ELECTRICAL COMMISSIONING NOTES GENERAL PROJECT NOTES 9 <br /> 1. BUILDING COMMISSIONING BY ACERTIFIED COMMISSIONING PROFESSIONAL(CCXP)SHALL BE COMPLETED FOR THE ELECTRICAL POWER AND LIGHTING 1.THESE PLANS ARE SCHEMATIC AND DO NOT SHOW EXACT ROUTING,DEVICE LOCATIONS,ETC.THE ELECTRICAL CONTRACTOR SHALL COORONJATEWITH ALL <br /> SYSTEMS AND ENERGY METERING SYSTEMS ON THIS PROJECT IN ACCORDANCE WITH THE COMMERCIAL ENERGYCODE SECTION C408 AND LEED OTHER TRADES AND PROVIDE COMPLETEAND FULLYOPERATIONAL AND COORDINATED ELECTRICAL AND LOW VOLTAGE SYSTEMS THAT MEET ALL tLT- <br /> REQUIREMENTS <br /> .THE GOAL OF COMMISSIONING IS TO VERIFY THAT EQUIPMENT,CONTROLS AND THE SEQUENCING OF SUCH OPERATE AS INTENDED.THE REQUIREMENTS OF THE OWNER,CODE AND THE LOCAL AHJ AND THE CONTRACT DOCUMENTS. 1L <br /> COMMISSIONING DOCUMENTATION THAT IS REQUIRED 15 THE PROOF OF THIS OPERATION.THE FOLLOWING TASKS ARE REQUIRED FOR COMMISSIONING. 2.MATERIALS,METHODS AND INSTALLATION SHALL COMPLYWITH THE PROVISIONS OF THE LATEST EDITION(WITH STATE AND LOCAL AMENDMENTS)OF THE <br /> 2. COMMISSIONING PLAN:THE CCXP SHALL DEVELOP A PLAN WHICH OUTLINES THE ORGANIZATION,SCHEDULE,ALLOCATION OF RESOURCES AND NATIONAL ELECTRICAL CODE,WASHINGTON STATE ENERGYCODE INTERNATIONAL BUILDING CODE,INTERNATIONAL FIRE CODE,INTERNATIONAL'S <br /> DOCUMENTATION REDUIREMENTS OF THE COMMISSIONING PROCESS THE ELECTRICAL CONTRACTOR SHALL COORDINATE WITH THE GENERAL MECHANICAL GODS,UNIFORM PLUMBING CODE,THE AMERICANS WITH DISABILITY ACT AND LOCAL CODES AND ORDINANCES.. <br /> CONTRACTOR AND COMMISSIONING AGENT AS REQUIRED TOAS5167 IN DEVELOPING THE COMMISSIONING PLAN,SEE SECTION C408.1.2 IN THE WASHINGTON 3.CONFIRM ALL LOCATIONS AND QUANTITIES WI7H THE OWNER AND ARCHITECT PRIOR TO THE START OF CONSTRUCTION. <br /> STATE ENERGY CODE LISTED ITEMS I THROUGH 4 SHALL BE PREPARED AND SUBMITTED WITH THE CONSTRUCTION DRAWINGS;LISTED ITEMS 5 THROUGH 4.CONTRACTOR TO MAINTNN THE FIRE RATINGOFANYFlRE-RATED WALLS AND FLOORS.ALL FLOOR PENETRATIONS TO BE FINISHED TO ASMOOTH SURFACE. <br /> SHALL BE PREPARED AND SUBMITTED PRIOR TO THE FIRST ELECTRICAL INSPECTION,ALL ITEMS SHALL BE SUBMITTED WITH THE ELECTRICAL SUBMITTALS <br /> SEE DIVISION Di FOR LEED COMMISSIONING REQUIREMENTS. <br /> 3. PRELIMINARY COMMISSIONING REPORT:COMPLETION OF THE COMMISSIONING TEST PROCEDURES AND RESULTS SHALL BE CERTIFIED BYTHE CCXP.THE 5.INSTALLALL EQUIPMENT PER CODE AND MANUFACTURER'S INSTRUCTIONS;THESE DRAWINGS ARE DIAGRAMMATIC,REFER TO THE MECHANICAUPLUMBING <br /> 15A <br /> ELECTRICAL CONTRACTOR SHALL COORDINATE WITH THE