Laserfiche WebLink
CITY OF EVERETT STANDARD TESL NOTES (VOL. 1 , 2-5) <br /> 1. APPROVAL OF THIS EROSION/SEDIMENTATION CONTROL (ESC) PLAN DOES NOT CONSTITUTE AN APPROVAL OF PERMANENT ROAD <br /> OR DRAINAGE DESIGN (E.G. SIZE AND LOCATION OF ROADS, PIPES, RESTRICTORS, CHANNELS, RETENTION FACILITIES, UTILITIES). <br /> 2. THE IMPLEMENTATION OF THESE ESC PLANS AND THE CONSTRUCTION, MAINTENANCE, REPLACEMENT, AND UPGRADING OF THESE <br /> ESC FACILITIES IS THE RESPONSIBILITY OF THE APPLICANT/CONTRACTOR UNTIL ALL CONSTRUCTION IS COMPLETED AND APPROVED <br /> AND PERMANENT STABILIZATION MEASURES ARE ESTABLISHED. <br /> 3. THE BOUNDARIES OF THE CLEARING LIMITS SHOWN ON THIS PLAN SHALL BE CLEARLY FLAGGED IN THE FIELD PRIOR TO <br /> CONSTRUCTION. DURING THE CONSTRUCTION PERIOD, NO DISTURBANCE BEYOND THE FLAGGED CLEARING LIMITS SHALL BE <br /> PERMITTED. THE FLAGGING SHALL BE MAINTAINED BY THE APPLICANT/CONTRACTOR FOR THE DURATION OF CONSTRUCTION. <br /> 4. THE ESC FACILITIES SHOWN ON THIS PLAN MUST BE CONSTRUCTED IN CONJUNCTION WITH ALL CLEARING AND GRADING <br /> ACTIVITIES, AND IN SUCH A MANNER AS TO ENSURE THAT SEDIMENT AND SEDIMENT LADEN WATER DO NOT ENTER THE DRAINAGE <br /> SYSTEM, ROADWAYS, OR VIOLATE APPLICABLE WATER QUALITY STANDARDS. <br /> 5. THE ESC FACILITIES SHOWN ON THIS PLAN ARE THE MINIMUM REQUIREMENTS FOR ANTICIPATED SITE CONDITIONS. DURING THE <br /> CONSTRUCTION PERIOD, THESE ESC FACILITIES SHALL BE UPGRADED AS NEEDED FOR UNEXPECTED STORM EVENTS AND TO <br /> ENSURE THAT SEDIMENT AND SEDIMENT—LADEN WATER DO NO LEAVE THE SITE. <br /> 6. THE ESC FACILITIES SHALL BE INSPECTED ROUTINELY AND MAINTAINED BY THE APPLICANT/CONTRACTOR TO ENSURE THEIR <br /> CONTINUED FUNCTIONING, ESPECIALLY AFTER STORM EVENTS. <br /> 7. THE ESC FACILITIES ON INACTIVE SITES SHALL BE INSPECTED AND MAINTAINED A MINIMUM OF ONCE A MONTH OR WITHIN THE 48 <br /> HOURS FOLLOWING A MAJOR STORM EVENT. <br /> 8. AT NO TIME SHALL MORE THAN ONE FOOT OF SEDIMENT BE ALLOWED TO ACCUMULATE WITHIN A TRAPPED CATCH BASIN. ALL <br /> CATCH BASINS AND CONVEYANCE LINES SHALL BE CLEANED PRIOR TO PAVING. THE CLEANING OPERATION SHALL NOT FLUSH <br /> SEDIMENT LADEN WATER INTO THE DOWNSTREAM SYSTEM. <br /> 9. STABILIZED CONSTRUCTION ENTRANCES SHALL BE INSTALLED AT THE BEGINNING OF CONSTRUCTION AND MAINTAINED FOR THE <br /> DURATION OF THE PROJECT. ADDITIONAL MEASURES MAY BE REQUIRED TO ENSURE THAT ALL PAVED AREAS ARE KEPT CLEAN FOR <br /> THE DURATION OF THE PROJECT. <br /> 10. THE CONTRACTOR SHALL PROVIDE PERIODIC STREET CLEANING TO REMOVE DEBRIS AND SEDIMENT TRACKED OFF THE SITE. <br /> 11. APPROPRIATE MEASURES SHALL BE TAKEN TO STOP SEDIMENT FROM ENTERING SURFACE WATER