Laserfiche WebLink
FLAG NOTES Q: <br /> A <br /> 1. IN-BUILDING UTILITY TRANSFORMER VAULT TO BE INSTALLEDAND BUILT 4tio N -1 <br /> 14 15 OUT PER SNOPUD STANDARDS AND REQUIREMENTS;SEE SNOPUD =qo� <br /> CONSTRUCTION LETTER AND DRAWINGS.FIELD VERIFY INSTALLATION `' z <br /> REQUIREMENTS WITH SNOPUD INSPECTOR.THE ELECTRICAL <br /> Y p CONTRACTOR SHALL PROVIDE ALL EQUIPMENT,PARTS,AND <br /> 702,G B COMPONENTS NECESSARY FOR A COMPLETE INSTALLATION PER SNOPUD A>. <br /> OL2P- <br /> STANDARDS AND REQUIREMENTS. <br /> THE CONTRACTOR SHALL COORDINATE SNOPUD INSPECTION OF ALL <br /> UTILITY-RELATED WORK PRIOR TO BACK-FILLING. <br /> ;�T <br /> 02 2. PRIMARY SERVICE CONDUITS FROM SNOPUD CONNECTION POINT UP INTO <br /> U ------------y------------------------1 TRANSFORMER VAULT.SEE SITE PLANS AND SINGLE-LINE DIAGRAM FOR,OFI ' 702,GFI QUANTITIES AND SIZES.INSTALL PER SNOPUD REQUIREMENTS.INSTALL <br /> OL2P-2 L2P-20 PER SNOPUD STANDARDS;FIELD VERIFY REQUIREMENTS AND ROUTING • • <br /> MB" ii OL2M-21 WITH SNOPUD INSPECTOR.PROVIDE A MINIMUM 1/4-INCH <br /> OL2M-21,,25 POLYPROPYLENE OR POLYESTER PULL ROPE OR 1/2-INCH POLYESTER <br /> PULL TAPE IN EACH CONDUIT.CONDUITS MUST STUB UP AT LEAST <br /> 38 NORTHWEST DAVIS,SUITE 300 <br /> NL L2EV 14 5 24-INCHES ABOVE THE FINISHED FLOOR OF THE VAULT;STUB UPS ARE TO PORT 5.710AND.OR 9]209 <br /> sD3.z4s.TmD <br /> a BE CONCRETE ENCASED PER SNOPUD REQUIREMENTS. <br /> GENERATOR WITH <br /> r LCP SUB-BASE TANK SEAS TLETH AVE,BUTTE 300 <br /> PROVIDE AND INSTALL A PULLING IRON ON THE CEILING ABOVE THE BEATTLE,WA 58101 <br /> PRIMARY SERVICE CONDUITS PER SNOPUD REQUIREMENTS.PULLING M6476.1600 <br /> IRON MUST BE DESIGNED FOR A MAXIMUM AXIAL LOAD OF 10.000 LBS. 1014 HOWARD STREET <br /> PNL L2L COORDINATE INSTALLATION WITH STRUCTURAL AND GENERAL <br /> PNL L2 -----, bAN FRANCI8C0.CA 84103 <br /> OL2P-20 CONTRACTOR. 41s.zsza033 <br /> 702,GFI <br /> O ANKROM MOISAN ARCHITECTS,INC. <br /> PNL OL2L 702,GFI 3. SECONDARY SERVICE FEEDERS FROM SNOPUD TRANSFORMER VAULT TO <br /> -------------'- OL2P-20 <br /> ....................................... <br /> -- MAIN ELECT ROOM BELOW.SEE SINGLE-LINE DIAGRAM FOR CONDUCTOR SIDER+BYERS ASSOCIATES,INC. <br /> PNL L2M 702,GFI SPACE OR AND CONDUIT SIZES AND QUANTITIES,INSTALL PER SNOPUD F �� <br /> OL21 1 