GENERAL CONTRACTOR AND COMMISSIONING AGENT AS REQUIRED TO COMPLETE THE TEST EQUIPMENT COORDINATION SCHEDULE FOR CONNECTION REQUIREMENTS FOR SPECIFIC MECHANICAL AND PLUMBING EQUIPMENT.SEETHE PANEL <br /> PROCEDURES AND FINALIZE THE REPORT,REPORT SHALL NOTE DEFICIENCIES FOUND DURING TESTING,CORRECTIVE ACTION TAKEN OR THE ANTICIPATED SCHEDULES AND FEEDER AND BRANCH CIRCUIT SCHEDULES FOR CIRCUIT SIZES. A <br /> DATE OF CORRECTION,CONDITIONS UNDER WHICH THE TESTING WAS PERFORMED AND STATUS OF ANY DEFERRED TESTS. S.ALL ELECTRICAL DEVICES AND EQUIPMENT(LUMINAIRES,CONDUIT AND CABLING,ETC)SHALL BE INDEPENDENTLY SUPPORTED(I.E DO NOT SUPPORT <br /> A SUBMISSION OF THIS REPORT IS REQUIRED PRIOR TO FINAL ELECTRICALINSPEC71ONS AND CERTIFICATE OF OCCUPANCY. LUMINAIRES FROM MECHANICAL EQUIPMENT,ETC).PROVIDE SUPPORTS PER CODE AND AHJ REQUIREMENTS.' <br /> R ACOPY OF-THIS REPORT SHALL BE MADE AVAILABLE TO THE CODE OFFICAL. 7,ALL UTILITY INFRASTRUCTURE(POWER AND TELECOM)SHALL MEET THE UTILITY SERVICE PROVIDERS'REQUIREMENTS, - 38 NORTHWEST DAVIS,SUITE 3M <br /> 4. WITHIN 90 DAYS OF RECEIPT OF THE BUILDING CERTIFICATE OF OCCUPANCY,THE PROJECT RECORD DRAWINGS,08M MANUAL$,FINAL COMMISSIONING PORTLND,Ofl 97209 <br /> REPORT AMID DOCUMENTATION OF COMPLETED OWNER TRAINING SHALL BE SUBMITTED FOR REVIEW. 8,ALL NEW RACEWAYS AND CABLING SHALL BE INSTALLED CONCEALED WHEREVER POSSIBLE.AT OPEN CEILING AREAS,CONTRACTOR MUST PROVIDE 503,245,7100 <br /> CONDUCTORS I CABLING IN CONDUIT.COORDINATE THE ROUTING OF THE CONDUIT AT OPEN CEILING AREAS WITH THE ARCHITECT.ALL CONDUIT AND <br /> 5. RECORD DRAWINGS:SEE SPECIFICATIONS FOR REQUIREMENTS CABLING SHALL BE INSTALLED PARALLEL WITH BUILDING LINES.THE CONTRACTORS SHALL COORDINATEWITH THE CEILING TYPES IN ALL ROOMS AMID1505 STH AVE,SUITE 30D <br /> 6. OPERATIONS MAINTENANCE MATERIALS:SUBMIT ALL OFTHE FOLLOWING(SEE SPECIFICATIONS FOR ADDITIONAL REQUIREMENTS). ENSURE THAT ALL JUNCTION BOXES AR EACCESSIBLE AFTER THE WORK OF ALL TRADES IS COMPLETE JUNCTION BOXES SHALL NOT BE LOCATED ON HARD SEATILE,WA M101 <br /> A EQUIPMENT SIZE,SELECTED OPTIONS,AND REQUIRED MAINTENANCE. CEILINGS OR IN WALLS IN"FRONT OF HOUSE"SPACES WITHOUT PRIOR APPROVAL FROM ARCHITECT. 205.576.IEM <br /> B. LUMINAIRE PACKAGE WITH FINAL LUMINAIRES AND LAMPS(AS APPLICABLE)USED ON THE PROJECT WITH SELECTED 9.COORDINATE CONDUIT AND CABLING ROUTING WITH ALL OTHER TRADES PRIOR TO INSTALLATION TO AVOID CONFLICTS.ROUTE CONDUIT AS TO MINIMIZE <br /> OPTIONS INDICATED. PENETRATIONSTHROUGH PARTITIONS. 