|
4) o <
<br /> d
<br /> IY Z 0) IRRIGATION NOTES: NOT FOR
<br /> E v N IRRIGATION SCHEDULE SYMBOL MANUFACTURER/MODEL/DESCRIPTION HunterWSS 1. IRRIGATION PLANS ARE DIAGRAMMATIC IN NATURE AND ALL PLANTING AREAS ARE TO RECEIVE HEAD—TO—HEAD IRRIGATION CONSTRUCTION
<br /> Wireless Solar,rain freeze sensor with outdoor COVERAGE.MAI NUN E AND VALVES TO BE LOCATED IN LANDSCAPE AREA.
<br /> .. o SYMBOL MANUFACTURER/MODEL/DESCRIPTION PSI Rain Bird PEB interface,connects to Hunter PCC,Pro-C,and I-Core 2. PLANS ARE BASED ON INFORMATION AVAILABLE AT THE TIME OF DESIGN CONTRACTOR SHALL FAMILIARIZE THEMSELVES WITH
<br /> i a co 1'
<br /> ,1-1/2",2"Plastic Industrial Valves. Low Flow Controllers,install as noted.Includes 10 year lithium
<br /> r.LN ® © ®®® Hunter PROS-06-PRS40 5'strip spray 40 Operating Capability,Globe Configuration. Y EXISTING CONDITIONS PRIOR TO BIDDING THE PROJECT.
<br /> >Q P P Y P 9 P ty 9 battery and rubber module cover,and gutter mount 3. ALL TREES TO BE IRRIGATED WITH BUBBLER MI T WATE TEM ON EPARATE ZONES.
<br /> W ES ECS RCS CS SS Shrub Spray,40psi regulated 6"pop-up bracket. RPBA
<br /> N Rain Bird 44-LRC 4. POINT OF CONNECTION IN PLUMBING ROOM. F MECH L.
<br /> t° o Rain Bird 1812-PRS-U 15 Strip Series p 1"Brass Quick-Coupling Valve,with Irrigation Lateral Line:PVC Schedule 40 5. POINT OF CONNECTION TO INCLUDE ER COE CODE, PRESSURE REDUCING VALVES, MASTER
<br /> M ® © ® Q eZ Shrub Spray,12"Pop-Up Sprinkler with Co-Molded 30 Corrosion-Resistant Stainless Steel Spring,Locking VALVES AND WINTERIZATIONS DRAINS. _
<br /> C1 EST ECS RCS CST ssr Wiper Seal. Side and Bottom Inlet.1/2"NPT Female Thermoplastic Rubber Cover,and 2-Piece Body. 6. AUTOMATIC IRRIGATION CONTROLLERS SHALL BE CA MONI IRRIGATION FLOW, SOIL MOISTURE AND
<br /> Threaded Inlet. With Pressure Regulating Device.
<br /> Irrigation Mainline:PVC Schedule 40 EVAPOTRANSPIRATION AND SHALL BE PROVIDED WITH REMOTE CONTROL SYSTEM AND PC BASED CENTRAL CONTROL
<br /> Buckner-Superior AV CAPABILITY.
<br /> w' Hunter MP Strip PROS-12-PRS40-CV-F-R 3/4",1",1-1/4",1-1/2",and 2".Red Brass Angle Shut ________ Pipe Sleeve:PVC Schedule 40 7. LAY OUT MAINLINE AND LATERALS WITH 8' OF CLEARANCE FROM NEW TREES AND OUTSIDE ROOT ZONE OF EXISTING TREES
<br /> Shrub Rotator,12"pop-up with factory installed check Off Valves with Crass Handle. WHENEVER POSSIBLE.
<br /> Goo valve,floguard,reclaimed body cap,pressure 40
<br /> LST a T RST re ulated to 40 psi,MP Rotator Houle.LST=1vo left Buckner-Superior 3200 1-1/2" �al�eca��o°� 8. INSTALL QUICK COUPLER AT EACH IRRIGATION ZONE OR MAXIMIZE 50' INTERVALS.
<br /> 9 P rY M NORTHWEST MIS,SUITE SM
<br /> strip,SST=Brown side strip,RST=Co erri right strip on Normally Closed Brass Master Valve that Provides 9. IRRIGATION SYSTEMS TO BE DESIGN BUILD BASED ON PERFORMANCE BASED EQUIPMENT AND SPECIFICATIONS OR APPROVED PORTAND,OR 9M9
<br /> P, PP 9 P # 81Ve m W3.z4 71W
<br /> PRS40 body. My Dirty Water Protection and No Minimum Flow Feature, EQUAL.
<br /> which ensures reliable opening and closing of the valve #^ # VdW Rm 10. IRRIGATION SYSTEMS AND CONTROLS TO BE DESIGNED TO MAXIMIZE WATER SAVING AND SHALL EMPLOY AUTOMATIC SEASONAL ITH ,°° ,
<br /> Hunter MP1000 PROS-12-PRS40-CV-F-R in extreme high or low flow scenarios. Available in ADJUST FUNCTIONS, RAIN AND FREEZE GAUGES AND SOIL MOISTURE SENSORS. s "°°
<br /> aS°a
<br /> Shrub Rotator,12"pop-up with check valve,floguard, 3/4",1"1-1/2",2",2-1/2"and 3". 11. CONTRACTOR SHALL OBTAIN AND PAY FOR ALL LICENSES, PERMITS, AND SALES TAXES APPLICABLE TO THIS PROJECT. $aid FRDAWiiasco:cn si,o3
<br /> R o I purple cap,pressure regulated to 40 psi,MP Rotator 40 12. CONTRACTOR SHALL REFER TO AND COORDINATE IRRIGATION SYSTEM INSTALLATION WITH LANDSCAPE PLAN. 1252iO3
<br /> nozzle.M=Maroon adj arc 90 to 210,L=Light Blue 210 Rain Bird PSI-M40X-100 13. CONTRACTOR SHALL VERIFY PRESSURE AND NOTIFY REPRESENTATIVE.
