Laserfiche WebLink
1.2 Proposed Construction Activities <br /> Description of site development (example: subdivision): <br /> The project includes the construction of a new 22,800-SF learning resource <br /> building, pedestrian walkways, landscaping, and surrounding pavement for <br /> parking and access. <br /> Description of construction activities (example: site preparation, demolition, excavation): <br /> The project includes the demolition of existing pavement and buildings within the <br /> site, excavation and filling operations to accommodate the building foundation <br /> system, and trenching for underground utilities. <br /> Description of site drainage, including flow from and onto adjacent properties. Must be <br /> consistent with Site Map in Appendix A: <br /> Stormwater from the new building and pavement will be collected and conveyed <br /> by catch basins and storm pipe to an existing combined sewer system within the <br /> site property. <br /> Description of final stabilization (example: extent of revegetation, paving, landscaping): <br /> Most of the site will be composed of pavement surfacing, except for a large <br /> landscaping open space north of the building and N. Broadway frontage <br /> landscaping. <br /> Contaminated Site Information: <br /> Proposed activities regarding contaminated soils or groundwater(example: on-site treatment <br /> system, authorized sanitary sewer discharge): <br /> The existing site is located within the Everett Smelter Cleanup Site. Soil testing for <br /> arsenic and lead contaminants is being conducted to determine if the <br /> contaminants are present in the soil. If lead or arsenic are found at <br /> concentrations above MTCA cleanup levels, EvCC will develop a soil remediation <br /> plan and enter the Voluntary Cleanup Program with Ecology. <br /> 11ar; e 15 <br />