My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2600 FEDERAL AVE 2021 PORT OF EVERETT Plans 2025-09-26
>
Address Records
>
FEDERAL AVE
>
2600
>
PORT OF EVERETT
>
Plans
>
2600 FEDERAL AVE 2021 PORT OF EVERETT Plans 2025-09-26
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/26/2025 2:02:42 PM
Creation date
9/26/2025 1:56:04 PM
Metadata
Fields
Template:
Address Document
Street Name
FEDERAL AVE
Street Number
2600
Tenant Name
PORT OF EVERETT
Permit
PW2112-023
Year
2021
Notes
SITEWORK FEDERAL AVE AND NORTON TERMINAL
Address Document Type
Plans
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
150
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
I EXTENTS OF FORMER NON-BUILDING EXTENTS OF FORMER <br /> BUILDING/STRUCTURE FOUNDATION <br /> M <br /> FOUNDATION (STEEL & TIMBER PILES) (STEEL H-PILES) <br /> V7 <br /> UI I <br /> wl FINISHED GRADE j3 <br /> 2" PAVEMENT 12"X12"X6" TEE FOR FH9 0 <br /> = 3' MIN COVER, TYR FINISHED GRADE ASSEMBLY PER COE STD 507 EX H-PILE FOUNDATION, IW <br /> 18" SO PIPE, <br /> N EX GRADE 3' MIN COVER, TYP SEE NOTE 1 m <br /> E=1O.7t STA 25+09 (15.0' RIGHT) <br /> w w <br /> w w <br /> w w <br /> z z <br /> J J <br /> S S <br /> F- IE=13.4'f IE=12.7'f <br /> Q 18" MIN CLEAR Q <br /> EX 1' THICK WO CD WALL, EX H-PILE FOUNDATION, <br /> IE=8.2't <br /> SEE NOTE 1 SEE NOTE 1 <br /> I I <br /> IW1 23+00 W1 24+00 W1 25+00 I <br /> n ALIGNMENT W1 - WATER PRORLE (CONTINUED) <br /> C5.1 C5.32 <br /> EXTENTS OF FORMER EXTENTS OF FORMER <br /> BUILDING/STRUCTURE FOUNDATION BUILDING/STRUCTURE FOUNDATION <br /> w <br /> (SLAB-ON-GRADE) (SLAB-ON-GRADE) <br /> ml 12"x12"02" TEE, SEE W5 30 <br /> COMM AND POWER AIR-VAC4 <br /> PER COE STD PLAN 512 PR FILE FOR CONTINUATION <br /> DUCTBANK, SEE ELEC <br /> 2" PAVEMENT W5 STA 10+00 = W1 STA 27+81 <br /> w STUB FOR FUTURE FINISHED GRADE STA 27+50 <br /> w 3' MIN COVER, TYP <br /> WATERMAIN EXTENSION <br /> 2" WATER SERVICE-L <br /> w 12" GV EX GRADE 20 <br /> z z <br /> _ - - 0 <br /> 2 <br /> U <br /> 10 12" MIN CLEAR w <br /> IE=12.7't IE=13.0'+ 12"X12"X 6" TEE FOR FH1O <br /> ASSEMBLY P R COE STD 507 <br /> STA 27+59 15.0' RIGHT) <br /> 0 <br /> W7 26+00 W1 27+00 WI 28+00 W1 29+00 <br /> ALIGNMENT W1 - WATER PRORLE (CONTINUED) <br /> C5.1 C5.32 12"X12"X6" TEE FOR <br /> FH1 ASSEMBLY PER <br /> COE STD 507 <br /> EXTENTS OF FORMER STA 12+90 (40.0' LEFT) <br /> BUILDING/STRUCTURE FOUNDATION <br /> 30 (TIMBER PILES) 30 <br /> COMM AND POWER <br /> FINISHED GRADE DUCTBANK, SEE ELEC <br /> SNOPUD DUCTBANK, <br /> 20 3' MIN COVER, TYP SEE ELEC EX GRADE EX CONC SLAB 20 <br /> 12 GV <br /> z <br /> 0 <br /> p -- - --- - <br /> a <br /> w <br /> w 10 10 <br /> 12"x12"x12" TEE, SEE W1 IE=11.6'f <br /> 12"X9O° HORIZ BEND, <br /> PROFILE FOR CONTINUATIO IE-8..