Laserfiche WebLink
DBM CONTRACTORS Project: Engineer: Project# <br /> Compass Health Phase 2 <br /> Date: 08-Sep-23 <br /> GOBeam Subject: Checker: page: <br /> Version 2014.3 Deflection Estimate- H = 8' <br /> Date: <br /> Modulus of elasticity, E Beam end restraints <br /> Beam: 29000 Iksli [Left End Right End Sway frame: Q <br /> Columns: 29000 ksi Free W I Fixed <br /> Span N° 1 <br /> Length,ft 11 <br /> Moment of Inertia, in° 448 <br /> Support N4 1 2 <br /> Espring <br /> coordinate,ft 0 11 <br /> Veronstant,kip/ftt pe or hin e <br /> Column under Length,ft <br /> Moment of Inertia,in` <br /> Column above Length,ft <br /> Moment of Inertia,in <br /> Induced support displacements,ft <br /> Positive loads: <br /> T J Load case: LL <br /> Comment Load WA WB LA LB <br /> Type kip or kip/ft kip/ft ft ft <br /> Active Linear 0 -1.92 0 8 <br /> Traffic/Const <br /> Surcharge Linear -0.8 -0.8 0 8 <br /> Active Below <br /> BOE Linear -0.48 -0.66 8 11 <br /> Passive Linear 0 2.4 8 1 <br />