1014 HOWARD STREET <br /> C. FINALAPPROVED DEVICE SUBMITTALS(RECEPTACLES,SWITCHES,ETC) SNIT fPANCI5CO3G94103 <br /> D. MANUFACTURER'S08M MANUAL FOR EACH PIECE OFEQUIPMENT. 10.GOORDINATETHE EXACT LOCATIONS OF CEILING MOUNTED DEVICES WITH ALL OTHER TRADES.00CUPANCY/VACANCY SENSORS SHALL BE INSTALLED AT <br /> E. NAME AND ADDRESS OF SERVICE AGENCY. LEAST&FTORT EMANUFACTURER'S RECOMMENDED DISTANCE FROM ALL HVAC EXHAUST DIFFUSERS.LOCATE PHOTOCELLS PER MANUFACTURER'S 415.252.7N3 <br /> F. CONTROLS MAINTENANCE AND CALIBRATION INFORMATION INCLUDING WIRING DIAGRAMS,SCHEMATICS,RECORD INSTRUCTIONS. SO ANM0M MOM ARCHNEC6,INC. <br /> DRAWINGS AND CONTROL SEQUENCES.SETPOINTS SHALL BE PERMANENTLY RECORDED IN THESE DOCUMENTS. 11.COORDINATE THE LOCATIONS OF ALL WALL-MOUNTED DEVICES(OCCUPANCY SENSOR SWITCHES,LOW VOLTAGE WALL STATIONS,THERMOSTATS,ETC)WITH <br /> G. NARRATIVE OF HOW EACH SYSTEM IS INTENDED TO OPERATE LOCATIONS AND SWINGS OF ODORS,DO NOT LOCATE DEVICES SUCH THAT THEY WILL BE BEHIND ANY DOOR WHEN THAT DOOR IS OPEN WITHOUT PRIOR SIDER+BYERS ASSOCIATES,INC. <br /> 7. SYSTEMSTART UP:THE ELECTRICAL CONTRACTOR SHALL ENGAGE A CERTIFIED FACTORY SERVICE TECHNICIAN TO STARTUP ALL LIGHTING AND APPROVAL OF TH E ARCH ITECT. F <br /> RECEPTACLE CONTROLS SYSTEMS AND ENERGY METERING SYSTEMS ON THE PROJECT.SEE SPECIFICATIONS FOR ADDITIONAL REQUIREMENTS. MISCHAM ALANO EIEOTUOU. <br /> 12.BACK-TO-BACK DEVICES AR E NOT ALLOWED;INSTALL IN SEPARATE STU D CAVITIES. 192 NINERSON,SMITE 300 <br /> B. ELECTRICAL POWER AND LIGHTING SYSTEMS CON MISSNDNING:ELECTRICAL POWER AND LIGHTING SYSTEMS SUBJECT TO SECTION C405 OF TH E 13.THE ELECTRICAL CONTRACTOR SHALL PERFORM SHORT-CIRCUIT/FAULT CURR ENT AN D ARC FLASH STUDIES FOR THE PROJ ECT PER TH E ACT UAL INTENDED SEATTLE,WA 981M <br /> WASH INGTON STATE ENERGY CO DE SHALL BE INCLUDED IN THE COMMISSIONING PR CC EBB PER SECTIONS C408.1 AN D C408.3. INSTALLATION(FINAL GEAR SELECTION,ACTUAL FEEDER LENGTHS,ETC).STUDIESSHALL BE SUBMITTED TO THE ENGINEER WITH THE GEAR SUBMITTAL FOR 206.285,2966 <br /> 9. OWNER TRAINING'.PROVIDE SYSTEM/EQUIPMENT OVERVIEW(WHAT IT IS,WHAT IT DOES AND WHICH OTHER SYSTEMS AND OR EQUIPMENT DOES TT REVIEW.FINAL STUDIES SHALL BE STAMPED BYAN ELECTRICAL ENGINEER CURRENTLY REGISTERED IN THE THE STATE OF WASHINGTON AND SHALL BE <br /> INTERFACEWITH).REVIEW THE AVAILABLE OBM MATERIALS.REVIEW THE PROJECT RECORD DRAWINGS.PROVIDE HANDS-ON DEMONSTRATION OF ALL SUBMITTED TOTHE LOCAL AHJ.THE ELECTRICAL CONTRACTOR SHALL PROVIDE ARC FLASH LABELS ON ALL ELECTRICAL DISTRIBUTION EQUIPMENT PER <br /> NORMAL MAINTENANCE PROCEDURES,NORMAL OPERATING MODES,AND ALL EMERGENCY