Laserfiche WebLink
Notes: <br /> 1.) Mount OU-1 on 3001_b wall bracket. <br /> Heat Pumps 2.) Run refrigeration lines, condensate lines and electrical in line hide. Coordinate with City's electrician so they can <br /> —TagMake Model CoolingCap. Heatingw get their cable installed within line hide cover.Cap. CFM Voltage Phase Max fuse s HSPF _ ge Mechanical permit needed. <br /> OU-1 Mitsubishi PUZ-HA36NHA5 36000btu 40000btu NA 208 1 30A 16.8/12.5 <br /> iu-1 Mitsubishi PEAD-A36AA7 1200 208 1 NA 5.) City will provide high voltage wiring and permit for this project. <br /> 6.) Decommission and existing unit heater. Shut off power and gas supply. <br /> 7.) Copper lines between IDU-1 and ODU-1 are 3/8" and 5/8". <br /> 8.) Condensate line out of unit is 1 '/4", reduce to 3/4"" and terminate at outside wall with refrigeration pipes. <br /> 00 o 00 o <br /> X m x m <br /> 0 <br /> Gas unit heater to be <br /> O decommissioned. <br /> h° "MIFF <br /> , <br /> l y, <br /> 2.1 <br /> c 4 <br /> T'. <br /> Street View Of Outdoor Unit and Piping <br /> City of Everett Service Center #4 Heat Pump Add <br /> 3200 Cedar Steet, Everett WA 98201 SIZE K-2 REV <br /> D.K. Systems, Inc. <br /> DRAWN DARRON PO Box 886 <br /> Burlinciton, WA 98233 <br /> ISSUED Friday, December 29, 2023 SCALE 3/16" = 1'-0" Floor Plan SHEET 2 OF 2 <br />