1f� �11111 l EX PILE I /;05 / / i I ( L E G E N D
<br /> ��III�II ABANDON-IN-PLACE /
<br /> EX STHLCaA1) 1 DEMO EX ASPHALT
<br /> b i DEMO EX CONCRETE
<br /> DEMO EX CLF&VIED SAWCUT LINE
<br /> ALONG SHORELINE, . } ����� ���:� �
<br /> SEE NOTE 8
<br /> : / XX LOCATION & DIRECTION OF PHOTO. SEE
<br /> I I I RELOC EX CONC BLOCKS TO NEW LOCATION / \ / SHEETS D3.1 TO D3.3
<br /> \1 \\\\I \ ALONG SHORELINE. MOVE EXCESS BLOCKS / l
<br /> f111 111 I� 1 TO BLOCK STORAGE AREA NEAR WHARF /
<br /> EX ROCKERY, PIP K E Y N O T E S
<br /> _2 0 DECOMMISSION EXISTING MONITORING WELL
<br /> 0 DECOMMISSION&
<br /> �
<br /> _ ABANDON-IN-PLACE�� cnI I �-- �_2 - EX 10"W,SEE NOTE 2
<br /> � V � DEMO EX 6'"W TO PH
<br /> CUT EX ,Q"SD I
<br /> OHW L
<br /> ( ,4--- &PLUG w/GONG DEMO EX PH DEMOLITION NOTES
<br /> EX IN E E
<br /> 6 CONC BURIED (OUT of SERVICE),
<br /> ' SEE NOTE 1 1. CONTRACTOR SHALL COMPLETELY REMOVE EXISTING FIRE
<br /> HYDRANT AND GATE VALVE. REMAINING PIPE MAY BE
<br /> G COMPLETELY REMOVED OR CUT AND CAPPED PER DETAIL 3,
<br /> SHEET D1.3 FOR ABANDONMENT-IN-PLACE.
<br /> / J CUT Ex w PIPE AT 2. THE EXISTING UTILITY LOCATIONS AND DEPTHS SHOWN ON
<br /> D1.1 D1.3TEE AND PLUG PIPE THESE PLANS ARE APPROXIMATE. NO REPRESENTATION IS
<br /> \ I END WITH GROUT MADE AS TO THE ACCURACY OR COMPLETENESS OF THE
<br /> INFORMATION. THE CONTRACTOR SHALL POTHOLE OR
<br /> OTHERWISE CONFIRM EXISTING CONDITIONS PRIOR TO START
<br /> 3 1N u // OF WORK. IF CONDITIONS DIFFER FROM THOSE SHOWN ON
<br /> THE PLANS, THE CONTRACTOR SHALL NOTIFY THE ENGINEER
<br /> DEMO 346LF Ex CLF ALONG ABANDON-IN-PLACE EX AND SHALL NOT BEGIN CONSTRUCTION UNTIL THE CHANGED
<br /> SOUTHERN PROPERTY LINE / 14-'
<br /> RELOC Ex BERM ro NEW v 10"SD&OUTFACE I� CONDITIONS HAVE BEEN EVALUATED. THE CONTRACTOR SHALL
<br /> &SHORELINE,SEE NOTE 8 LOCATION ALONG SHORELINE TAKE PRECAUTIONARY MEASURES TO PROTECT FROM DAMAGE
<br /> /- 2 DEMOLITION DETAIL OR DESTRUCTION ALL UTILITIES AS SHOWN AND ALL UTILITIES
<br /> l NOT SHOWN THAT MAY BE ENCOUNTERED DURING
<br /> D1.1 D1.4 SCALE: 1"=10' CONSTRUCTION DUE TO NO RECORD OF THEIR EXISTENCE.
<br /> a DEMO EX ASPH AND CONC PVMT CUT EX 10"S /
<br /> I &PLUG w/corlc � 3. UTILITIES, STRUCTURES AND SITE FEATURES NOT INDICATED
<br /> DECOMMISSION& FOR DEMOLITION SHALL BE PROTECTED-IN-PLACE.
<br /> / EX WATER _ ABANDON-IN-PLACE
<br /> DEMO Ex ACP To ' STRUCTURE, PIP 1 1 \X 10"W 4. ALL ITEMS MARKED FOR DEMOLITION (DEMO) SHALL BE SALVAGE LUMINAIRE3DEMO / PROPERTY LINE I DEMOLISHED AND REMOVED FROM THE SITE AND DISPOSED
<br /> EX LP&GONG BASE 14 IEX FIE, PIP /
<br /> SEE NOTE 7 C kOUT OF SERVICE) 1 \ OF AT AN APPROVED UPLAND DISPOSAL SITE IN ACCORDANCE
<br /> I WITH THE SPECIFICATIONS. ANY FEES REQUIRED FOR
<br /> 14- DEMO EX ELECTRICAL EQUIPMENT \ I a DISPOSAL ARE THE RESPONSIBILITY OF THE CONTRACTOR.
