Laserfiche WebLink
CITY OF EVERETT <br /> EVERETT Permit Services <br /> WASHI NGTON <br /> RCW 64.55 : MULTI-FAMILY, MIXED-USE, AND TOWNHOME <br /> BUILDING ENCLOSURE SUBMITTAL CHECKLIST <br /> EXEMPT BUILDINGS: Non-residential buildings,hotels, motels,dormitories,care facilities,floating homes, mixed- <br /> use buildings with maximum of two residential attached dwelling units,duplexes,and townhouses(as defined by <br /> the IRC)where each unit is on a single platted lot(recorded zero lot line subdivisions). <br /> NOTE; The City of Everett will not review or approve plans or inspect the work required by RCW <br /> 64.55, but will collect the required submittals per RCW 64.55.020(1)and(2). <br /> PERMIT SUBMITTAL AND CERTIFICATE OF OCCUPANCY SUBMITTAL REQUIREMENTS: <br /> Signed Permit Application(s) (1 Copy of each,as applicable) <br /> Bldg/Mechanical/Plumbing/Sign/Sprinkler/Demolition, Public Works, <br /> Water/Sewer Utility, Electrical <br /> NConstruction Plans(2 sets; 1/4"= 1' minimum scale. If in historical overlay, 3 sets <br /> required. 24"x36" maximum sheet size, stapled bound edge, 5/8"thick, all pages <br /> uniformly sized, each page consecutively numbered) <br /> 0` Completed RCW 64.55 Worksheet(see below)per building(with one of the following <br /> options checked): <br /> Valuation is 5%or less of the assessed value of the market improvement.—Show <br /> the calculations for the valuation of the work,and the percentage of the assessed <br /> value. <br /> ❑ Two complete sets of building enclosure details which meet WA State RCW 64.55. <br /> —Independent inspection required during construction with letter of certification. <br /> ❑ Certified record copy of the "Sale Prohibition Covenant" RCW 64.55.010(6) (a) <br /> (vi). <br /> ❑ Single platted lot per townhouse, documented by recorded approved site plans <br /> per RCW 64.55.010 (6) (b) (iii).This must be submitted prior to obtaining a <br /> Certificate of Occupancy. <br /> ❑ Note:The worksheet item selected must be submitted prior to obtaining a building <br /> permit. <br /> ❑ Permit Submittal Fee (Plan check fee) <br /> RCW 64.55 Checklist(2019) Page 1 of 3 <br />