Laserfiche WebLink
EMPCS <br /> Structural Solutions <br /> Seattle 1011 Western Avenue,Suite 810 1 Seattle,WA 98104 1206.292.5076 <br /> Tacoma 1250 Pacific Avenue,Suite 701 1 Tacoma,WA 98402 1253.383.2797 <br /> Portland 101 SW Main Street,Suite 280 1 Portland,OR 97204 1503.232.3746 <br /> www.pcs-structural.com <br /> January 11, 2023 <br /> Mithun <br /> Pier 56, 1201 Alaskan Way#200 <br /> Seattle, WA 98101 <br /> ATTN: Cheryl Cohen <br /> RE: Everett Community College Learning Resource Center <br /> SUBJECT: Project Closeout <br /> Dear Cheryl, <br /> To the best of our knowledge, the above referenced project has been built to the intent of <br /> the Structural Drawings and Specifications. We are not aware of any structural issues that <br /> are left unresolved. <br /> This conclusion is based upon our periodic site visits and construction observations during <br /> those visits, review of the Test Reports, and follow-up of any questions from the Contractor <br /> as they were addressed to our office. <br /> It should be noted that we were not continuously "on-site", nor were we designated as <br /> inspectors for this project. We did, however, attempt to the best of our ability to monitor job <br /> progress and conformance to the construction documents during our periodic site visits, and <br /> in particular, to monitor the construction of the lateral resisting system of brace frames, <br /> collectors, diaphragms, and grade beams. <br /> Thank you for the opportunity to be of service to you on this successful project. If there are <br /> any questions regarding the project closeout, please feel free to call. <br /> Very truly yours, <br /> PCS STRUCTURAL SOLUTIONS <br /> �. SWAS <br /> TD <br /> Amy Poehlitz �9� <br /> U ti <br /> Project Engineer CIO - U <br /> Reviewed by: 0 33812 <br /> Craig Stauffer, S.E. �S. AL <br /> President `SIONAL <br /> AMPmap <br /> 19-343 <br /> 19343 closeout Itr 2023-01-11 amp <br />