SHUTDOWN AND START-UP PROCEDURES.INCLUDEWRITTEN CODE AND AHJ REQUIREMENTS.SEETHE SPECIFICATION FOR ADDITIONAL REQUIREMENTS, <br /> DOCUMENTATION THAT ALL THE PREVIOUS HAS BEEN COMPLETED. <br /> 10. FINAL COMMISSIONING REPORT:THE CCXP SHALL COMPLETE AND CERTIFY THE RESULTS OF ALL FUNCTIONAL PERFORMANCE TESTS AND THAT THE 14.LIGHTING CONTROL COORDINATION MEETING.THE ELECTRICAL CONTRACTORSHALL COORDINATEA LIGHTING CONTROL COORDINATION MEETING WITH THE <br /> COMMISSIONING PLAN HAS BEEN FULLY EXECUTED,REPORT SHALL INCLUDE OWNER,ARCHITECT,ENGINEER,GENERAL CONTRACTOR,ELECTRICAL CONTRACTOR AND AN AUTHORIZED SERVICE REPRESENTATIVE OF THE INTENDED <br /> A DISPOSITION OF ALL DEFICIENCIES FOUND DURING TESTING,INCLUDING DETAILS OF CORRECTIVE MEASURES USED OR LIGHTING CONTROL SYSTEM FOR THE PROJECT TO DISCUSS THE LIGHTING CONTROL INTENT FOR THE PROJECT.THIS MEETING SHALL OCCUR AT LEAST TEN MTA^/� <br /> PROPOSED. (10)WORKING DAYS PRIOR TO SUBMITTING THE LIGHTING CONTROL SUBMITTAL;THE LIGHTING CONTROL SUBMITTAL SHALL REFLECT THE DECISIONS <br /> MADE VVV lJl//"\y`S <br /> B. ALLFUNC71ONAL PERFORMANCE TEST PROCEDURES USED DURING THE COMMISSIONING PROCESS INCLUDING DURING THIS MEETING <br /> MEASURABLE CRITERIA FOR TEST ACCEPTANCE,PROVIDED HEREIN FOR REPEATABILITY. 15.THE ELECTRICAL CONTRACTOR SHALL MARK LOCATIONS OF ALL DEVICES AND EQUIPMENT IN THE COMMON AREAS AND IN ONE OF EACH ROOM TYPE I FFICE, 1 <br /> 11. BUILDINGS OR PORTIONS THEREOF,SHALL NOT BE CONSIDERED ACCEPTABLE FOR FINAL INSPECTION UNTIL THE CODE OFFICIAL HAS RECEIVED ALETTER OF CONSULTROOM,ETC)IN THE PROJECT FOR THE OWNER AND ARCHITECT TO REVIEW AND APPROVE PRIOR TO ROUGH-IN IN THE REST OF THE PROJECT. u^� <br /> WHEN REQUESTED BYTHE ARCHITECT AND OWNER,THE ELECTRICAL CONTRACTOR SHALL RELOCATE DEVICES AND EQUIPMENT IN THE UNITS UP TOM(6) 1 e <br /> ffi <br /> TRANSMITTAL FROM THE BUILDING OWNER ACKNOWLEDGING RECEIPT OF THE PREUMINARYCOMMISSIONING REPORT.THIS MAY BEACCOMPLISHED BY FEET IN ANY DIRECTION AT NO COST TO THE PROJECT. <br /> SUBMITTING THE COMMISSIONING COMPLIANCE CHECKLIST. <br /> 16.THE PHOTOVOLTAIC(PV)SYSTEMIS DESIGN BUILD.ANY DEVICES/WD EQUIPMENT INDICATED ON THESE PLANS ARE PRELIMINARYFOR SPACE PLANNING <br /> 12. THE ELECTRICALCONTRACTORSHALLNOTRECONSIDEREDSUB6TANTIALLYCOMPLETEUNTILTHEPRELIMINARYCOMMI6610NINGREPORTHASBEEN ALL LOW VOLTAGE <br /> LOTUSAPPROVEDBYTHEENGINEER. 