF EVERETT <br /> Permit Services <br /> ��c.� ca" <br />