Laserfiche WebLink
Element 9. Control pollutants: <br />® BMP C 151: Concrete Handling <br />❑ BMP C 152: Sawcutting and Surfacing Pollution Prevention <br />❑ BMP C 153: Material Delivery, Storage, and Containment <br />9 BMP C 154: Concrete Washout Area <br />❑ BMP C250: Concrete Stormwater Chemical Treatment <br />❑ BMP C251: Construction Stormwater Filtration <br />❑ BMP C252: High pH Neutralization Using CO2 <br />❑ BMP C253: pH Control for High pH Water <br />❑ Other Per theSWMMWW: <br />❑ Not applicable to my proposed project <br />Explain: <br />Element 10. Control dewatering: <br />11 BMP C236: Vegetative Filtration <br />❑ Other Per theSWMMWW: <br />❑ Not applicable to my proposed project <br />Explain: <br />Element 11. Maintain BMPs: <br />® BMP C 150: Materials On Hand <br />❑ BMPC160: Certified Erosion and Sediment Control Lead <br />(CESCL not required on -site for <I acre). <br />❑ Other Per theSWMMWW. <br />❑ Not applicable to my proposed project <br />Explain: <br />Element 12. Manage the Project: <br />N BMP C 150: Materials On Hand <br />❑ BMPCl60: Certified Erosion and Sediment Control Lead <br />(CESCL not required on -site for sites < I acre) <br />❑ BMP C 162: Scheduling <br />❑ Other Per theSWMMWW: <br />❑ Not applicable to my proposed project <br />Explain: <br />City of Everett Public Works <br />Smali Project Stormwater Site Plan Report for Projects in 13 <br />the Combined Sewer Area -April 2021 <br />