17.ALL LOW VOLTAGE SYSTEMS,INCWDING FIREALARM,AREDESION BUILD.PNV DEVICES AND EQUIPMENT INDICATED ON THESE BANS ARE PRELIMINARVFOR <br /> SPACE PLANNING PURPOSES ONLY.SEE PERFORMANCE SPECIFICATIONS FOR ADDITION INFORMATION AND REQUIREMENTS <br /> 16.THEDESIGN-BUILD LOW VOLTAGE CONTRACTOR SHALL DESIGN AND PROVIDE COMPLETE AND FULLYOPERATIONAL LOW VOLTAGE SYSTEMS PER THE <br /> REQUIREMENTS OF THE OWNER,THE LOCAL AHJ AND THE CONTRACT DOCUMENTS.THE CONTRACTOR SHALL PROVIDE ALL PARTS AND PIECES REQUIRED <br /> FOR THESE LOW VOLTAGE SYSTEMS INCLUDING BUT NOT LIMITED TO RACKS,PATCH PANELS,ROUTERS,PATCH CABLES,ETC.SEETHE PERFORMANCE development partners <br /> SPECIFICAT IONS FOR ADDITIONAL REQUIREMENTS,SEE ELECTRICAL DRAWINGS AND DIVISION 26,27 AND 28 SPECIFICATIONS FOR ADDITIONAL INFORMATION <br /> AND REQUIREMENTS. <br /> 10.THE TELECOM SYSTEM WIRING SHAH MEET TIA PERFORMANCE CRITERIA FOR CATEGORY S. <br /> 2D.WIRELESS ACCESS POINTS ARE TO BE PROVIDED BY THE OWNER;LOW VOLTAGE CONTRACTOR SHALL PROVIDE CAT 8 DROPS FOR ALL WAPS,TERMINATE <br /> CABLES,AND CONNECT COMPLETEWAPS.SEE E4.SERIES FOR PRELIMINARY QUANTITIES AND LOCATIONS.CONFIRM WITH OWNER. <br /> 21.THE DESIGN-BUILD FIRE ALARM CONTRACTOR SHALL DESIGN,PERM T AND PROVIDE COMPLETE AND FULLY OPERATIONAL FIRE ALARM AND DAS SYSTEMS <br /> MEETING THE REQUIREMENTS OF CODE,THE LOCAL AHJ AND THE FIRE MARSHAL.ANYDEVICES SHOWN ON THE ELECTRICAL DRAWINGS ARE SCHEMATIC FOR <br /> COORDINATION PURPOSES ONLY.SEE THE PERFORMANCE SPECIFICATIONS FOR ADDITIONAL REQUIREMENTS. <br /> 22.THE ELECTRICAL,PHOTOVOLTAIC AND FIRE ALARM CONTRACTORS SHALL MAKE ALL REQUIRED SUBMISSIONS TO THE AUTHORITIES HAVING JURISDICTION <br /> FOR PERMITS AND APPROVAL OF ALL ELECTRICAL AND FIRE ALARM SYSTEMS AND SHALL PAY ALL FEES ASSOCIATED WITH THESE SUBMISSIONS AND <br /> OBTAINING THE REQUIRED PERMIT(S).THE FIRE ALARM CONTRACTOR IS RESPONSIBLE FOR DESIGNING AND PROVIDING SYSTEMS THAT MEET ALL <br /> REQUIREMENTS OF CODE AND THE LOCAL AHJ;ALL ADDITIONS,REVISIONS,RESUBMITTALS,ETC REQUIRED TO OBTAIN AHJ APPROVAL SHALL BE CARRIED <br /> OUT BY THE FIRE ALARM CONTRACTOR AT NO ADDITIONAL EXPENSE TO THE OWNER.PROVIDE ACOPY OF THE FINAL APPROVED DRAWINGS WITH THE LOCAL <br /> AHJ'S APPROVAL STAMPTO THE OWNER FOR THEIR REG ROS. <br /> ENERGY CODE AND LEED NOTES w <br /> 1. THEPROJECT IS PURSUING LEE7 SILVER CERTIFICATION UNDER LEED V4 FOR NEW CONSTRUCTION.SEE DIVISION D1 f'OR ADOITIONAL INFORMATION, V) <br /> REQUIREMENTS AND SCORECARD.THE ELECTRICAL CONTRACTOR SHALL COORDINATE WITH THE GENERAL CONTRACTOR AND PROVIDE ALL Q <br /> DOCUMENTATION(RECEIPTS.PRODUCT INFORMATION,ETC)REQUIRED FOR LEED CREDITS I PREREQUISITES ANC(SHALL INCLUDE TIME FOR ATTENDING DEED T 0 <br /> COO R DINATION MEETINGS AS REQUIRED.FOR