My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Ordinance 4113-25
>
Ordinances
>
Ordinance 4113-25
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/25/2025 9:15:56 AM
Creation date
9/25/2025 9:15:47 AM
Metadata
Fields
Template:
Ordinances
Ordinance Number
4113-25
Date
9/24/2025
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
3
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
<br /> <br /> <br /> <br /> <br /> <br />ORDINANCE NO. 4113-25 <br /> <br />An ORDINANCE creating a special improvement project entitled “North Broadway Pedestrian Bridge” <br />Fund 303, Program 133, to accumulate all costs for the improvement. <br /> <br />WHEREAS, <br /> <br />A. The City of Everett is committed to a comprehensive bridge construction, maintenance, and safety <br />program. <br /> <br />B. The City of Everett has identified the need and obtained funds to construct a bridge at North <br />Broadway, connecting Everett Community College and Washington State University – Everett. <br /> <br />NOW, THEREFORE, THE CITY OF EVERETT DOES ORDAIN: <br /> <br />Section 1. A special improvement project is hereby established as Fund 303, Program 133, entitled <br />“North Broadway Pedestrian Bridge” to accumulate all costs for the improvement. Authorization is <br />hereby given to accumulate costs and distribute payments for the improvement project. <br /> <br />Section 3. Authorization is hereby granted for the “Public Works Director” or “City Engineer” under <br />direction of the Mayor, to assume full and complete responsibility for conducting all tasks and doing all <br />things to accomplish the actions authorized in this ordinance. <br /> <br />Section 4. The sum of $2,500,050 is hereby appropriated to Fund 303, Program 133, “North <br />Broadway Pedestrian Bridge” as follows: <br /> <br /> A. Estimated Design Costs $2,500,050 <br /> <br /> B. Source of Funds <br /> Move Ahead Washington Grant $2,500,050 <br /> Total Funds $2,500,050 <br /> <br />Section 5. The City Clerk and the codifiers of this Ordinance are authorized to make necessary <br />corrections to this Ordinance including, but not limited to, the correction of scrivener’s/clerical errors, <br />references, ordinance numbering, section/subsection numbers, and any internal references. <br /> <br />Section 6. The City Council hereby declares that should any section, paragraph, sentence, clause, or
The URL can be used to link to this page
Your browser does not support the video tag.