My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1202 RUCKER AVE 2025-09-30
>
Address Records
>
RUCKER AVE
>
1202
>
1202 RUCKER AVE 2025-09-30
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/26/2025 10:32:50 AM
Creation date
9/25/2025 9:27:08 AM
Metadata
Fields
Template:
Address Document
Street Name
RUCKER AVE
Street Number
1202
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
37
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
i Permit Inspections <br /> V E R E T T City of Everett <br /> WASHINGTON <br /> Permit Number: C0912-015 Description: DORMERS INTERIOR RENOVATION <br /> Applied: 12/24/2009 Approved:3/11/2010 Site Address: 1202 RUCKER AVE <br /> Issued:3/12/2010 Finaled: City,State Zip Code: EVERETT,WA 98201-1519 <br /> Status: PERMIT ISSUED Applicant:<NONE> <br /> Parent Permit: Owner:STARZL TERENCE H <br /> Parent Project: NCB09-018 Contractor: OWNER <br /> Details: <br /> REBUILD SUNROOM AND DECK ADDED 4-9-10.$437.66 IN ADDED FEES COLLECTED. <br /> DORMERS INTERIOR RENOVATION <br /> SCHEDULED DATE COMPLETED DATE TYPE INSPECTOR RESULT REMARKS <br /> 3/26/2010 3/26/2010 Footing Unassigned PartialApproval See notes <br /> Notes: <br /> Footings-Engineering to follow <br /> These footings are retrofit under house <br /> 4/2/2010 4/2/2010 PlbgGrWork SHELLIE PONS Approval As per notes <br /> Notes: <br /> Approved as noted: <br /> 1. Add trap primer to floor drain in Mechanical Room <br /> 4/7/2010 4/7/2010 PlbgGrWork SHELLIE PONS Approval As per notes <br /> Notes: <br /> 1. Hydronic lines tested at 100 psi-ok <br /> 2. Methods/Materials-ok <br /> 4/8/2010 4/8/2010 StructSlab Unassigned Corr Reqd See notes <br /> Notes: <br /> 11:10am-locked-no one on site <br /> 4/12/2010 4/12/2010 StructSlab Unassigned Approval Slab insulation for in floor heating <br /> Notes: <br /> 6/16/2010 6/16/2010 Framing Unassigned PartialApproval See notes <br /> Notes: <br /> 1)OK hold downs at interior, 1st floor. <br /> 2)OK FAP plates at basement. <br /> Obtain electrical inspection,recall framing. <br /> 7/2/2010 7/2/2010 PlbgRoughln SHELLIE PONS 7 Approval <br /> Notes: <br /> I <br /> Printed: Monday,07 April, 2025 1 of 11 <br /> SUPERION <br />
The URL can be used to link to this page
Your browser does not support the video tag.