BIDDING PURPOSES,THE ELECTRICAL CONTRACTOR SHALL ASSUME EIGHT 2-HOUR LEED COORDINATION 2 N <br /> MEETINGS,CONFIRM EXACT REQUIREMENTS WI7H GENERAL CONTRACTOR.LEED SPECIALIST IS RWDI:503467-4710. Q� <br /> 2. SEETHE LUMINAIRE SCHEDULE LIGHTING AND RECEPTACLE CONTROL DRAWING,AND THE LIGHTING PLANS FOR LIGHTING AND LIGHTING CONTROL m <br /> REQUIREMENTS.SYSTEMS SHALL MEET THE APPLICABLE REQUIREMENTS OFC4D5. Y <br /> 3. OCCUPANCY SENSORS SHALL FAIL ON AND AUTOMATICALLY TURNOFF LUMINAIRES IN THEIR COVERAGE AREA WITHIN 30 MINUTES OF ALL OCCUPANCT8 <br /> LEAVING THE SPACE UNLESS NOTED OTHERWISE ON THE PLANS SEE LIGHTING CONTROL SCHEDULES FOR ADDITIONAL FUNCTIONALITY REQUIREMENTS, O <br /> 4. EXIT SIGNS SHALL NOT EXCEED S WATTS PER SIDE. J LU <br /> 5. LUMINAIRESIN ALL DAYLIGHT ZONES AS DEFINED BY THE ENERGY CODES ALL BE PROVIDED WITH DIMMING CAPABIUTIES.LUMINAIRES WITHIN THE PRIMARY of <br /> AND SECONDARY DAYLIGHT ZONES SHALL AUTOMATICALLY DIM TO OFF IN RESPONSE TO AVAILABLE DAYLIGHT PER CODE REQUIREMENTS. W <br /> S. LUMINAIRES IN THE PRIMARY AND SECONDARY DAYLIGHT ZONES SHALL BE CONTROLLED INDEPENDENTLY OF EACH OTHER AND OF NON-DAYLIGHT AREAS; W <br /> SEE LIGHTING PLANS FOR SPECIFIC CONTROL REQUIREMENTS FOR EACH SPACE.LUMINAIRES IN TOPLIGHT DAYLIGHT ZONES SHALL BE CONTROLLED > (_- <br /> SEPARATELY FROM LUMINAIRES IN SIDELIGHT DAYLIGHT ZONES. >Q <br /> 7. DAYLIGHT RESPONSIVE CONTROLS WITHIN EACH SPACE SHALL BE CONFIGURED TO COMPLETELY SHUT OFF ALL CONTROLLED LIGHTS EACH THAT ZONE AND > W <br /> 80 THAT THEY CAN BE CALIBRATED FROM WITHIN THAT SPACE BY AUTHORIZED PERSONNEL;CALIBRATION MECHANISMS SHALL BE READILY ACCESSIBLE 0 = <br /> B. DAYLIGHT RESPONSIVE CONTROLS SHALL INCORPORATE TIM&DELAY CIRCUITS TO PREVENT CYCLING OF LIGHT LEVEL CHANGES OF LESS THAN THREE O CW <br /> MINUTES 0 Q <br /> 9. A SINGLE DAYLIGHT RESPONSIVE CONTROL SHALL NOT CONTROL AN AREA LARGER THAN 2,500 SQUARE FEET. O m 0_ <br /> 10. OCCUPANT OVERRIDE OF DAYLIGHT DIMMING CONTROLS I$NOT PERMITTED OTHER THAN TO REDUCE LIGHT OUTPUT FROM THE LEVEL ESTABLISHED BY THE N <br /> CN <br /> DAYLIGHTING CONTROLS. co M 0 <br /> 11. LUMINAIRES SERVING THE EXIT ACCESSAND PROVIDING MEANS OF EGRESS ILLUMINATION REQUIRED BY THE IBC SHALL BE CONTROLLED BY A COMBINATION <br /> OF LISTED EMERGENCY RELAY AND OCCUPANCY SENSORS OR SIGNAL FROM ANOTHER BUILDING CONTROL SYSTEM THAT AUTOMATICALLY SHUTS OFF THE <br /> LIGHTING WHEN THE AREAS SERVED BY THAT ILLUMINATION ARE UNOCCUPIED.SEE LIGHTING PLANS. <br /> 12. EXTERIOR LUMINAIRES THAT ARE INTENDED TO LIGHT THE BUILDING FACADE OR LANDSCAPE