My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1001 N BROADWAY 2020 EVCC 2025-10-03
>
Address Records
>
N BROADWAY
>
1001
>
EVCC
>
1001 N BROADWAY 2020 EVCC 2025-10-03
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/3/2025 11:23:53 AM
Creation date
9/26/2025 11:35:03 AM
Metadata
Fields
Template:
Address Document
Street Name
N BROADWAY
Street Number
1001
Tenant Name
EVCC
Year
2020
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
327
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
For example, changes that can affect the applicability of this report include those that affect: <br /> • The function of the proposed structure; <br /> • Elevation, configuration, location, orientation or weight of the proposed structure; <br /> • Composition of the design team; or <br /> • Project ownership. <br /> If changes occur after the date of this report, GeoEngineers cannot be responsible for any consequences <br /> of such changes in relation to this report unless we have been given the opportunity to review our <br /> interpretations and recommendations. Based on that review, we can provide written modifications or <br /> confirmation, as appropriate. <br /> Subsurface Conditions Can Change <br /> This geotechnical or geologic report is based on conditions that existed at the time the study was <br /> performed. The findings and conclusions of this report may be affected by the passage of time, by <br /> man-made events such as construction on or adjacent to the site, new information or technology that <br /> becomes available subsequent to the report date, or by natural events such as floods, earthquakes, slope <br /> instability or groundwater fluctuations. If more than a few months have passed since issuance of our <br /> report or work product, or if any of the described events may have occurred, please contact GeoEngineers <br /> before applying this report for its intended purpose so that we may evaluate whether changed conditions <br /> affect the continued reliability or applicabilityof our conclusions and recommendations. <br /> Gecxtechnicai and Geo46gic,HusAP.,g <br /> gs Are Professional Opinjons <br /> Our interpretations of subsurface conditions are based on field observations from widely spaced sampling <br /> locations at the site. Site exploration identifies the Ispecific subsurface conditions only at those points <br /> where subsurface tests are conducted or samples are taken. GeoEngineers reviewed field and laboratory <br /> data and then applied, its professional judgment to render an informed opinion about subsurface <br /> conditions at other locations. Actual subsurface conditions may differ, sometimes significantly, from the <br /> opinions presented in this report. Our report, conclusions and interpretations are not a warranty of the <br /> actual subsurface conditions. <br /> Geotechnicai Engineering Report Recommendations Are Not Final <br /> The recommendations 'included in this report are preliminary and should not be considered final. <br /> GeoEngineers' recommendations can be finalized only by observing actual subsurface conditions <br /> revealed during construction GeoEngineers cannot assume responsibility or liability for the <br /> recommendations in this report if we do not perform construction observation. <br /> We recommend that you allow sufficient monitoring, testing and consultation during construction by <br /> GeoEngineers to confirm that the conditions encountered are consistent with those indicated by the <br /> explorations, to provide recommendations for design changes if the conditions revealed during the work <br /> differ from those anticipated, and to evaluate whether earthwork activities are completed in accordance <br /> with our recommendations. Retaining GeoEngineers for construction observation for this project is the <br /> most effective means of managing the risks associated with unanticipated conditions. <br /> i0y 22,2Q19 Page D-2 <br /> G EoE NG I N EERS� bite No 5836-011-00 <br />
The URL can be used to link to this page
Your browser does not support the video tag.