Laserfiche WebLink
PUMP REFERENCE LINE EQUIPMENT LIST <br /> 14 ROTO — FLOAT TYPES 4 PER MFR <br /> TOP EL = A RIM ELEVUTIO V — 1 _OU' 15 316 STAINLESS STEEL GUIDE BARS 4 PER MFR <br /> 16 PIPE SUPPORT/VALVE STAND 3 SEE SPECS <br /> 316 STAINLESS STEEL LIFTING CHAIN ASSEMBLY AND <br /> 18 I 17 LIFTING DEVICE 2 PER MFR <br /> 18 316 STAINLESS STEEL UPPER MOUNTING BRACKET 2 PER MFR <br /> PRESSURT <br /> BW EL = 10.43 15 MAIN OUT z_ <br /> EL = B <br /> N <br /> 4m m ELEVATIONS NOTES <br /> PUMP STA 1. ELECTRICAL PENETRATIONS SHALL BE MADE <br /> ELEV. WATER TIGHT. <br /> SD IN/PUMP ON = C, E TYP 16 DESCRIPTION REF (NAVD88) <br /> 2. PUMP ELEVATIONS SHALL BE FIELD ADJUSTED <br /> �7 TOP OF WET WELL A 1T08 DURING COMMISSIONING. <br /> PRESSURE MAIN OUT CL B 8.22 <br /> GRAVITY LINE IN C 6.87 <br /> HIGH WATER ALARM D _ <br /> SEE PUMP OP. NOTE 7 ON C4.15 <br /> 2" DAM SCH 40 <br /> PVC DRAIN LINE PUMP ON E 6.87 <br /> WITH CHECK VALVE, <br /> SLOPE TO DRAIN PUMP OFF F 0 <br /> BACKUP PUMP OFF <br /> GROUT PUMP SHELF (EMERGENCY OFF) G —0.50 <br /> PUMP OFF = F ANTI—FLOAT BOTTOM OF WET WELL H —1.00 <br /> BACK UP PUMP OFF = G RING <br /> BOTTOM = H r <br /> I I INSIDE OF WET WELL <br /> I I <br /> PUMP REFERENCE LINE <br /> I I <br /> I I <br /> I ° <br /> MOTOR MOUNT BOLT <br /> - PATTERN <br /> A LIFT STATION SECTION <br /> C4.15 C4.16 SCALE: NTS <br /> I p p <br /> I I <br /> I I <br /> I I <br /> CD <br /> 0 <br /> Sri <br /> 3.00' <br /> CALL 48 HOURS <br /> BEFORE YOU DIG <br /> 1.58' DIAL 811 <br /> °m r� VERT DATUM: NAVD 88 <br /> CONV TO MLLW = NAVD88+2.03 <br /> (D (a) WET WELL CONFIGURATION HORZ DATUM: NAD 83/91 <br /> o C4.14 C4.16 SCALE: NTS W <br /> a< <br /> m <br /> LU <br /> !D PROJECT ENGINEER: SCALE: <br /> PORT OF EVERETT DWG. N0.C4.16 <br /> p. N. WATSON AS SHOWN <br /> Q+ oe iAsej 1' <br /> �C 1b Np S DESIGNED BY: DATE: <br /> Port of ���` �2 J. BECKER 05/07/2021 NORTON TERMINAL DEVELOPMENT CIP NO. H <br /> o Ram _ <br /> L�EREl i DRAWN BY: CHECKED BY: 1-8-900-05 <br /> e 09/„/2D2, NW UPDATED RIM ELEVATIONS & MTCA 3RD INTERIM ACTION U <br /> N 16015th Avenue,Suite 1300 06/21/2021 NW ISSUED FOR B1D A 37014 o K. EDWARDS, D. YU N. WATSON PROJECT <br /> N P.0 Box 538 Seattle,Washington 98101 �,3„�� STO R M WAT E R DETAILS No. MT-NT-2021-02.2 tY <br /> N EVERETT, WA 98206 (206)382-0600 Fax(206)382-0500 ® 05/07/2021 NW FOR CITY REVIEW �staxeu�'� bti� APPROVED BY: O <br /> (425) 259-3164 PROJECT NO.1600120 NO. DATE BY REVISION NO. DATE BY REVISION (4 OF 4) SHEET NO. 60 OF 150 LL <br />