Laserfiche WebLink
■ f/��/ 6 ��%� C� EX BERAr \ <br /> CP02 o � �� <br /> — l = NOTES <br /> ( <br /> I 0 <br /> ■ l� EX GVL/SAND \\ 1. SEAL ALL LONGITUDINAL AND TRANSVERSE <br /> 5 Q CP01 111 l JOINTS BETWEEN NEW REPLACEMENT AND <br /> /f ffi 5 / 1 EXISTING PAVEMENTS PER SPECIFICATIONS. <br /> / i✓ cn r I y 2. ADJUST EXISTING MANHOLE,HANDHOLE,INLET <br /> RIM,AND/OR VALVE COVER TO GRADE PRIOR <br /> ■ / I I I S'' / TO PAVING.PROTECT—IN—PLACE. <br /> 7 17.18 <br /> ■ <br /> ---------— <br /> M ■ / �/ I � LEGEND <br /> U ----- <br /> ) l� 9 17 �— --—\ 17--�--- <br /> / HMA PAVEMENT,9-HMA OVER 12" <br /> W 17.01 �L� \� CRBC SEE SECTION A ON C3.2 <br /> ■ / / / \ c^v \ ■ 17.30 FINISH GRADE SPOT ELEVATION <br /> FINISH GRADE SLOPE TRENCH DRAIN TD1 SDMH3 \ PAVEMENI <br /> W ■ lI I 211r7V / HIGH POINT RIM=16.02 RIM=16.02 ■ XX CONTROL TPOWRIZONTAL <br /> RIM=16.02 <br /> Z ■ O � ■ (SEE C3.22 FOR PAVEMENT <br /> J /r ' I HORIZONTAL CONTROL SCHEDULE) <br /> 16.07 ' \ — <br /> < . <br /> -g <br /> ■ G �a / 0 P1 —17—----- ------ --- ---- -------17— --- <br /> ( / ----- IP2 p ❑ <br /> I O / ~>— Ar <br /> I <br /> IO 17.76 O RIDGELINE=1 7.76 <br /> >< so <br /> I� <br /> 17---- - --------- ----- <br /> 6 16.03 <br /> 16.Z <br /> KEYMAP <br /> ■ <br /> SDMH6 / ■ ONNION. Z <br /> 1— RIM=15.02 / <br /> C TRENCH DRAIN, TYP I 30' 0 30' 60' <br /> ( CH SDMH23 CONCRETE GUTTER, TYP TD3 SDMH5 CB-2 SDMH24 ��3 S1 TD4 \ \ C3.3 S1.3 C3.3 S1.3 <br /> ■ RIM=14.90 I ■ 15' 45' <br /> �,�i �g.ao RI RIM=15.92 RM�1=}5.$B <br /> 16 �__ — RIM=15.74 ----16-- <br /> ■ 0.50% 5 T SCALE: 1"=30' <br /> 15--- -----15---- <br /> 5-- ---15— — E3 � E3 <br /> 14.95 15.85 T CALL 48 HOURS <br /> ■ RENCH DRAIN <br /> L� HIGH POINT BEFORE YOU DIG <br /> � � RIM=,S.6D J � DIAL811 <br /> ri i VERT DATUM: NAVE) 88 <br /> ❑El 00 P5 ❑El i� i---- — -------- CONV TO MLLW - NAVD88+2.03 <br /> �? ® i r HORZ DATUM: NAD 83/91 <br /> (D ■ ■ i ■ ■ ■ � ■ ■ ■ ■ ■ ■ ■ IIIIIIIIIIIIIIIIIIII I -4� tti■ ■ ■ ■ ■ i �■ ■ ON ON � ■ ■ ■ � ■ ■ IIIIIIIIIIIIIIIIIIII ON ON <br /> i � MATCHLIN — SEEe� _ _ w <br /> �< > <br /> 0 LU <br /> N PROJECT ENGINEER: SCALE: <br /> °W <br /> PORT OF EVERETT NO. <br /> C3�5 <br /> � � p, A N. WATSON 1" - 30' <br /> ��1♦p4*��.�.�� DESIGNED BY: DATE: <br /> Port of ==�s` r�0y J. BECKER 05/07/2021 NORTON TERMINAL DEVELOPMENT CIP NO. <br /> EVERETT ® 09/27/2021 NW REVISED PER RF1010 & WHSE DRAWN BY CHECKED BY —8-900—OS <br /> GVL YARD DRAINAGE & MTCA 3RD INTERIM ACTION C� <br /> ti K. EDWARDS, D. YU N. WATSON PROJECT <br /> 1601 Sth Avenue,Suite 1300 Q 06/21/2021 NW ISSUED FOR BID a 3701a e <br /> p P 0. BOX 538 Seattle,Washington 98101 �«� : GRADING DETAIL PLAN N� MT—NT-2021—02.2 <br /> tj EVERETT, WA 98206Fax O5/07/2021 NW FOR CITY REVIEW "s7ONAL 1' APPROVED BY: C <br /> N (425) 259-3164 PROJECT NO.01600120z06)382-0500 NO. DATE BY REVISION NO. DATE BY REVISION (2 OF 7) SHEET NO. 33 OF 150 O <br />