My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1507 RUCKER AVE 2025-10-06
>
Address Records
>
RUCKER AVE
>
1507
>
1507 RUCKER AVE 2025-10-06
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/6/2025 11:42:05 AM
Creation date
9/25/2025 11:36:47 AM
Metadata
Fields
Template:
Address Document
Street Name
RUCKER AVE
Street Number
1507
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
68
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Step 5. Construction Stormwater Pollution Prevention <br />(SWPPP) <br />All new development and redevelopment projects are responsible for preventing erosion and discharge of <br />sediment and other pollutants into receiving waters. A Construction Stormwater Pollution Prevention Plan <br />(Construction SWPPP) is designed to be a stand-alone document that addresses construction stormwater <br />management concerns. A copy of this SWPPP is required to be kept by the contractor performing the work at <br />the jobsite for reference and updating during the duration of construction. <br />'Cask 1: Describe the project during construction <br />(You may attach a narrative that answers the following questions) <br />Nature and purpose of the construction project: <br />The project will consist of construction and attachment of a modular 340 sgft <br />detached accessory dwelling unit, an adjacent concrete parking pad, and rebuild <br />of previously demolished garage <br />Adjacent areas, including streams, lakes, wetlands, residential areas, and roads that might be <br />affected by the construction project: <br />An adjacent alleyway abutting the rear property line, neighboring properties, <br />15th St between Rucker Ave and Hoyt Ave <br />How upstream drainage areas may affect the site: <br />The neighboring residences drainage may runoff into the site if not effectively <br />drained <br />Downstream drainage leading from the site to a receiving body of water: <br />None leads directly to a receiving body of water. The alleyway at 15th St has a <br />storm drain that will have inlet protection installed during construction. <br />Critical areas that receive runoff from the site up to one -quarter mile away: <br />None exist near my project <br />Special requirements and provisions for working near or within critical areas: <br />Not applicable to my project <br />City of Everett Public Works <br />Small Project Stormwater Site Plan Report for Projects in <br />the Combined Sewer Area April 2021 <br />
The URL can be used to link to this page
Your browser does not support the video tag.