SHALL HAVE CONTROLS THAT AUTOMATICALLY SHUT OFF THE <br /> LIGHTINGAS A FUNCTION OF DAWN DUSKAND A SET OPENING AND CLOSINGTIME. REVISION DATE REASON FOR ISSUE <br /> 13. EXTERIOR LUMINAIRES OTHER THAN BUILDING FACADE AND LANDSCAPE LIGHTING AND LIGHTING FOR COVERED VEHICLE ENTRANCES OR DOTS FROM 2 OB20.22 OMP ADDENDUM <br /> BUILDINGS OR PARKING STRUCTURES SHALL HAVE CONTROLS CONFIGURED TO AUTOMATICALLY REDUCE CONNECTED LIGHTING POWER BY AT LEAST 30 <br /> PERCENT FROM NO LATER THAN MIDNIGHT TO SAM OR FROM ONE HOUR AFTER BUSINESS CLOSING TO ONE HOUR BEFORE BUSINESS OPENING OR DURING <br /> ANY PERIOD WHEN NO ACTIVITY HAS BEEN DETECTED FOR A PERIOD OF NO LONGER THAN 15 MINUTES, <br /> 14. ELECTRICAL TRANSFORMERS,EXCEPT THOSE MEETING EXCLUSION REQUIREMENTS OF C405,6,SHALL MEET THE MINIMUM EFFICIENCY REQUIREMENTS OF <br /> TABLE C405.6 IN THE WASHINGTON STATE ENERGY CODE AS TESTED AND RATED IN ACCORDANCE WITH THE TEST PROCEDURE LISTED IN DOE 10 CFR 431, <br /> 15, ALLELECTRIC MOTORS SHALL MEET THE EFFICIENCY REQUIREMENTS OF TABLES C405.8(1)THROUGH C40594)IN THE WASHINGTON STATE ENERYCODE SOO APPROVAL STAMP <br /> FAN MOTORS 1112 HP UP TO I HP SHALL BE ECM PER C406S. <br /> 1S. AT LEAST 50%OF ALL 125V,1&AND 20-AMP RECEPTACLE INSTALLED IN PRIVATE OFF ICES,OPEN OFFICES,CONFERENCE ROOMS,ROOMS USED PRIMARILY <br /> FOR PRINTING AND/OR COPYING,BREAK ROOMS,INDIVIDUAL WORKSTATIONS AND CLASSROOMS(INCLUDING THOSE INSTALLED IN MODULAR PARTITIONS <br /> AND MODULAR OFFICE WORKSTATION SYSTEMS)SHALL BE CONTROLLED AS REQUIRED BY SECTION C405.10 OF THE WASHINGTON STATE ENERGY CODE,SEE <br /> LIGHTING AND RECEPTACLE CONTROL SHEET AND POWER PLANS FOR ADDITIONAL INFORMATION, <br /> 17.CONTRACTOR MUST COMPLYWITH WASTE MANAGEMENT PRACTICES AS PER LEED V4 REQUIREMENTS.'. <br /> 18, ALLSEALANTS,ADHESIVES AND COATINGS MUST COMPLY WITH LEED V4 LOW VOL REQUIREMENTS. <br /> 19. THE BUILDING SHALL BE COMMISSIONED PER THE REQUIREMENTS OF SEC71ON C408 AND LEED.SEE COMMISSIONING NOTES,THIS DWG AND DIVISION 01. <br /> 2D. ENERGY METERING SYSTEMS SHALL MEET THE REQUIREMENTS OF SECTION C409 AND LEED AND SHALL MEASURE,MONITOR,RECORD AND DISPLAY ENERGY <br /> CONSUMPTION DATA FOR EACH ENERGY SOURCE AND THE FOLLOWING END USE CATEGORIES:INTERIOR LIGHTING,RECEPTACLE PLUG LOADS,HEAT PUMPS, <br /> AND MECHANICAL FANS AS REQUIRED BY LEED.CONTRACTOR TO COORDINATE WITH THE PLUMBING CONTRACTOR TOE SURE GAS USAGE INFORMATION IS <br /> ALSO TIED INTO THE METERING SYSTEM.' - PROJECT NOTES <br /> GMP SET <br /> DATE PROJER NUMBER <br /> 09.20.2022 21016 <br /> SHEET NUMBER <br />