BODIES IF PROPOSED BMPs FAIL. <br /> PLASTIC SHEETING(MIN 20 MIL THICKNESS) 12. BARE AND/OR DISTURBED SOILS SHALL REMAIN UNCOVERED AND/OR UNSTABILIZED FOR NO MORE THAN 2 DAYS FROM <br /> ABOVE AND BELOW STOCKPILE OCTOBER 1 THROUGH APRIL 30, AND FOR NO MORE THAN 7 DAYS FROM MAY 1 THROUGH SEPTEMBER 30. <br /> ECOLOGY BLOCK <br /> ECOLOGY BLOCK SAND BAGS NOTES <br /> SAND BAGS P R 1. STOCKPILED MATERIALS SHALL BE COVERED AND SECURED FROM WIND, <br /> STOCKPILED' RAIN, AND OTHER DISTURBANCES AT ALL TIMES EXCEPT DURING ACTIVE <br /> T RA S LOADING AND UNLOADING. <br /> 2 PUUMPIINGTOR TTO AHALL CONTANMOVE WATER ENT VESSELWFORN THE ANALYSISOTOPILE AREAS B DETERMINE ITS <br /> T 'Xi`T`/yT`i PROPER DISPOSAL. CONTRACTOR SHALL BE RESPONSIBLE FOR DISPOSAL <br /> ����i�i�i�`�i�?`liy��!1����l�i`iT�l�?`✓�TN���/�i�i i�l?�1i����;����a��T.`�i��i�%�i����� OF COLLECTED WATER IN THE STOCKPILE AREA. <br /> 3. CONTRACTOR IS RESPONSIBLE FOR SOIL AND STOCKPILE MANAGEMENT, <br /> INCLUDING SIZE, LOCATION AND NUMBER OF STOCKPILES. SEE <br /> SPECIFICATIONS FOR FURTHER REQUIREMENTS. <br /> 4. IF MULTIPLE SHEETS OF PLASTIC SHEETING ARE USED ABOVE OR BELOW <br /> THE STOCKPILES, THEY MUST OVERLAP BY 3' MINIMUM. <br /> 5. BARRIER REQUIRED AT TOE OF STOCKPILES. <br /> 6. SECURE COVERING TIGHTLY IN PLACE BY USING SANDBAGS OR TIRES ON <br /> 1 STOCKPILE COVER ROPES WITH MAXIMUM 10' GRID SPACING IN ALL DIRECTIONS. <br /> C1.1 C1.4 SCALE: NTS 7. STOCKPILES MUST BE LOCATED MORE THAN 75' FROM SHORELINE AND <br /> AWAY FROM STORM DRAIN CATCH BASINS. <br /> 8. GROUND SURFACES UNDER CONTAMINATED MATERIAL STOCKPILES SHALL CALL48HOURS <br /> BE FREE OF OBJECTS THAT WILL DAMAGE SHEETING, OR A LAYER OF <br /> GEOTEXTILE OR PLYWOOD SHALL BE PLACED BELOW. BEFORE YOU DIG <br /> DIAL 811 <br /> VERT DATUM: NAVD 88 <br /> CONV TO MLLW = NAVD88+2.03 <br /> HORZ DATUM: HAD 83/91 <br /> IF SHEET IS LESS THAN 22x34 W <br /> REDUCE SCALE ACCORDINGLY > <br /> PROJECT W ENGINEER: SCALE: PORT O F EVERETTJ W <br /> DWG. NO. C1 4 <br /> 4A�p4'dsa�9A N. WATSON AS SHOWN V � <br /> 5�16 , A°oJ, DESIGNED BY: DATE: >_ <br /> Port of eg _ >� J. BECKER 06/21/2021 NORTON TERMINAL DEVELOPMENT CIP No. H <br /> T) 7�M & MTCA 3RD INTERIM ACTION 1-8-900-05 V <br /> EVERETT <br /> T� DRAWN BY CHECKED S <br /> L 16015th Avenue,Suite 1300 a�roia a K. EDWARDS, D. YU N. WATSON PROJECT <br /> P.O. Box 538 Seattle,Washington98101 �O e�rsre<�O : TESC STOCKPILE NO. MT—NT-2021-02.2 <br /> EVERETT, WA 98206 (206)382-0600 Fax(206)382-0500 ® 06/29/2021 NW NEW SHEETstoxat � b�' APPROVED BY: O <br /> (425) 259-3164 PROJECT NO.1600120 NO. DATE BY REVISION NO. DATE BY REVISION COVER DETAILS SHEET NO. 22 OF 149 LL <br />