Laserfiche WebLink
) I <br /> GENERAL NOTES <br /> 1. SEE SHEET E6.1 FOR CONDUIT AND WIRING BETWEEN <br /> 3 <br /> EQUIPMENT. <br /> I <br /> I <br /> W W W W W W W W W W W 3 W I <br /> I <br /> KEYED NOTES <br /> / <br /> f I O PROVIDE STRUCTURAL BOLLARD PER SHEET C2.3. <br /> 3 / <br /> BOLLARDS SHALL BE SPACED A MAXIMUM OF 5-0" FROM <br /> EACH OTHER. SHOULD BELOW GRADE OBSTRUCTIONS <br /> f INTERFERE WITH PLACEMENT, INCREASE QUANTITY OF <br /> BOLLARDS TO MAINTAIN SPACING REQUIREMENTS. <br /> FUTURE COMM I Q2 PROVIDE LONGSHOREMAN BREAK ROOM TRAILER ELECTRICAL <br /> CABINET f CONNECTION AS SHOWN ON SHEET E6.1. COORDINATE <br /> 3 WITH TRAILER PROVIDER FOR EXACT CONNECTION LOCATION. <br /> LIG�iTI � / O3 PROVIDE LONGSHOREMAN RESTROOM TRAILER ELECTRICAL <br /> DI ON TS L_j ,\ 3 / CONNECTION AS SHOWN ON SHEET E6.1. COORDINATE <br /> 5 / I WITH TRAILER PROVIDER FOR EXACT CONNECTION LOCATION. <br /> IG <br /> PO BASE f / 2 ® PROVIDE HOT BOX HEATER ELECTRICAL CONNECTION, SEE <br /> SHEET C5.9 FOR FURTHER HOT BOX INFORMATION. <br /> 1 LP1 4 P / T T CIRCUIT 3#10 IN 1"C TO 2P1-1. <br /> ORANSFORMER XL1 5 <br /> E4.5 E5.6 T COMMCOTRANSFORME XL2 O PROVIDE (1) 2" CONDUIT TO EACH LONGSHOREMAN <br /> T TRAILER FOR COMMUNICATIONS. COORDINATE WITH TRAILER <br /> O PROVIDER FOR EXACT CONNECTION LOCATIONS. <br /> Z © PROVIDE 20OW HEATER WITH THERMOSTAT WITHIN COMM <br /> MPZ RANSFORMERIXPI CABINET AND CIRCUIT TO PANEL 21 <br /> 1 TYjICAL PROVIDE (2) 100A 480V 4P 4W RECEPTACLES ADJACENT <br /> O O TO PANEL FOR POWERING PORTABLE TRANSFORMER SKID <br /> f SHOWN ON E5.3. <br /> I <br /> 5 E5. <br /> m - <br /> (Do I <br /> a< <br /> 0 <br /> o � <br /> m <br /> 3 <br /> o I F <br /> N <br /> o I <br /> I I I I <br /> '• '• '• '• I VN4P I '• '• '• '• '• '• '• '• '• I VN5P I <br /> I I I I <br /> L---J <br /> _ f <br /> • I I . . • . . . . . . I I <br /> E I VN4C OEM VNSC I 0 4 8 <br /> scale feet <br /> o <br /> Know what's below. NORTH PORTABLE BUILDINGS ELECTRI L PLAN 1 IF SHEET IS LESS THAN 22x34 <br /> Call before you dig. E1.3 E4.5 REDUCE SCALE ACCORDINGLY <br /> W <br /> a <br /> E PROJECT ENGINEER: SCALE: <br /> ��OI \ g K. D. SIATERLIS AS NOTED PORT OF EVERETT °"'G "° E4.5LU <br /> Port of 1 I q�� �� IN DDIGSIATERLIS 05/07/2021 NORTON TERMINAL DEVELOPMENT <br /> ASSOCIATES INC. QQ cIP No. <br /> MEvaM DRAWN BY: CHECKED BY: MTCA 3RD INTERIM ACTION 1-8-soo—o5 <br /> 16015[h Avenue,SURe 1300 ENGINEERS-CONSULTANTS (, <br /> Seattle,Washing[o ('061 o'�y, C. SMITH S. BARTKOSKE PROJECT <br /> P.O. BOX WA898206 Pfl01IE-0.1-120206)3ffi-0500 (206)243-5022 www.elcon.com 0 5/07/2021 DKS FOR ISSUED <br /> CItt REVIEW "SroArA � APPROVED BY: <br /> ENLARGED ELECTRICAL PLAN No MT-NT-2021-02.2 <br /> EVER16300 CHRISTENSEN ROAD,STE 330 <br /> (425) 259-3164 6EATTLE,WA 98188 REVISION NO. DATE BY REVISION NORTH PORTABLE BUILDINGS SHEET NO. 113 OF 150 '� <br /> N0. DATE BY (�/IS/2 <br />