FUTUR PV o 00 o STANDARDS;FIELD VERIFY REQUIREMENTS AND ROUTING WITH SNOPUD MECHANICAL AND ELECTRICAL\` <br /> SYSTE 0000 <br /> 0 o o 192 NICKERSON,SUITE 300 <br /> INSPECTOR. <br /> 13 EQUIPM NT O� SE.286.2ATTLE WA 88109 <br /> — — A 4. CONTRACTOR SHALL PROVIDE AND INSTALL FOUR(4)5/8-INCH x 8-FOOT 208.286.296E � <br /> mRRG` COPPER CLAD STEEL GROUND RODS LOCATED NEAR THE CORNERS OF <br /> THE VAULT(MINIMUM OF&INCHES FROM THE WALLS UNLESS OTHERWISE <br /> J L J APPROVED BY SNOPUD)PER SNOPUD REQUIREMENTS.THE GROUND <br /> 702 ATS 5 AND <br /> ARESHALL <br /> B BE PACED T AND LEASINSTALLEDAPART AND UD SHALL PROTRUDE <br /> 6 C MPS <br /> `l AND SHALL BE SPACED AT LEAST 8-FEET APART AND SHALL PROTRUDE 8 <br /> 22 INCHES ABOVE THE FINISHED FLOOR OF THE VAULT.THE CONTRACTOR <br /> �702, FI PRIMARY SERVICE SHALL INSTALL GROUND WIRE ALONG THREE WALLS OF THE VAULT, <br /> FEEDERS 18-INCHES ABOVE THE VAULT FINISHED FLOOR. T T_ <br /> kOPTIO ratf <br /> OL2MP L O M P L OL P C7 2�Fl05. DRY SUMP PER SNOPUD REQUIREMENTS.OL2M- <br /> L2P-6 GROUND 6. ELECTRICAL CONTRACTOR TO PROVIDE 7-FT TALL ADJUSTABLE 2-POST <br /> FACP CT CT T OL2P-16BAR <br /> 1 SERVER RACKS WITH VERTICAL CABLE MANAGEMENT AND POWER LOTUS <br /> STRIPS AS INDICATED.FIELD VERIFY LOCATIONS AND QUANTITIES WITH <br /> OL 0 P-2 OL2P-4 C DESIGN-BUILD LOW VOLTAGE CONTRACTOR.RACKS ARE TO BE BOLTED <br /> 70211 FI OL2P-14 (� L2P-2 TO AND ELECTRICALLY ISOLATED FROM THE CONCRETE FLOOR SLAB. <br /> P-22 oL2P�22 ——J development partners <br /> 702,GFI T ) OL2P-8 9 I'9 O OL2P-18 — DARa=SE B ELECTRICAL CONTRACTOR TO PROVIDE ONE LS•20R RECEPTACLE AT <br /> 8 8 02P_14 FEEDERS TO EACH RACK.FIELD VERIFY EXACT LOCATION WITH DESIGN-BUILD LOW <br /> p. T 0 -10 L2P4 ELECTRICAL RM VOLTAGE CONTRACTOR.RECEPTACLES TO BE INSTALLED ON CABLE <br /> TRAY ABOVE RACKS.EACH QUAD OUTLET SHALL BE CONNECTED TO A <br /> L 2 GFI V+4 C L _J n� TYPICAL o oo 0 5 DEDICATED 120•VOLT,20•AMP CIRCUIT <br /> 0 7Fit 7. 