Laserfiche WebLink
H <br /> A-MAXITROL NATURAL GAS <br /> REGULATOR WITH MIN.CAPACITY 0 R 1108 po <br /> &rr <br /> 80 MBH.SET T010"W.C. �oxeU <br /> r 3/4"G M-3:SAGE PRIME SIP SERIES GAS <br /> SUBMETER(120V11PHASE),WITH PULSE <br /> OUTPUT CAPABILITY.TO BE CONNECTED <br /> MAKEUP AIR UNIT 7 TO THE BUILDING ENERGY METER SYSTEM, <br /> 80 MBH C G COORDINATE CONNECTION TO ENERGY <br /> SYSTEM WITH ELECTRICAL. <br /> ROOF <br /> 1"MPG 38 NORTHWEST 7209 SUITE 300 <br /> AXITROL VENTLESS NATURAL GAS PORTLA710 OR 97209 <br /> REGULATOR WITH MIN.CAPACITY OF 503.245.100 <br /> 399 MBH.SET TO 10"W.C.(TYP 2) 1505 5TH AVE,SUITE 300 <br /> a FOURTH FLOOR SEATTLE,WA 98101 <br /> 1"MPG SAN HOWARD <br /> ANCIS STREET <br /> 1"MPG SAN F2.7063 CO,CA 94103 <br /> 1-1/4"MPG 415.252.7063 <br /> ©ANKROM MOISAN ARCHITECTS,INC. <br /> C1A,1_I7c}K7) SIDER+BYERS ASSOCIATES,INC. <br /> M-2:SAGE PRIME SIP SERIES GAS MECHANICAL AND I �\ <br /> 1-1/4"G ELECTRICAL <br /> SUBMETER(120V/l PHASE),WITH PULSE 192 NICKERSON,SUITE 300 <br /> n399MBH <br /> OUTPUT CAPABILITY.TO BE CONNECTED SEATTLE,WA 98109 <br /> 399 MBH TO THE BUILDING ENERGY METER SYSTEM, 206.285.2988 <br /> COORDINATE CONNECTION TO ENERGY <br /> SYSTEM WITH ELECTRICAL. <br /> THIRD FLOOR CeHei <br /> T1"G �1-1/4"G 1"MPG 1-1/4"MPG 'J�C <br /> G G-IOID410�M �UI�v1v�P PGA EARTHQUAKE VALVE lth <br /> 2PSI GAS METER SIZED <br /> 1"G co FOR 1118 MBH LOAD. <br /> COORDINATION INSTALLATION <br /> DUAL OVEN RANGE WITH PSE. L(jT <br /> U <br /> S <br /> 120 MBH 120 MBH <br /> U development partners <br /> SECOND FLOOR <br /> M-1:SAGE PRIME SIP SERIES GAS <br /> AXITROL VENTLESS NATURAL GAS SUBMETER(1 20V/1 PHASE),WITH PULSE <br /> REGULATOR WITH MIN.CAPACITY OF OUTPUT CAPABILITY.TO BE CONNECTED <br /> 240 MBH.SET TO 10"W.C. TO THE BUILDING ENERGY METER SYSTEM, <br /> COORDINATE CONNECTION TO ENERGY <br /> SYSTEM WITH ELECTRICAL. <br /> FIRST FLOOR <br /> 1 GAS RISER <br /> Oil, N.T.S. <br /> W <br /> U) <br /> 00 <br /> = o <br /> N <br /> a <br /> Y � <br /> O <br /> LU <br /> J w <br /> CoLU <br /> w <br /> � w = <br /> Q � H <br /> Q J <br /> w_ <br /> 0 Q <br /> QO fn <br /> 0-1 < <br /> O ED a- <br /> N 0 <br /> W Ch OU <br /> REVISION DATE REASON FOR ISSUE <br /> 2 09.20.22 GMP ADDENDUM <br /> SDCI APPROVAL STAMP <br /> DETAILS <br /> GMP SET <br /> A B <br /> \7\07 <br /> D C ® DATE PROJECT NUMBER <br /> 0 09.20.2022 21016 <br /> �^ SHEET NUMBER <br /> KEY PLAN <br /> L City of Everett Permit Services P4.06 <br /> EVERETT Reviewed for Permit 04/15/2025 0 8 16 32 64 <br />