<br /> t J \ / / / z 5. CONTRACTOR SHALL COORDINATE WITH CITY TO SHUT-OFF
<br /> Ex OVERHEAD PTO BE RELOCATED
<br /> POLE I J� 1, WATER SERVICE AS NEEDED TO CONSTRUCT WATERMAIN
<br /> CUT EX 10 W PIPE AND
<br /> AND GUY WIRE To BE RELOCATED DEMO EX 10"SO AS PLUG PIPE�NDS WITH GROUT EXTENSION AND TO DECOMMISSION AND ABANDON EXISTING
<br /> /BY PUD PRIOR To CONTRACT, Nlc NEEDED FOR NEW D1.1 D1.3 WATER SERVICES AS NOTED ON THE DRAWINGS.
<br /> OUTFACE CONSTRUCTION-y/�' /
<br /> -18- 78�
<br /> 6. CONTRACTOR SHALL DEMOLISH EXISTING HAUL ROAD WHEN
<br /> - - Ex M, DEMO Ex BOLLARD I Ex PIPE ABOVE NO LONGER NEEDED. HAUL ROAD MATERIAL SHALL BE
<br /> PIP 1 &GUARD RAIL,TYP 04 - GRADE, PIP BLENDED WITH OTHER SITE SOILS AS PART OF SITE GRADING.
<br /> I �o DEMO EX HAUL ROAD, / - �' 7. CONTRACTOR SHALL USE CARE TO REMOVE AND NOT DAMAGE
<br /> wJ SEE DEMOLITION NOTE 6 ✓ - - �� ° \ 19_ /�� �_ ITEMS MARKED FOR SALVAGE. CONTRACTOR SHALL RETURN
<br /> - -J OR TY)LIN SALVAGED ITEMS TO THE PORT AT COVERED LOADING DOCKS
<br /> f -'T-E mod` � ��- 1 AND 2 ALONG WEST SIDE OF EXISTING WAREHOUSE.
<br /> 1 - - DECOMMISSION& CUT EX 10"W PIPE AND CAP O x-x-x-
<br /> ABANDON-IN-PLACE EX EX CLF,
<br /> EAST END WITH RESTRAINT
<br /> Ex SD MH �� 10 W,SEE NOTE 2 JOINT END CAP, _PIP i� �� 8. DEMOLITION OF EXISTING CHAINLINK FENCE SHALL INCLUDE
<br /> PIP TYR - D1.1 D1.3SEE NOTE 2 AND 5_21- DEMOLITION OF EXISTING POSTS, CONCRETE FOUNDATIONS,
<br /> RELOC EX CONC BLOCKS TO BLOCK q
<br /> / r op I BARBED WIRE, AND FASTENERS.Sr RAGE AREA NEAR WHARF
<br /> CUT EX W PIPE AT TEE AND
<br /> f
<br /> D1.1 D1.3 PLUG PIPE END WITH GROUT BNSF RAILROAD R.O.W.
<br /> ,� ,,� �.,,,,,, ,,, m,,,,,,i� ��„F✓ ,w r/ .W,;.:>Tr,a,,,,,,,,,,✓1 �}'S5'�6✓f-.SS ff
<br /> x EX OADING
<br /> DO�LK, TYP
<br /> - DEMO'EX PH& CALL 48 HOURS
<br /> \ / BOLLARDS TYP, DEMO EX 6""W TO FH BEFORE YOU DIG
<br /> EX GONG I SEE NOTE 1 DIAL 811
<br /> VERT DATUM: NAVD 88
<br /> CONV TO MLLW = NAVD88+2.03
<br /> EV TT City of Everett
<br /> Reviewed for Permit 1 012 6/2 0 2 1 n1.1 D1 D1 DEMOLITION DETAIL DEMOLITION DETAIL HORZ DATUM: NAD 83/91
<br /> D .4 SCALE: 1"=20' D1.1 .4 SCALE: 1"=10' IF SHEET IS LESS THAN 22x34 W
<br /> REDUCE SCALE ACCORDINGLY >
<br /> PROJECT ENGINEER: SCALE: PORT O F EV E RETT W
<br /> DWG. N0. D 1 4 �
<br /> 4A�p4'dsa�9A N. WATSON AS SHOWN �
<br /> 5�16 , NpoJO DESIGNED BY: DATE:
<br /> Port of eg _ >� J. BECKER 06/21/2021 NORTON TERMINAL DEVELOPMENT GIP NO. H
<br /> T)^ 7�M & MTCA 3RD INTERIM ACTION 1-8-900-05 V
<br /> EVERETT DRAWN BY CHECKED S
<br /> L L 16015th Avenue,Suite 1300 a�roia a K. EDWARDS, D. YU N. WATSON PROJECT
<br /> P.Q. BOX 538 Seattle,Washington 98101 �� e�«� DEMOLITION DETAILS NO. MT-NT-2o21-02.2
<br /> EVERETT, WA 98206 ® O6/21/2021 NW NEW SHEET97oNaL 1;4 b~ APPROVED BY: O
<br /> (425) 259-3164 (206)382-06 Fax(206)382-0500 (� 0 rC 4) SHEET NO. 1 4 OF 1 49 LL
<br /> PROJECT 1 NO. 600120 N0. DATE BY REVISION N0. DATE BY REVISION
<br />
|