My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1417 RUCKER AVE 2025-10-06
>
Address Records
>
RUCKER AVE
>
1417
>
1417 RUCKER AVE 2025-10-06
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/6/2025 11:26:09 AM
Creation date
9/25/2025 10:25:23 AM
Metadata
Fields
Template:
Address Document
Street Name
RUCKER AVE
Street Number
1417
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
56
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
i Permit Inspections <br /> V E R E T T City of Everett <br /> WASHINGTON <br /> Permit Number: P2407-047 Description: REPLACE PLUMBING IN SFR <br /> Applied:7/31/2024 Approved: 7/31/2024 Site Address: 1417 RUCKER AVE <br /> Issued:8/1/2024 Finaled: 5/13/2025 City,State Zip Code: EVERETT,WA 98201-1615 <br /> Status: FINALED Applicant:JAY ZAMORA <br /> Parent Permit: B2404-009 Owner:CARTER TRACEY L <br /> Parent Project: Contractor: OWNER <br /> Details: <br /> SCHEDULED DATE COMPLETED DATE TYPE INSPECTOR RESULT REMARKS <br /> 12/18/2024 12/18/2024 PLUMB 03-ROUGH JASON CORRECTION see notes <br /> IN MORRISSEY REQUIRED <br /> Notes: <br /> JAY <br /> 425-426-9492 <br /> List is not exhaustive:-Install missing nail-plates on all plastic waste and water lines per UPC chap 3-Fix leaking 3"roof flashing.-Expose waste and <br /> water piping under floor in master bath and water heater room to verify fitting usage and inspect for leaks.-Install 3"end of line clean-out on drain <br /> from master bath per UPC chap 7.-Vent tie in for master bath toilet trap arm needs to within 6'of top of flange to vent opening and shower trap is 5' <br /> per UPC chap 10 table 1002.2-Waste and vent in master bath needs to be water tested from lowest point under floor through 2"roof vent per UPC <br /> 712.0-Install vacuum breaker/anti siphon valves on hose bibs per UPC chap 6.Ok if done by final.-Replace broken 4 by 2 cast iron vent fitting and make <br /> proper transition from ABS to cast iron with a shielded mission band.-Seal 2"clean-out plugs with thread dole sealant. <br /> 1/9/2025 1/9/2025 PLUMB 03-ROUGH JASON CORRECTION see notes <br /> IN MORRISSEY REQUIRED <br /> Notes: <br /> JAY <br /> 425-426-9492 <br /> -Perform all corrections as per previous inspection.Have DWV on test for next inspection.Will need to run camera through back bathroom plumbing to <br /> verify buried fittings and pipe. <br /> 1/23/2025 1/23/2025 PLUMB 03-ROUGH JASON RESCHEDULE <br /> IN MORRISSEY ONLINE <br /> Notes: <br /> Jay Zamora 425-426-9492 <br /> Unable to perform the inspection today due to inspection volume and/or staffing levels.Rescheduled to 1/24/25. <br /> 1/24/2025 1/24/2025 PLUMB 03-ROUGH JASON CORRECTION see notes <br /> IN MORRISSEY REQUIRED <br /> Notes: <br /> -Replace 3"firnco couplings with shielded bands per the UPC-Reset shower/toilet vent off the vertical for a circuit vent.*** Retest system. <br /> 1/28/2025 1/28/2025 PLUMB 03 IN-ROUGH MORRISSEY JASON APPROVAL see notes <br /> Notes: <br /> JAY ZAMORA 425-426-9492 <br /> -Rough DWV and water for new master bath and existing main bath.Some galvanized and cast iron DWV to remain on front side of house in crawlspace <br /> and kitchen sink vent. <br /> Printed:Thursday,25 September,2025 1 of 2 F� <br /> SUPERION <br />
The URL can be used to link to this page
Your browser does not support the video tag.