0 o o ELECTRICAL CONTRACTOR TO PROVIDE A SPECIALTY RECEPTACLE AT <br /> 770022pG22 Typ 7 B TVP -___________________________________ THE BOTTOM OF EACH RACK FOR UPS EQUIPMENT.CONFIRM ACTUAL <br /> UPS CONNECTION REQUIREMENTS WITH DESIGN-BUILD LOW VOLTAGE <br /> ENLARGED PLAN - LEVEL 2 ENLARGED PLAN - LVL 2 ON A DEDICATED <br /> 30BID0 CIRCUIT.RPOSES,ASSUMEANEMA&30 RECEPTACLE <br /> ON A DEDICATED 30A,120V CIRCUIT. <br /> GENERATOR, EMER & MAIN ELECTRICAL ROOMS r TRANSFORMER VAULT RACK AND UPS RECEPTACLES TO BE CONNECTED TO THE 702 OPTIONAL <br /> STANDBY SYSTEM. <br /> PROVIDE AND INSTALL GROUND BAR AT EACH EQUIPMENT RACK,LISTED <br /> FOR INTENDED USE,BOND EACH EQUIPMENT RACK GROUND BAR TO <br /> MAIN BUILDING GROUND BAR USING NON-REVERSIBLE <br /> OL3P-25 HIGH-COMPRESSION TWO-HOLE LUGS. <br /> p LV UPI DO 702,GFI 7. PROVIDE 18-INCH LADDER STYLE CABLE TRAY IN TELECOM CLOSETS; <br /> GROUND BAR CONFIRM SIZE AND ROUTING WITH DESIGN-BUILD LOW VOLTAGE <br /> 702 GFI CONTRACTOR.ALL CABLE TRAY SECTIONS ARE TO BE ELECTRICALLY Lu <br /> 01_21`-0 OL2P-11 +48"► OL3b-25 ® BONDED TOGETHER PER CODE AND AHJ REQUIREMENTS AND <br /> -7 T CT QT CONNECTED TO THE BUILDING GROUNDING SYSTEM. Q <br /> ' BOND METAL CABLE TRAYS PER CODE REQUIREMENTS TO GROUND BAR <br /> L2P 21 O P-23 OL2P-25 CT <br /> P L OL3 PLO L PNL <br /> OL2P-1 OL3 02 CT USING q8 AWG STRANDED COPPER CONDUCTORS WITH GREEN JACKETS a. <br /> I OL2P-19 702 L3P PNL L3P AND NON-REVERSIBLE HIGH-COMPRESSION TWO-HOLE LUGS.REMOVE Q <br /> OL2M-7 OL2 19 20 O k4 CT CT CT 702 PAINT FROM CABLE TRAY AT AREAS WHERE LUGS WILL BE INSTALLED Y <br /> OL2M-9 10 - -- PRIOR TO INSTALLING LUGS USING ANTIOXIDANT JOINT COMPOUND AND V <br /> PN LiH OL3PB 00P-1 F <br /> OL2P 7 g g ryp. PNL 235 1 STAINLESS STEEL HARDWARE. Q I- <br /> PNL IP L2P-1 9 C 1 L3M PNL OL3M m K <br /> 702,GFI TYp, OL3P-1 BOND SECTIONS OF CABLE TRAYS USING p6 AWG STRANDED COPPER UJ <br /> OL2P-2 OL2P-5 f�q <br /> 3P-1 0 - CONDUCTORS WITH GREEN JACKETS AND NON-REVERSIBLE > <br /> CT C FI HIGH-COMPRESSION TWO-HOLE LUGS.REMOVE PAINT FROM CABLE uJ 2 <br /> fl ��py TRAY AT AREAS WHERE LUGS WILL BE INSTALLED PRIOR TO INSTALLING Q > <br /> Jlt TMP 7 8 TYP. -0 702 �c- <br /> CT EMER-L(STACKE D NVERTERS — LUGS.TYPICAL FOR ALL CABLE TRAY SECTIONS/RUNS. Q <br /> — 2-HOUR DAB SHAFLd <br /> T 8. THE OVERHEAD CABLE TRAY AND EQUIPMENT RACKS SHALL BE 0 Q <br /> OL P-6 OL3702 ELECT UP/DOWN DESIGNED AND INSTALLED AS AN INTEGRATED SYSTEM CAPABLE OF Q Q <br /> 702 71SUPPORTING THE MAXIMUM RATED LOADS OF THE RACKS.SYSTEM O co IL <br /> 6 8 TYR SHALL MEET SEISMIC REQUIREMENTS OF CODE,THE LOCAL AHJ AND PER N 2 <br /> THE PROJECTS