Laserfiche WebLink
4 Monitoring and Sampling Requirements <br /> Monitoring includes visual inspection, sampling for water quality parameters of concern, and <br /> documentation of the inspection and sampling findings in a site log book. A site log book will be <br /> maintained for all on-site construction activities and will include: <br /> • A record of the implementation of the SWPPP and other permit requirements <br /> • Site inspections <br /> ■ Stormwater sampling data <br /> A blank form is available in Appendix C. <br /> The site log book must be maintained on site or within reasonable access to the site and be <br /> made available upon request to Ecology or the local jurisdiction. <br /> Numeric effluent limits may be required for certain discharges to 303(d) listed waterbodies. See <br /> CSWGP Special Condition S8 and Section 5 of this template. <br /> 4.1 Site Inspection <br /> Site inspections will be conducted at least once every calendar week and within 24 hours <br /> following any discharge from the site. For sites that are temporarily stabilized and inactive, the <br /> required frequency is reduced to once per calendar month. <br /> The discharge point locations are at existing catch basin structures shown on sheet C1.01 <br /> (Appendix A). Inspect discharge point in accordance with the applicable requirements of the <br /> CSWGP. <br /> 4.2 Stormwater Quality Sampling <br /> 4.2.1 Turbidity Sampling <br /> It is anticipated that no discharge from the site will occur and sampling is not required. If <br /> discharge from the site occurs, then the sampling procedures below shall be implemented. <br /> Requirements include calibrated turbidity meter or transparency tube to sample site discharges <br /> for compliance with the CSWGP. Sampling will be conducted at all discharge points at least <br /> once per calendar week. <br /> Method for sampling turbidity: <br /> Table 7 —Turbidity Sampling Method <br /> ® I Turbidity Meter/Turbidimeter (required for disturbances 5 acres or greater in size) <br /> ❑ I Transparency Tube (option for disturbances less than 1 acre and up to 5 acres in size) <br /> hag, e 11S <br />