My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2505 MADISON ST B 2023 Plans 2025-09-26
>
Address Records
>
MADISON ST
>
2505
>
Plans
>
2505 MADISON ST B 2023 Plans 2025-09-26
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/26/2025 1:29:20 PM
Creation date
9/26/2025 1:28:54 PM
Metadata
Fields
Template:
Address Document
Street Name
MADISON ST
Street Number
2505
Unit
B
Permit
B2309-019
Year
2023
Notes
NEW ADU-CLOSE IN BASEMENT STAIRWELL, FRAME (2) BEDS, KITCHEN
Address Document Type
Plans
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
9
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ln;er.or Features <br /> Be�ukms 3 <br /> ut1 cr.3 Bue�- 1 i 2 Bath, 1 <br /> Fear Forced Hot Air-Flee <br /> Fireplace Masonry double fireplace <br /> FfoorArea <br /> Fleor 1 Base SF 1040 Rushed SE 1040 <br /> Floor B Base SF 1040 Fanshtd SF 520 <br /> Garage{s1. Carport{s)and mayor outburldrrg(s) <br /> Anachedtara-ge": 240 <br /> I don't have problem to take the finished 520 sf as permitted habitable space, but the unfinished space (520sf) must be <br /> improved to be habitable space. Adding new habitable space is not alternation nor repair, but addition which shall meet <br /> new construction requirement per code. <br /> However, I will give a green light if all the following could meet: <br /> 1. All exterior wall in the basement has insulation R-21. <br /> 2. R-7.5 on top of the whole existing slab. <br /> 3. Please claim as much as You can and reply to me. (You should claim 1.5 additional energy credits, but I will make <br /> an exception this time.) 4—) A t,�,, .,/ -g.ywfI Oyer`-nS <br /> I hope this helps. If you all good with it, please reply to confirm so that I could print this. If things go well, I will finish my <br /> review line and permit technician will reach out to you with 3-4 business days for next step. <br /> Kindly let me know if any questions or concerns. <br /> Thank you! <br /> Yin <br /> — Yin Lu, R.A. <br /> Associate Engineer—Building Plans Examiner I Permit Services <br /> 425.257.7299 13200 Cedar Street, 2nd Floor, Everett,WA 98201 <br /> EVERETT Phone Hours: M/W/Th: 8 a.m.—12 p.m & 1 p.m.—3 p.m. <br /> everettwa.gov/permits I Facebook I Twitter <br /> From:Yin Lu <br /> Sent:Tuesday, November 21, 2023 12:26 PM <br /> To: Gwen Hopper<ghopper5477@vahoo.com> <br /> Cc:Jasmine Crews<iasmine crews@vahoo.com> <br /> Subject: RE: [EXTERNAL] Urgent-Fw: B2309-019-2505 Madison St <br /> Importance: High <br /> Hi Gwen,Jasmine, <br /> Hore is the list for your architect to provide: <br /> 1. Verify the existing basement ceiling height.7ft is min. height. —Designer said it is 7'-2". <br /> 2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.