STRUCTURAL ENGINEER.SEE SPECIFICATIONS FOR O <br /> ENLARGED PLAN - ENLARGED PLAN - ENLARGED PLAN - ELECT ADDITIONAL INFORMATION AND REQUIREMENTS. m <br /> E L E C R M LVL 1 �� T E L E R M LVL 1 5 AND TELECOM R IM S LVL 3 9. INSTALL FIRE RATED BACKBOARD MOUNTED TO WALLS INDICATED <br /> (CONFIRM WITH ARCHITECT).A/C GRADE SHEETS 4-FT X 8-FT X 3/4-INCH. <br /> 1/4'=1'-O" 1/4'-1'-O' 1/4'=1'-0' TOP OF SHEETS TO BE M'AFF.ALL EDGES TO BE SMOOTH AND REVISION DATE REASON FOR ISSUE <br /> SPLINTER-FREE.PAINT TO MATCH FINISHED WALLS WITH FIRE 2 09.06.22 PERMIT REVISIONS <br /> RETARDANT PAINT. 3 09.20.22 GMP ADDENDUM <br /> u._._.. •N 4 1az0.z2 ASI-01 <br /> LV UP/DO 10 SUPPLIES WITH TIONS AND HE DESIGN-BUILD FIRE ALARM CONTRACTORTITIES OF FIRE ALARM . <br /> 702,GFI <br /> POWER 5 10.zzz3 Asl-04 - <br /> 702,GF5 <br /> B 7 7GROU SDCI APPROVAL STAMP <br /> GROUND BAR 11. PROVIDE CONCRETE BASE FOR GENERATOR.FINAL SIZE PER <br /> OL4 MB"► 2-HOUR DAB CLOS <br /> MANUFACTURER'S SEISMIC MOUNTING INSTRUCTIONS.COORDINATE <br /> 7020Y CT <br /> WITH STRUCTURAL ENGINEER AND ARCHITECT. <br /> OL3M-20 <br /> OL4P-2 10 OL3M-22 12. CONFIRM LOCATIONS AND CONNECTION REQUIREMENTS OF FIRE ALARM <br /> T <br /> CT OL4P-1 702 P L 0 P CONTROL PANEL,REMOTE ANNUNCIATOR AND FIRE ALARM SYSTEM <br /> C PNL LAP <br /> POWER SUPPLIES WITH FIRE ALARM CONTRACTOR. <br /> 2 <br /> 9 OL4PB 19 C 7 p� OL4P-25 <br /> TYP. o702,GFI 13. PROVIDE DATA CONNECTIONS AS NEEDED TO SUPPORT BUILDING <br /> OL4P-1 O L4P-1 702 1 ENERGY METERING SYSTEM AND ALL METERS;SEE SINGLE LINE <br /> Tl L4P-29 IST PNL L4H FUTURE PV DIAGRAM.COORDINATE REQUIREMENTS AND LOCATIONS FOR DDC <br /> OL�P02 EQUIPMENT SYSTEM METERING WITH MECHANICAL CONTRACTOR.COORDINATE <br /> OL4P-1 Iq L4P•1 EQUIPMENT <br /> REQUIREMENTS AND LOCATIONS FOR ELECTRICAL DIGITAL METERS WITH ENLARGED PLANS <br /> IT 702,GFI ELECTRICAL CONTRACTOR. <br /> _ _ _ _ _ 14. PROVIDE CIRCUITS FOR GENERATOR BLOCK HEATER AND BATTERY <br /> 102 4H CHARGER.CONNECT COMPLETE PER CODE AND MANUFACTURER'S <br /> g g 2-HOUR AS SHAFT INSTRUCTIONS.FIELD VERIFY CONNECTION REQUIREMENTS AND ASI-04 SET <br /> Typ, ELECT UPI DOWN LOCATIONS. <br /> ENLARGED PLAN - ELECT <br /> AND TELECOM RMS LVL 4 <br /> DATE PROJECT NUMBER <br /> 10.20.2022 21016 <br /> 1/4-=1'-O• EETNUMBER .. <br />