Laserfiche WebLink
Total 26 5 togged By MWR Driller Geologic Drill Drilling Hollow-Stem Auger <br /> gad fMd Drilled 4(2112014 4121l2014 papth(ft) CheMethod <br /> ctced 8y SWC <br /> Surface Elevation(ft) 86 Hammer Autohammer Drilling Diedrich D50 <br /> vertical Datum NA86 Data 140(lbs)130(in)Drop Equipment <br /> Groundwater <br /> Easting(X) System Depth to R <br /> Northing(Y) Datum Date Measured Water Elevation L_i <br /> Not encountered <br /> Notes: <br /> FIELD DATA <br /> 11vi!, <br /> $ MATERIAL REMARKS <br /> DESCRIPTION 0oioru E CK 0 00 ii v <br /> o AC 1 inch asphalt concrate pavement <br /> 5 sP-SM 4 inches sand and gravel tease <br /> PSMIs Gray fine to medium sand with silt to Silty fine to <br /> medium sand(very dense,moist)(glacial <br /> 18 57 1 till) Pip<1,NS <br /> SM: Gray silty fine to medium sand(very dense, _ i2 plD<t,NS <br /> 5 18 51 2 moist) <br /> 0 <br /> 8P-SM Gray fine to medit)r)-sand with silt(dense, pip<i,NS <br /> 18 38 3 moist)(Advance Outwash) <br /> 7 <br /> to 16 32 4 <br /> i5 17 34 4 8 <br /> a SA <br /> F M. <br /> -4 <br /> W t 59 6 3 <br /> Modes drier <br /> o <br /> 0 <br /> u <br /> w <br /> w <br /> z <br /> u <br /> .F <br /> m 25 16 52 7 <br /> 0 <br /> 9 <br /> it <br /> n <br /> IS <br /> 0 <br /> �u <br /> Note: Please see Figure A-1 for explanation of symbols <br /> Log of Boring B-11 <br /> Project: WSU-North Puget Sound at Everett <br /> �J Project Location: Everett,Washington Figure A-12 <br /> *- <br /> Project Number. 0403-031-00 Sheet 1 of 1 <br />