My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
3322 BROADWAY 2023 COMPASS HEALTH Plans 2025-09-26 (2)
>
Address Records
>
BROADWAY
>
3322
>
COMPASS HEALTH
>
Plans
>
3322 BROADWAY 2023 COMPASS HEALTH Plans 2025-09-26 (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/26/2025 3:06:04 PM
Creation date
9/26/2025 3:03:57 PM
Metadata
Fields
Template:
Address Document
Street Name
BROADWAY
Street Number
3322
Tenant Name
COMPASS HEALTH
Permit
E2311-160
Year
2023
Notes
ELECTRICAL FOR New buildout of Compass Health building
Address Document Type
Plans
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
37
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SHEET NOTES: FLAG NOTES 0: <br /> A. ALL RECEPTACLES IN AREAS ACCESSIBLE TO CLIENTS AND/OR THE 1. ALL HP-UNITS AND BC-UNITS ARE PROVIDED BY OTHERS WITH 208V/1PH <br /> PUBLIC ARE TO BE UL LISTED TAMPER RESISTANT AS PER THE CONDENSATE PUMP,ELECTRICAL CONTRACTOR TO CONNECT PUMP TO <br /> REQUIREMENTS OF NEC 406.12(5). SAME CIRCUIT AS MECHANICAL UNIT AND PROVIDE DISCONNECTS PER <br /> CODE REQUIREMENTS.FIELD VERIFY CONNECTION LOCATIONS AND <br /> B. SEE POWER PLANS FOR RECEPTACLES FOR GENERAL PURPOSE, REQUIREMENTS WITH MECHANICAL CONTRACTOR.TYPICAL FOR ALL HP- <br /> APPLIANCES,ETC. AND BC-UNITS. <br /> t <br /> C. AREAS ABOVE CEILINGS IN PROJECT ARE BEING USED AS RETURN AIR 2. PROVIDE POWER CONNECTIONS FOR DOC SYSTEM POWER SUPPLIES. <br /> PLENUMS.CONTRACTOR TO USE PLENUM RATED CABLE/INSTALLATION FIELD VERIFY EXACT LOCATIONS AND REQUIREMENTS WITH MECHANICAL <br /> TO MEET CODE REQUIREMENTS. CONTRACTOR. <br /> 3. ALL FSDS ARE TO BE CONNECTED TO THE 702 OPTIONAL STANDBY <br /> SYSTEM.CONNECT ALL FSDS ON LEVEL i TO CIRCUIT OL2M-1.FIELD <br /> VERIFY EXACT LOCATIONS AND CONNECTION REQUIREMENTS.CONNECT <br /> COMPLETE PER CODE REQUIREMENTS.TYPICAL FOR ALL FSDS ON LEVEL. A <br /> 4. LAV PROVIDED WITH TRANSFORMER FOR SENSORED FAUCET BY 3s xoRrmlEST DAVIS,sunE Sao <br /> PLUMBING CONTRACTOR.ELECTRICAL CONTRACTOR TO PROVIDE POUMS.ON 97209 <br /> RECEPTACLE BEHIND LAV SHROUD ON GFCI PROTECTED CIRCUIT FOR 503.245.71. <br /> TRANSFORMER;FIELD VERIFY EXACT LOCATION.CONFIRM EXACT <br /> REQUIREMENTS WITH PLUMBING CONTRACTOR. 