My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1202 RUCKER AVE 2025-09-30
>
Address Records
>
RUCKER AVE
>
1202
>
1202 RUCKER AVE 2025-09-30
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/26/2025 10:32:50 AM
Creation date
9/25/2025 9:27:08 AM
Metadata
Fields
Template:
Address Document
Street Name
RUCKER AVE
Street Number
1202
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
37
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Cindy Bergsma <br /> From: Terry and Teddy Starzl <starzlfamily@hotmail.com> <br /> Sent: Sunday, December 04, 2016 8:29 PM <br /> To: Engineering/ Public Services;Jeff Heilman <br /> Subject: Request For Extension of Permit C0912-015 and E0912-135, 1202 Rucker Ave. <br /> Attachments: 2011jpg; 2016.png <br /> December 4, 2017 Extension granted until <br /> ------- but be advised if no progress made after <br /> Everett PubIjS_Wor1ks = ' �� ''~ this date, additional fees may be owed. <br /> (/J� <br /> STATUS OF CITY OF EVERETT PERMITS <br /> Address: 1202 Rucker Ave <br /> Permit: C0912-015 and E0912-135 <br /> �pctfully re_guest_an_�&xtensfon=to the permits to continue the on-going restoration and renovation of this <br /> 100 year old house. <br /> Renovation work on this house is actively continuing, however, two challenges have been met during the last <br /> summer and fall: <br /> 1. Water damage from the deteriorating metal siding was first noticed in February 2016. The metal siding was <br /> removed, and then the rotted boards and windows were repaired during the past two summers. It was <br /> important to immediately finish the renovations and repairs during the summer months to allow the painting <br /> and caulking to dry. This exterior work detracted from my ability to continue progress on the interior <br /> electrical and drywall wall work normally done for the permits. The attached photos show that significant <br /> progress on the exterior has been made to this project. <br /> 2. On October 2, 2016 1 was deployed by the Federal Emergency Management Agency (FEMA)to Tallahassee, <br /> Florida for Hurricane Matthew. As a Telecommunications Specialist, I provided data networking support to <br /> the Joint Federal Office for the recovery effort. <br /> Currently, I have contracted CM Heating of Everett to install a fireplace insert and stainless steel chimney liner <br /> on December 19, 2016. The new fireplace insert exceeds Washington State's Particle Emission Standards and <br /> will be an improvement over the existing open fireplace. In January of 2017, 1 will start demolition of the <br /> upstairs bathroom. With active permits I can replace the old wiring, insulate the walls and install drywall for <br /> inspections in February and March of next year. <br /> Please call if you have any questions or concerns. Thank you for your consideration. <br /> Terry Starzl <br /> 1202 Rucker Ave <br /> Everett, WA 98201 <br /> 360-536-6924 <br />
The URL can be used to link to this page
Your browser does not support the video tag.