My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2025/09/24 Council Agenda Packet
>
Council Agenda Packets
>
2025
>
2025/09/24 Council Agenda Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/24/2025 2:58:17 PM
Creation date
9/24/2025 2:55:27 PM
Metadata
Fields
Template:
Council Agenda Packet
Date
9/24/2025
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
130
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
<br />Page 12 of 33 <br /> <br />o Fryer <br />o Beverage cooler <br /> <br /> Eclipse Mill Park, scheduled to open in 2028: <br />• The new 3-acre park at Eclipse Mill along the Snohomish Riverfront is scheduled to open in 2028. It <br />will include amenities such as a parking lot, restroom, open space, and non-motorized boat access. <br />Photos are in Appendix B, Item 13. <br />2.4 CONTRACT TRANSITION <br />In the event of a follow-on contract award to another supplier, the Proposer shall ensure a cooperative <br />and smooth transition to a new contract provider and shall provide all records, status reports, and <br />contract files as agreed with the provided notice of termination. <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.