15055THAVE,SUITE 30o <br /> SFATTI{WA 98101 <br /> 5. PROVIDE POWER FOR IRRIGATION CONTROLLER,ONE 0.75-INCH CONDUIT M.576.1600 <br /> WITH PULLSTRING FROM THE IRRIGATION CONTROLLER TO THE RAIN 1014HOWARDSTREET <br /> SENSOR AND ONE 0.75-INCH CONDUIT WITH PULLSTRING FROM THE SAN FRANLISCO,(A94103 <br /> IRRIGATION CONTROLLER TO BELOW THE BUILDING FOUNDATION AND 4®ANgIOM15252.]063 <br /> OUT INTO PLANTING AREA.FIELD VERIFY EXACT LOCATION WITH <br /> MWSAN AFQIRECfS,INL <br /> IRRIGATION SYSTEM INSTALLER. <br /> SIDER+BYERS ASSOCIATES,INC. <br /> 6. CONFIRM CONNECTION REQUIREMENTS FOR FIRE SPRINKLER SYSTEM r(�� <br /> AIR COMPRESSOR WITH DESIGN-BUILD CONTRACTOR.ADVISE ENGINEER MEGavacALANDEIECRUEAL ,` <br /> OF CONFLICTS. 192 NiGCFxs0x,SURE 300 <br /> SFATRF WA99109 <br /> 206.2852956 <br /> 7 O8 9 10 11 12 13 14 1g C MPIASS <br /> Health <br /> I I I I I I I I I <br /> LcJT U S <br /> ——— — — —————— —— — — — — — — — — — — — — — — —— ————— — — <br /> development partners <br /> I I I I I I I I li I <br /> I <br /> I I I li I I I I I <br /> I I I I I I I I I <br /> I <br /> I <br /> I <br /> I I I I I I I I I <br /> I � I <br /> 3 TYPICAL FOR <br /> ALL FSDS ON 1 TYPICAL <br /> THIS LEVEL <br /> Lu <br /> � I <br /> - -—_ _ _ _ _ _ _ _ _ _ _ <br /> L1 -6 <br /> 0 <br /> LAV-2 4 1 LAV-2 4 HP•153 - <br /> N <br /> L2M-27 L2M-27 -- LiH-9,11 " UP d <br /> -_- V � <br /> L1H-9,111 O <br /> —- -—- - - - --- - - - - - _ P-152 ® HP-140 - - - - LU <br /> 1H-9,11 L1H-9,1 <br /> coD UJ <br /> 1 , <br /> _ - r- - <br /> '�I 1 I BGi ®_Li_H-5,7 - ... _ . <br /> ® -_- � <br /> OF w <br /> L2M-25 L7 1BC-2 — � <br /> BC-3 Q <br /> 1H-13,1 MOL2M-11 T�=nQ <br /> 1 <br /> MOL2M-11 1 - , N <br /> g <br /> ® LiH-5,7 00 <br /> UP HP-101 LAV•2 4 <br /> r T <br /> F7 <br /> 1 L1H-1,3 i--- M-27 HP-133 <br /> HP-104 ® HP-120 - _. - --_ EWHLl -8 5 L2 33 REVISION DATE _ _ REASON FOR ISSUE _ <br /> LiH-1,3 LiH5,7 2 092022 GMPADOENDUM <br /> LL <br /> - - - - - E <br /> EWH� fl '-- r-- © <br /> iH-8 _ <br /> _ - OL2 17,19 _--- -- <br /> UP B �'`T __ LAV-2.�.4 __ SDO APPROVAL STAMP <br /> L2M-27 <br /> 1 ® ®L1H-9,11 <br /> HP-123 L2M-27 <br /> I <br /> LiH-9,11 - <br /> li 0�1 <br /> ♦'•'� -I'-1 <br /> L11-1-1 , H®45 <br /> I -- LiH-13,15 <br /> RCP-2� LAV-2 4 <br /> _,- L2M-27 <br /> ' � LEVEL 1 FLOOR PLAN- <br /> - - MECHANICAL <br /> GMP SET <br /> A B <br /> I I I I I I I I I <br /> D C OATS PRO11 NUMBER <br /> e 09.20.2022 21016 <br /> SCALE:IEL� o KEY FLOOR PLAN - MECHANICAL CONNECTIONS PLAN SHEET NUMBER <br /> N <br /> 0 4 8 16 32 <br />
The URL can be used to link to this page
Your browser does not support the video tag.