My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1202 RUCKER AVE 2025-09-30
>
Address Records
>
RUCKER AVE
>
1202
>
1202 RUCKER AVE 2025-09-30
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/26/2025 10:32:50 AM
Creation date
9/25/2025 9:27:08 AM
Metadata
Fields
Template:
Address Document
Street Name
RUCKER AVE
Street Number
1202
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
37
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
i Permit Inspections <br /> V E R E T T City of Everett <br /> WASHINGTON <br /> 9/2/2022 9/6/2022 BLDG 08-FRAMING I RAKEEB KHAN NOT READY eTRAKiT Inspection Request <br /> Notes: <br /> 8/29/2022 4:11 PM Terence Starzl <br /> Subfloor and progress inspection <br /> Contact Name:Terence Starzl <br /> Site Address:1202 RUCKER AVE <br /> Phone:3605366924 <br /> e-Mail:starzlfamily@hotmail.com <br /> Floor sheathing in attic is ok. Framing not complete and not ready for inspection. Complete all framing and sub permit inspections prior to calling for <br /> next framing inspection. TONY TO CONDUCT NEXT INSPECTION. <br /> PERMIT EXTENSION <br /> EXTENSION <br /> 3/2/2023 3/2/2023 (REASON Unassigned <br /> APPROVED <br /> REQUIRED) <br /> Notes: <br /> CUSTOMER NEEDED MORE TIME <br /> 7/24/2023 7/24/2023 BLDG 01- <br /> CONSULTATION RAKEEB KHAN OTHER eTRAKiT Inspection Request <br /> Notes: <br /> 7/19/2023 3:46 PM Terence Starzl <br /> Request pre-inspection for framing before siding and roofing. <br /> Contact Name:Terence Starzl <br /> Site Address:1202 RUCKER AVE <br /> Phone:3605366924 <br /> e-Mail:starzlfamily@hotmail.com <br /> Discussed framing and load path issues.Owner to provide photos of floor framing to verify load transfer.OK to complete over framing and roof <br /> sheathing.Reschedule framing inspection and give a week notice by email.Inspector to take look at pictures and plans together. <br /> I <br /> Printed: Monday,07 April, 2025 8 of 11 <br /> SUPERION <br />
The URL can be used to link to this page
Your browser does not support the video tag.