My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1001 N BROADWAY EVCC 2025-10-03
>
Address Records
>
N BROADWAY
>
1001
>
EVCC
>
1001 N BROADWAY EVCC 2025-10-03
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/3/2025 11:09:21 AM
Creation date
9/23/2025 9:58:56 AM
Metadata
Fields
Template:
Address Document
Street Name
N BROADWAY
Street Number
1001
Tenant Name
EVCC
Imported From Microfiche
No
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
1289
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Additionally, protection must be provided for all BMPs installed for the permanent control of <br /> stormwater from sediment and compaction. BMPs that are to remain in place following <br /> completion of construction shall be examined and restored to full operating condition. If <br /> sediment enters these BMPs during construction, the sediment shall be removed and the facility <br /> shall be returned to conditions specified in the construction documents. <br /> 2.1.12 Element 12: Manage the Project <br /> The project will be managed based on the following principles: <br /> ■ Projects will be phased to the maximum extent practicable and seasonal work limitations <br /> will be taken into account. <br /> ■ Inspection and monitoring: <br /> o Inspection, maintenance, and repair of all BMPs will occur as needed to ensure <br /> performance of their intended function. <br /> o Site inspections and monitoring will be conducted in accordance with Special <br /> Condition S4 of the CSWGP. Sampling locations are indicated on the Site Map. <br /> Sampling station(s) are located in accordance with applicable requirements of <br /> the CSWGP. <br /> ■ Maintain an updated SWPPP. <br /> o The SWPPP will be updated, maintained, and implemented in accordance with <br /> Special Conditions S3, S4, and S9 of the CSWGP. <br /> As site work progresses, the SWPPP will be modified routinely to reflect changing site <br /> conditions. The SWPPP will be reviewed monthly to ensure the content is current. <br /> Table 5 — Management <br /> ❑ Design the project to fit the existing topography, soils, and drainage patterns <br /> ❑ Emphasize erosion control rather than sediment control <br /> ® Minimize the extent and duration of the area exposed <br /> ❑ Keep runoff velocities low <br /> ® Retain sediment on-site <br /> ® Thoroughly monitor site and maintain all ESC measures <br /> ® Schedule major earthwork during the dry season <br /> ❑ Other (please describe) <br /> 2.1.13 Element 13: Protect Low Impact Development (LID) BMPs <br /> Protect proposed bioretention facilities by delineating the area with High Visibility Fence <br /> (BMP C103) and prohibiting construction equipment within the fenced area. Protect against <br /> compaction by construction equipment after installation of the soil media. Prevent <br /> sediment-laden runoff from discharging into the bioretention area with Silt Fence (BMP C233) or <br /> Wattles (BMP C235). <br /> Page 113 <br />
The URL can be used to link to this page
Your browser does not support the video tag.