<br /> to 270 arc,O=Olive 360 arc on PRS40 body. Can be installed above or below the ground.Preset 14. CONTRACTOR SHALL PROVIDE AS BUILT DRAWINGS WITH AN OPERATING AND MAINTENANCE MANUAL.
<br /> outlet pressures:30 psi,40 psi.3/4"(20/27)or 1" 15. INSTALL TWO EXTRA CONTROL WIRES FROM CONTROLLER ALONG ENTIRE LENGTH OF IRRIGATION MAINLINE.
<br /> Hunter MP2000 PROS-12-PRS40-CV-F-R (26/34)female-threaded inlet and outlet. 16. SYSTEM HAS BEEN DESIGNED WITH THE INTENT TO OPERATE ONE ZONE AT A TIME, IF OPERATOR SCHEDULES CONTROLLER TO
<br /> Shrub Rotator,12"pop-up with factory installed check BF Febco 825Y(2)1-1/2" IRRIGATE MORE THAN ONE ZONE AT A TIME SYSTEM PRESSURE WILL DECREASE AND CREATE OPERATING AND COVERAGE ANRNOM MOISAN ARCHITECTS.INC.
<br /> valve,floguard,reclaimed body cap,pressure 40 Reduced Pressure Backflow Preventer DEFICIENCIES.
<br /> regulated to 40 psi,MP Rotator nozzle.K=Black adj 17. CONTRACTOR SHALL BE RESPONSIBLE FOR SLEEVES AND CHASES UNDER PAVING, WALKS, THROUGH WALLS, ETC., UNLESS
<br /> arc 90-210,G=Green adj arc 210-270,R=Red 360 arc Rain Bird ESP8LXME with(02)ESPLXMSM12 OTHERWISE NOTED. s i teWo r ks h o p
<br /> on PRS40 body. © 32 Station Commercial Controller. Mounted on a 18. ALL VALVE BOXES SHALL BE CARSON OR APPROVED EQUAL. INSTALL ALL IRRIGATION BOXES FLUSH WITH GRADE.
<br /> Rain Bird RWS-B-C 1401
<br /> Plastic Wall Mount. 19. CONTRACTOR SHALL BE RESPONSIBLE FOR INITIAL WINTERIZATION AND SPRING START—UP TO ENSURE SYSTEM IS OPERATING LANDSCAPE ARCHITECTURE
<br /> Root Watering System with diameter x long with PROPERLY.
<br /> 14O01 , , 4 14M locking grate,semi-rigid mesh tube,and check valve. 30
<br /> Rain Bird bubbler option as indicated:1401 0.25 GPM,
<br /> 1402 0.5 GPM,1404 1.0 GPM,1408 2.0 GPM.
<br /> o ��1 1
<br /> CPlIffi
<br /> 0
<br /> 'H"ecailth
<br /> LOTUS
<br /> 0 development partners
<br /> 0 F
<br /> o�
<br /> O
<br /> Fr
<br /> w3
<br /> W S
<br /> =J
<br /> GO>Q
<br /> 0
<br /> U�
<br /> wa
<br /> o�
<br /> ® LEVEL 2 PLANTER a
<br /> COPPER TO PVC TRANSITION. 0-0
<br /> ¢m
<br /> COPPER PIPING TO BE RUN w(Y
<br /> PER MECHANICAL a)L))
<br /> PUBLIC
<br /> ENTRY F Ill
<br /> LEVEL 2
<br /> w
<br /> w
<br /> LEVEL 2 �
<br /> Cl) = CD
<br /> p N
<br /> Of 00
<br /> LEVEL 1 Y Q
<br /> U �
<br /> CONTROLLER WITH WIRING O W
<br /> CONNECTION TO FLOW SENSOR AND J
<br /> MASTER VALVE m
<br /> W
<br /> POINT OF CONNECTION ASSEMBLY I Q Q
<br /> IN MECH ROOM. DBUBCEti;1 Sw Q
<br /> P CITY DE. 0 © 00 =
<br /> RPBA BF Q U)
<br /> 6 Q o
<br /> O m a
<br /> N �
<br /> M co [)
<br /> COPPER TO PVC TRANSITION. m M U
<br /> COPPER PIPING TO BE RUN
<br /> PER MECHANICAL 8
<br /> REVISION DATE REASON FOR ISSUE
<br /> 1 09/06/20 PERMIT REVISIONS
<br /> MAIN PUBLIC
<br /> ENTRY
<br /> I F\/FI 1
<br /> 0 Imp
<br /> 4
<br /> IRRIGATION PLAN -
<br /> 7741
<br /> ROW
<br /> E
<br /> 2?
<br /> o BROADWAY 3
<br /> i
<br /> 2" PERMIT SET
<br /> I
<br /> W
<br /> w�
<br /> U
<br /> E IRRIGATION PLAN - R.O.W. DATE PROJECT NUMBER
<br /> 02.02.2022 204780
<br /> SHEET NUMBER
<br /> L4.10
<br /> U
<br />
|