My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2600 FEDERAL AVE 2021 PORT OF EVERETT Plans 2025-09-26
>
Address Records
>
FEDERAL AVE
>
2600
>
PORT OF EVERETT
>
Plans
>
2600 FEDERAL AVE 2021 PORT OF EVERETT Plans 2025-09-26
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/26/2025 2:02:42 PM
Creation date
9/26/2025 1:56:04 PM
Metadata
Fields
Template:
Address Document
Street Name
FEDERAL AVE
Street Number
2600
Tenant Name
PORT OF EVERETT
Permit
PW2112-023
Year
2021
Notes
SITEWORK FEDERAL AVE AND NORTON TERMINAL
Address Document Type
Plans
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
150
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
1 <br /> SS LIFT STATION (SSLS1) Ex COONSTRUCTION NOTES <br /> oNc Ka) CONTRACTOR SHALL FURNISH AND INSTALL ALL LABOR AND <br /> RIM=17.1' BARGE DOCK RAMP MATERIALS TO CONNECT THE NEW WATER SERVICE TO THE TRAILER. <br /> � <br /> SSFM CV-GV V19 E=15.0' (3" VENT) I C5.5 C5.21 <br /> 5.5 C5. SSFM CV-GV V20 PIP ALL ABOVE GRADE PIPING SHALL BE WRAPPED IN 1/2" MIN THICK <br /> C21 RIM=17.72' 3" END CAP AND CONIC TB ` FIBERGLASS PIPE INSTALLATION WITH ALUMINUM COATING. <br /> E=14.9' (3" SSFM OUTLET) IE=15.38' FOR FUTURE WATERMAIN YARD HYD RAN C5.9 C5.20 <br /> IE=13.5' (6" SS INLET E) EXTENSION 2 CONTRACTOR SHALL FURNISH AND INSTALL ALL LABOR AND <br /> IE=13.5' (6" SS INLET N) 101-F-3" SSFM, IE=15.38' O MATERIALS TO CONNECT THE NEW SEWER SERVICE TO THE TRAILER. <br /> FUSION WELD MOLDED END <br /> CAP FOR FUTURE EXTENSION W 33LF-3" W N ,� ALL ABOVE GRADE PIPING SHALL BE WRAPPED IN 1/2" MIN THICK <br /> _p 3" SSFM e s s FIBERGLASS PIPE INSTALLATION WITH ALUMINUM COATING. <br /> 4 33LF-3" HDPE SS VENT PIPE <br /> 1 d- LONG RADIUS BEND S=1%MIN 3" GV �f O3 6" SS CO TYPE 1 PER COE STD DWG 604 <br /> IE-15.3' <br /> 3 6" SS CO 3%3%3" TEL ® ROUTE 3" HDPE VENT PIPE TO BLDG AND CONNECT TO BLDG VENT <br /> d I SYSTEM OR RUN NEW VENT PIPE UP SIDE OF BLDG AND TERMINATE <br /> d- RIM=17.4' <br /> �d IE=13.82' 3"x60° 6" MINIMUM ABOVE ROOF LINE IN CONFORMANCE WITH CURRENT <br /> HORIZ BEND PLUMBING CODE. SLOPE AT 1% MINIMUM UPHILL TO BLDG <br /> C(NNECTION TO PROVIDE POSITIVE AIR FLOW TO VENT. <br /> 16LF-6" PVC SS, S=2% 16LF-2" W °'\ 2 E=14.04' \ EX ROCKERY, PIP <br /> B I <br /> 2%90' HORIZ BEND 11LF-6" PVC SS, $=2% EX ASPH ROAD EX BRUSH <br /> P P P P <br /> � 3 I P P P P� <br /> I \ \POTENTIAL FUTURE � <br /> LEASEHOLD LINE <br /> 51LF-6" PVC SS, S=2% A\\A <br /> 3 2„ GV I \k <br /> 1 2"x2"x2" TEE \\ \ <br /> $ A A <br /> 2„ GV I /y "a <br /> 7UF�2"�N 2%90' <br /> 6"x45'HORIZ BEND \ HORIZ BEND <br /> 6" WYE, IE=14.52' • � \ \ \ <br /> 0 6" SS CO M g <br /> RIM=17.3' <br /> IE=14.6' d <br /> 2 E=15.04' d <br /> �Y <br /> w w 22LF-12"w 26LF-6" PVC SS, S=2% o \d \ 2"x3" REDUCER <br /> \ 2%2%2" TEE <br /> w 2�LC5.'2AO <br /> 2" METERE WATER SE VICE 2" WS PER � d 2"RPBA <br /> PER COE S D DWG 502 f COE STD C5 <br /> ° DWG 502 <br /> 12"END CAP AND CONC TB FOR FUTURE WATERMAIN EXTENSION a\ <br /> I � <br /> 2%90' VERT ° <br /> METERED <br /> BEND 9 ' I PERCOE VICE <br /> STD DWG 502 \ <br /> f <br /> 2" RPBA I ° <br /> C5.9 C5.20 <br /> � � M <br /> U <br /> v a I <br /> �-1 P P P 4-P PPP �� 0' 0 0' 20' <br /> � I I <br /> 5' 15' <br /> SCALE: 1"=10' <br /> CALL48HOURS <br /> 1 LONGSHOREMAN TRAILERS WATER AND SEWER PLAN 2 BARGE DOCK WATER PLAN BEFORE YOU DIG <br /> C5.1 C5.9 SCALE: 1"=10' C5.1 C5.9 SCALE: 1"=10' DIAL 811 <br /> 8� VERT DATUM: NAVD 88 <br /> CONV TO MLLW - NAVD88+2.03 <br /> m n HORZ DATUM: NAD 83/91 <br /> rtt IF SHEET IS LESS THAN 22x34 W <br /> a< REDUCE SCALE ACCORDINGLY > <br /> m <br /> LU <br /> PROJECT ENGINEER: SCALE: DWG. NO. <br /> A N. WATSON AS SHOWN PORT OF EVERETT C5.9 <br /> n DESIGNED BY: DATE: <br /> Port Of :ems`` _' J.DESIGNED <br /> DATE: 2021 NORTON TERMINAL DEVELOPMENT CIP N0. H <br /> -- EVERETT 1Tff DRAWN BY CHECKED BY & MTCA 3RD INTERIM ACTION 1-8-900-05 V <br /> n> _ 16015th Avenue,Suite 1300 mots <br /> o P.O. eox 53a ,� �r K. EDWARDS, D. YU N. WATSON NooOECTMT-NT-2021-02.2 <br /> INNi EVERETT, WA 98206 Seattle,Washington 98101 ® 05/07/2021 NW FOR CITY REVIEW �stoxst � APPROVED BY: WATER AND SEWER DETAIL PLAN 0 <br /> EVER T, WA 98 (206)382-0600 Fax(206)382-0500 {� /p O C \ <br /> PROJECT NO.1600120 NO. DATE BY REVISION NO. DATE BY REVISION l U r ) SHEET NO. 75 OF 149 LL <br />
The URL can be used to link to this page
Your browser does not support the video tag.