Laserfiche WebLink
114 <br /> OVERFLOW PREVENTION <br /> SIMPLEX COMPACT AUTOMATIC VALVE.CONNECT TO CONTROL PANEL <br /> FUEL PORT W/SPILL <br /> CONTAINMENT&INTEGRAL R 1106 po <br /> &rr CHECK VALVE.LOCATED PER PLANS. oxeU <br /> CONTROL PANEL PROVIDES <br /> MINIMUM OF 5'FROM ANY OVERFILL PROTECTION&OVERFLOW <br /> BUILDING OPENING PER PREVENTION PER IFC 5704.2.9.5 1 2"FUEL OIL <br /> IFC 5704.2.7.5.2 <br /> LOW VOLTAGE WIRING BY M.C.IN CONDUIT <br /> 2" <br /> SIMPLEX COMPACT LIQUID LEVEL SWITCH A <br /> AUTOMATIC FUEL <br /> PORT 2"FUEL OIL 38 NORTHWEST DAVIS,SUITE 300 <br /> O ® PORTLAND,OR 97209 <br /> 503.245.7100 <br /> 1505 5TH AVE,SUITE 300 <br /> 0 0 J I:- <br /> : 206576.1E OA 98101 <br /> MAXIMUM OF 5'AFF <br /> 1014 HOWARD STREET <br /> PER IFC 5704.2.7.5.E 4 i i; SAN FRANCISCO,CA 94103 <br /> I I 415.252.7063 <br /> FINISHED FLOOR ; — <br /> I ©ANKROM MOISAN ARCHITECTS,INC. <br /> I <br /> I <br /> 2"TANK,4"EMERGENCY J i i i SIDER+BYERS ASSOCIATES,INC. <br /> &6"INTERSTITIAL SPACE 2"FUEL OIL J ;i MECHANICAL AND I��\ <br /> VENT TERMINATIONS i ELECTRICAL <br /> ON ROOF.TERMINATIONS i i 90%STOP — 95%HIGH LEVEL ALARM 192 NICKERSON,SUITE 300 <br /> SEATTLE,WA 98109 <br /> MORE THAN 12'A.F.G. ; FILLING 206.285.2966 <br /> AND 5'FROM BUILDING OPENINGS i I ALARM <br /> PER REQUIREMENTS OF <br /> FUEL FILL PORT ELEVATION IFC5704.2.7.3.3 ` <br /> I <br /> P4.01 1/2"=,'-O' <br /> 35%LOWC ' <br /> — — PASS <br /> LEVEALARMREQUIREMENTS FOR FUEL PORTS H <br /> ealth <br /> 9 <br /> • MUST BE 5 FEET FROM ANY OPENINGS(DOORS,WINDOWS-OPERABLE AND FIXED)NOTE:NO EXCEPTION FOR RATED GLAZING. <br /> • MUST BE 5 FEET FROM PROPERTY LINE.FOR A ZERO LOT LINE BUILDING ON A SIDE THAT IS FACING THE STREET,THE PROPERTY LINE IS DEFINED AS 3 LIQUID LEVEL SWITCH DETAIL LET U S <br /> 2"FUEL OIL,2"TANK VENT, <br /> THE OPPOSITE EDGE OF THE STREET. 4"EMERGENCY VENT&6" P4.01 N.T.S. <br /> • MUST BE 10 FEET FROM ANOTHER BUILDING. INTERSTITIAL SPACE VENT TOFUEL TANK IN GENERATOR ROOM GENERATOR FUEL TANK.TANK development partners <br /> • THE MEASUREMENT OF STARTS AT THE HOSE CONNECTION OF THE PORT,NOT THE EDGE OF THE BOX. LEVEL TWO BY E.C.CONNECTIONS BY P.C. <br /> TANK BY ELECTRICAL <br /> 2 FUELING SYSTEM ISOMETRIC <br /> P4.01 N.T.S. <br /> W <br /> = CD <br /> 120V,1PH POWER BY E.C. NOTES: a N <br /> 4'X4'4#LEAD ROOF SUMP RECESS UNDER rn <br /> MIN.SPACING 1.TERMINATION HEIGHT ROOFING FELT&B.U.ROOF OR MEMBRANE. Y <br /> SOLENOID VALVE OPEN STAINLESS STEEL C.A.INTAKE PER MFR'S GUIDELINES ABOVE ROOF PER <br /> TERMINATION TO BE PER WATER MFR'S GUIDELINES. V H <br /> HEATER MANUFACTURER COMBINED ROOF AND O <br /> SOLENOID VALVE CLOSE OVERFLOW DRAIN J LU <br /> ASSEMBLYOF <br /> Co LU <br /> TANK LEVEL INDICATOR TANK LEVEL INDICATOR DECCK <br /> STAINLESS STELL FLUE. LU = <br /> TERMINATION TO BE 0 Q � J <br /> CONTROL PANEL& PER WATER HEATER Q <br /> SUPPORT BRACKET STORM COLLAR,AFFIX MANUFACTURER. <br /> TO PIPE,SEAL <br /> WATER TIGHT(TYP) SLOPE:1/4"/V-0" UNDER DECK 0 Q fn <br /> O 2"NPT FUEL OIL (TYPICAL) CLAMP(TYP) Q O fn <br /> O 000° PIPE TO GENERATOR ___ ___ Co d <br /> 0 ° ROOFING BOOT SEAL WATER RISER EADER W N <br /> (TYP) TIGHT(TYP) 0 <br /> N Q <br /> POWER SWITCH ° FUEL PORT MEETS m m U <br /> AUTOMATIC REQUIREMENTS OF ROOF OVERFLOW MUST <br /> FUEL PORT ° IFC 5704.2.9.7.6 AND COMBINE WITH <br /> IFC 5704.2.9.7.7 RAINLEADER IN <br /> VERTICAL REVISION DATE REASON FOR ISSUE <br /> NEOPRENE EXPANSION JOINT z 09.20.22 GMP ADDENDUM <br /> DIESEL 32-1/2" <br /> OR NO-HUB CONNECTION <br /> PADLOCK TAB <br /> o NOTES: <br /> o SEE FLOOR PLANS 1.VERIFY ROOF DECK <br /> RAIN LEADER PIPE ROUTING STRUCTURE ON ARCH. SDCI APPROVAL STAMP <br /> DRAWINGS. <br /> 24" 20" 2.RAINLEADER AND OVERFLOW PIPING <br /> 2 TO BE ROUTED HORIZONTALLY <br /> FRONT VIEW SIDE VIEW BEFORE COMBINING IN THE <br /> VERTICAL PER UPC REQUIREMENTS. <br /> 3.INSULATE AND <br /> 4 SIMPLEX AUTOMATIC FUEL PORT DETAIL PIPING PER SPEICIFICATIONS.NLEADER OVERFLOW <br /> P4.01 N.T.S. <br /> 5 FLUE & C.A. ROOF TERMINATION DETAIL <br /> P4.0, N.T.S. DETAILS <br /> (TYPICAL FOR SINGLE GAS WATER HEATER) <br /> s ROOF DRAIN PIPING SCHEMATIC <br /> P4.01 N.T.S. <br /> GMP SET <br /> A B <br /> D C ® DATE t2l <br /> ECT NUMBER <br /> 0 09.20.2022 1E <br /> NUMBER <br /> KEY PLAN Q <br /> City of Everett Permit Services P417 <br /> EVERETT Reviewed for Permit 04/15/2025 0 8 16 32 64 <br />