Laserfiche WebLink
i Permit Inspections <br /> V E R E T T City of Everett <br /> WASHINGTON <br /> 4/7/2022 4/7/2022 BLDG 08-FRAMING DAVE FOSTER PARTIAL <br /> APPROVAL <br /> Notes: <br /> Site contact:Barney Evans 425-876-4590 <br /> (4/7/2022 11:33 AM DWF) <br /> Interior walls only. <br /> Area level A>E, 1>4 <br /> Area B-1,E>K 1>4 <br /> A-2 Grid B>E,3>4 <br /> Also elevator <br /> B-1 level,Grid F>G,3>4 1"core board installed with bandages for overlap seams. <br /> 4/18/2022 4/18/2022 BLDG 08-FRAMING KURT KECK PARTIAL see notes <br /> APPROVAL <br /> Notes: <br /> BARNEY EVANS--BARNEY@GKKNUTSON.COM <br /> (4/18/2022 3:29 PM KMK) <br /> L 2 and 3 A(west)top of wall pending any MEP inspections <br /> For structural framing see special inspection reports. <br /> 4/26/2022 4/26/2022 BLDG 08-FRAMING KURT KECK NOT READY See notes <br /> Notes: <br /> Inspection is for Area A 1: <br /> Main electrical room(110), Elec Rm(107),MDF(106) <br /> Notes:It is not clear if the MEP rough ins have been for these three rooms <br /> 4/27/2022 4/27/2022 BLDG 10-DRYWALL KURT KECK PARTIAL exterior dens glass <br /> NAILING APPROVAL <br /> Notes: <br /> 5/6/2022 5/6/2022 BLDG 08-FRAMING KURT KECK CORRECTION See notes <br /> REQUIRED <br /> Notes: <br /> Please be specific about the area you want inspected so I can research MEPG's.I am available at my desk M-F 7:30-8:30 am <br /> 5/11/2022 5/11/2022 BLDG 08-FRAMING KURT KECK PARTIAL L 3 A,B Top of walls only <br /> APPROVAL <br /> Notes: <br /> email barney@gkknutson.com <br /> 425-876-4590 <br /> I <br /> Printed:Thursday, 18 January, 2024 3 of 11 rk <br /> SUPERION <br />