Laserfiche WebLink
2022 Stormwater System Development Fee Calculations <br />Permit M PW2301-005 <br />Additional Notes: <br />Project Address: 1507 RUCKER AVE <br />Stormwater system development fees split on two separate permits: ground hard surfaces <br />Project Name: NEW GARAGE AND PARKING AREA <br />calculated on Public Works Permit and roof hard surfaces calculated on Building Permit. <br />Answer the Following Questions (Required): All Yellow Inputs <br />Water District: Everett <br />Sewer District: Everett <br />Prepared By: THAD NEWPORT Date: 1/9/2023 <br />Outside City Limits? No *Adds a 25% Surcharge <br />Supportive Housing Credit? No *Reduces by 80% <br />Reviewed By: Date: <br />Fee Calculations: <br />Stormwater System Development Fees: <br />Permit q: B2109-049 Type of Construction: Existing Development Adding New+ Replaced Hard Surfaces <br />Square Feet of New Plus Replaced Hard Surfaces: <br />440 1 SF <br />Stormwater System Dev Fee: <br />$117.83 Add this fee to the Building Permit for roof area hard surfaces. <br />Stormwater System Development Fees: <br />Permit H: PW2301-005 Type of Construction: I Existing Development Adding New + Replaced Hard Surfaces <br />Square Feet of New Plus Replaced Hard Surfaces: <br />192 SF <br />Stormwater System Dev Fee: 1 <br />$51.42 Add this fee to the Public Works Permit for hard surfaces on the ground. <br />