�+ 7.4'f 18" MIN CLEAR � 18 SD PIPE, IE-12.O'fSEE W6 <br /> W1 STA 14+99 = W2 STA 10+00 IE- g g f 12" MIN CLEAR CONTINUATION <br /> PROFILE FOR <br /> 3" SSFM IN CDF IE=$-�+ 7.4't W6 STA 10+00 <br /> 0 ENCASEMENT, IE=13.8+ W2 STA 13+00 0 <br /> W2 10+00 W2 11+00 W2 12+00 W2 13+00 <br /> GENERAL NOTES n ALIGNMENT W2- WATER PROFILE <br /> 1. EXISTING <br /> APPROXIMATE ANDISHOWNUFORRREFEREEN E IONLY. NOT ALE FOUNDATION C5.1 C5.32 CALL 48 HOURS <br /> STRUCTURES/DEBRIS ARE SHOWN.CONTRACTOR SHALL CONFIRM BEFORE YOU DIG <br /> EXISTING TO START OF ORK. IF IONS <br /> FROM THOSE CONDITIONS <br /> SIHIOWN INRIOR PROFILE,THE CCONTRACTOR SHALL <br /> NOTIFY ITHER DIAL 811 <br /> ENGINEER AND NOT BEGIN CONSTRUCTION UNTIL CHANGED CONDITIONS <br /> `m HAVE BEEN EVALUATED. <br /> om r� VERT DATUM: NAVD 88 <br /> 2. EXISTING UTILITY LOCATIONS AND DEPTHS ARE SHOWN APPROXIMATE. 10 0 10' 20' CONV TO MLLW = NAVD88t2.03 <br /> CONTRACTOR SHALL POTHOLE PRIOR TO START OF WORK. <br /> PROTECT-IN-PLACE ALL EXISTING UTILITIES SHOWN IN PROFILE, UNLESS HORZ DATUM: NAD 83/91 <br /> < NOTED OTHERWISE. <br /> 5' 15' W <br /> m < SCALE: 1"=10' <br /> CL m <br /> 0 LU <br /> N PROJECT ENGINEER: SCALE: <br /> PORT OF EVERETT °W N° <br /> A� A. p9 C5.32 � <br /> N. WATSON ill 10' <br /> of TA a <br /> '`;4�' .�,S DESIGNED BY: DATE: <br /> Port Of ems. - NORTON TERMINAL DEVELOPMENT <br /> e y m J. BECKER 06/21/2021 CIP No. <br /> � - 1-8-900-OS <br /> :z 1cpffEVERETT DRAWN BY CHECKED BY & M T C A 3 R D INTERIM ACTION tU <br /> 16015th Avenue,Suite 1300 09/27/2021 NW REVISED PER RFIo1 O 2 WHSE g svoia e K. EDWARDS, D. YU N. WATSON PROJECT <br /> N P 0. BOX 538 Seattle,Washington 98101 GVL YARD DRAINAGE +p '��Ig�gg6� '� WATER P R 0 F I L E S v� �' APPROVED BY: N0. MT-NT-2021-02.2 <br /> EVERETT, WA 98206 ® 06/21/2021 NW ISSUED FOR BID -.+y2px�g�.C. <br /> N (425) 259-3I64 PROJECT NO.O16OO12O2O6)382-050O No. DATE BY REVISION No. DATE BY REVISION b (SHEET 3 OF 7) SHEET NO. 83 OF 150 0 <br />
The URL can be used to link to this page
Your browser does not support the video tag.