My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1424 MAPLE ST 2021 Plans 2025-09-26
>
Address Records
>
MAPLE ST
>
1424
>
Plans
>
1424 MAPLE ST 2021 Plans 2025-09-26
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/26/2025 11:50:38 AM
Creation date
9/26/2025 11:50:03 AM
Metadata
Fields
Template:
Address Document
Street Name
MAPLE ST
Street Number
1424
Permit
B2112-034
Year
2021
Notes
REMOVE CARPORT AND FIREPLACE, ADD FRAMING AT DIN. OPENING
Address Document Type
Plans
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
10
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Peter Chopelas, PE <br /> Engineering&Design Services <br /> 307 North Olympic Ave, Suite#208 <br /> Arlington, WA 98223 <br /> (360) 653-4615 Chopelasandassociates@gmail.com <br /> January 5,2024 <br /> Nathaniel Coffing/Edwardo Piedara <br /> 3233 S Bay Drive <br /> Sedro Woolley,WA 9284 <br /> Project: B2112-034/changes and to the existing residence at 1424 Maple St,Everett WA <br /> Yin Lu,R.A.—Building Plans Examiner, City of Everett,wrote the following December 4',2023,the <br /> response is given below: <br /> 1. There is no ridge beam or board in the dinning addition roof framing. ...This kind of structure is <br /> not allowed per code,but as far as structural engineer is ok,we are ok with it. <br /> Response: This roof structure was detailed inspected in December, and an analysis of the loads <br /> was accomplished. The rafter size is acceptable fore the span,but to protect the walls from <br /> outward rafer pressure,the ceiling joists must be nailed to the rafter tails with a min of(6) 1 Od <br /> nails between the ceiling joists and the rafter at the eaves. This can also be accomplished with a <br /> metal strap with a min of six nails at either end of the connection. Because of the installed <br /> ceiling board this connection could not be verified. As an alternative to adding nailing to the <br /> rafter/joist connection,a ridge beam can be added under the ridge to support it. It would be about <br /> 6.5 ft long,and can be composed of(2)2x6 HF#2 or a single 4x6 HF#2, supported at both ends. <br /> The large GL beam can carry the point load,but the other end is over the pay window. Verify, or <br /> install,that this window has a min header size of(2)2x6 or a single 4x6 header HF#2. <br /> 2. Please add a jack stud[at the archway between the dining room and rear of the home] .A <br /> horizontal piece shall never be hung like this. <br /> Response: This is not a load bearing wall, it is just an unloaded archway that supports the wall <br /> board only.Roof members are parallel with this archway. A jack stud is not necessary, nor <br /> desirable since it will intruded into the room,but the plate should be attached with a simple angle <br /> like the Simpson A34, or an HH4. This will provide more than enough support and stabilize the <br /> connection with a positive attachment at the plate and wall trimmer. <br /> In addition,adding crawl space ventilation with screened or louvered vents is a good idea. Using <br /> the crawl space access door and any other blocked off openings in the foundation wall. <br /> If you have any questions or are in need of further assistance please feel free to call. <br /> is <br /> 14 <br /> .gam... .� l.. <br /> Peter Chopelas PE <br />
The URL can be used to link to this page
Your browser does not support the video tag.