My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2600 FEDERAL AVE 2021 Plans 2025-09-29 (2)
>
Address Records
>
FEDERAL AVE
>
2600
>
Plans
>
2600 FEDERAL AVE 2021 Plans 2025-09-29 (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/29/2025 11:10:00 AM
Creation date
9/29/2025 11:03:21 AM
Metadata
Fields
Template:
Address Document
Street Name
FEDERAL AVE
Street Number
2600
Permit
PW2105-051
Year
2021
Notes
SITE WORK FOR FEDERAL AVE IMPROVEMENTS RELATED TO NORTON TER
Address Document Type
Plans
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
150
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
NOTES <br /> 1 FF <br /> 1. CONTRACTOR SHALL DRILL HIGH-MAST LIGHT POLE FOUNDATIONS PRIOR TO <br /> INSTALLATION OF ALL OTHER UTILITIES AND FIRE HYDRANTS.THE LOCATION <br /> OF LIGHT POLE FOUNDATIONS MAY REQUIRE HORIZONTAL ADJUSTMENT IF <br /> CB TYPE 2 OLDCASTLE PRECAST BUMPER CURB, BELOW GRADE OBSTRUCTIONS ARE ENCOUNTERED.IF OBSTRUCTIONS ARE <br /> 290 LB OR APPROVED EQUAL ENCOUNTERED CONTRACTOR SHALL NOTIFY ENGINEER TO AGREE ON NEW <br /> LOCATION WHICH MAY AFFECT THE LOCATION OF OTHER UTILITIES. <br /> N:363227.86 <br /> E 1301537.59 o �, o LEGENDN:363149.91E: 1301534.96 <br /> SSFM CO VAULT 9"ASPH PVMT OVER 12"CSBC <br /> SSFM SHUT-OFF VAULT� 6SSFM LIFT STATION I c�VALVE VAULT 1O'x46' LONGSHOREMAN TRAILER LAN VIEW TEMPORARY 2"ASPH PVMT OVER 12"CSBC THAT WILL <br /> (FOR RESTROOM/SHOWER) BE PAVED TO THE FULL 9"DEPTH PVMT IN THE FUTURE <br /> 1 SEWER LIFT STATION FOR CL <br /> ASPH TRANSITION RAMP AT 5% MAX C5.9 C5.22 LONGSHOREMAN TRAILERS <br /> SLOPE ALONG EAST,WEST&SOUTH <br /> SIDE OF FULL DEPTH PVMT DRAINAGE SLOT <br /> ACCESIBLE STALL STRIPING PER SS CO 10" DEMO EX FIT <br /> WSDOT STD PLAN M-17.10-02 SLOTS FOR BOLT AND RISER <br /> ADA RAMP TO <br /> LONGSHOREMAN TRAILERS CONNECTION,TYP <br /> ACCESS PARKING SPACE SYMBOL <br /> PER COE STD DWG 714 <br /> II II <br /> _ II II <br /> Tn � <br /> POTENTIAL FUTURE <br /> LEASEHOLD LINE ELEVATION VIEW 9"MIN DEPTH,36"'x3 or REINFORCED CONC PAD <br /> I <br /> 1 PRECAST CURB BUMPER DETAIL PROVIDE(4)#3 BARS <br /> 4 PARKING STALLS <br /> SCALE: NTS <br /> 5%MAX TRANSITION SLOPE (1 ADA&3 - - <br /> FROM 9"DEPTH PVMT TO 2"' STANDARD STALLS) <br /> DEPTH PVMT,TYP CONC WHEEL STOP,TYP 4 <br /> a <br /> (SEE DETAIL 1 THIS SHEET) <br /> I <br /> HIGH-MAST LIGHT POLE AND CONC <br /> UTILITY COLLAR,SEE SHELF S1.1 9"MIN DEPTH,36"x36" PROVIDE(4) #3 BARS, SECTION A <br /> LLLLLL 25 9' 6 10 5' 12' b AND NOTE 1 THIS SHEET REINFORCED CONC PAD SEE SECTION A <br /> TYP <br /> WATER METER�_ I =4� 4' <br /> INSTALL 6"SCH 40 <br /> STEEL PIPE GUARD POST <br /> PER COE STD DWG 508 <br /> 8"DIA BOLLARD� 3 <br /> V ed < <br /> de <br /> HOT BOX J _ _ <br /> LP10 <br /> e e ` <br /> 10'x30' LONGSHOREMAN TRAILER <br /> FOR BREAKROOM/OFFICE) <br /> .!. A N <br /> N: 363146.33 N:363224.29 <br /> E: 1301640.89 I E: 1301643.53 <br /> I <br /> 2"GS RISER PIPE ADJACENT TO LIGHT ACP <br /> 78 POLE FOUNDATION, PRIME AND PAINT / <br /> WITH TWO COATS OF"SAFETY YELLOW"J INSTALL CONC PAD <br /> PER COE STD DWG 508 CALL 48 HOURS <br /> M06 <br /> AIR-VAC VALVE ASS'Y INSTALL FIRE HYDRANT BEFORE YOU DIG <br /> PER COE STD PLAN 112 PER COE STD DWG 507 DIAL 811 <br /> SEE NOTE 1 <br /> 1"AIR VENT PIPE <br /> FROM WATER MAIN <br /> INNI z VERT DATUM: NAVD 88 <br /> 10' 0 10' 20' HIGH MAST LIGHT POLE AND CONV TO MLLW = NAVD88+2.03 <br /> HORZ DATUM: NAD 83/91 <br /> 1 LONGSHOREMAN TRAILER DETAIL PLAN 5' 15' 2 FIRE HYDRANT ASS Y DETAILS <br /> C2.1 C2.3 SCALE: 1" = 10' SCALE: FITS IF SHEET IS LESS THAN 22x34 W <br /> REDUCE SCALE ACCORDINGLY <br /> PROJECT ENGINEER: SCALE: PORT OF EVERETT <br /> N � DWG. NO. C2.4 � <br /> p, LU <br /> N. WATSON AS SHOWN <br /> �P of r,LrB2'�A <br /> �S 1b Np J� DESIGNED BY: DATE: <br /> Port Of e�g�~ _' rtoy J. BECKER 05/07/2021 NORTON TERMINAL DEVELOPMENT CIP No. H <br /> EVERETT1Tff 8-900-05 <br /> DRAWN BY: CHECKED BY: & MTCA 3RD INTERIM ACTION U <br /> 16015th Avenue,Suite 1300 10 06/21/2021 NW ADDED DETAILS 37oia K. EDWARDS, D. YU N. WATSON PROJECT <br /> P.O. B0X 538 Seattle,Washington 98101 8�isteagO SITE PLAN DETAILS <br /> N0. MT-NT-2021-02.2 <br /> EVERETT, WA 98206 A 05/07/2021 NW FOR CITY REVIEW70M1L 8t�5 ti APPROVED BY: <br /> (425) 25s-3164 (206)CT NO.1 Pax(206)382-0500 /2 O C 2\ 0 <br /> PROJECT NO.1600120 No. DATE BY REVISION No. DATE BY REVISION l f J SHEET N0. 26 OF 149 LL <br />
The URL can be used to link to this page
Your browser does not support the video tag.