My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
17 E MARINE VIEW DR 2019 Plans 2025-09-29 (4)
>
Address Records
>
E MARINE VIEW DR
>
17
>
Plans
>
17 E MARINE VIEW DR 2019 Plans 2025-09-29 (4)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/29/2025 2:05:41 PM
Creation date
9/29/2025 1:39:18 PM
Metadata
Fields
Template:
Address Document
Street Name
E MARINE VIEW DR
Street Number
17
Permit
B1904-034
B1904-035
Year
2019
Notes
SOIL REMEDIATION RECYCLING FACILITY BY CADMAN
Address Document Type
Plans
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
43
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Bracing Part Schedule <br /> Part Qty Length Detail <br /> 12RU3703 2 37'-3" BR02K1 <br /> 12RU3711 2 37'-11" BR02K1 <br /> 1 2 3 4 5 6 7 8 9 <br /> -0 <br /> 0 <br /> 0> <br /> ! Open <br /> rn <br /> N <br /> /titi titi <br /> �] 25'-011—��--26'-0" 27'-0" 28'-0" 27'-0" 27'-0" 27'-0" 26'-0" <br /> CL CL CL CL CL CL CL CL CL <br /> 215'-0" <br /> BL BL <br /> SECONDARY ELEVATION AT B <br /> K A <br /> 56 92 <br /> �SS�ONAI� ' <br /> 1 04/08/201 <br /> Dimension Key <br /> Shape Name=Cadman 1 Wall=4 PERMIT SET-For Building Dept.Approval <br /> 1.UNLESS NOTED,USE 1/2 X 1 1/2 A325T BOLT(49080)AND NUT(47120) THE VP ENGINEER'S SEAL APPLIES ONLY THIS DRAWING,INCLUDING THE INFORMATION HEREON,REMAINS THE PROPERTY OF VP Buildings <br /> TO THE WORK PRODUCT OF VP AND VP BUILDINGS. IT IS PROVIDED SOLELY FOR ERECTING THE BUILDING DESCRIBED Players Club Circle Memphis TN 38125 SECONDARY ELEVATION AT B 3200 Pla <br /> W/O WASHERS.SNUG TIGHTEN BOLTS FOR ALL SECONDARY CONNECTIONS. DESIGN AND PERFORMANCE IN THE APPLICABLE PURCHASE ORDER AND MAY BE REPRODUCED ONLY FOR THAT y <br /> 2.FLANGE BRACES ARE AN INTEGRAL PARTOF THE STABILITY OF THE REQUIREMENTS SPECIFIED BY VP. THE PURPOSE. IT SHALL NOT BE MODIFIED,REPRODUCED OR USED FOR ANY OTHER <br /> STRUCTURAL SYSTEM AND MUST BE PROPERLY INSTALLED PRIOR TO ERECTION VP ENGINEER'S SEAL DOES NOT APPLY PURPOSE WITHOUT PRIOR WRITTEN APPROVAL OF VP BUILDINGS- REv DATE BY DESCRIPTION BUILDER CHG Building Systems,Inc. doe a <br /> 18-040734 <br /> OF WALL AND ROOF SHEETS. TO THE PERFORMANCE OR DESIGN OF THE GENERAL CONTRACTOR AND/OR ERECTOR IS SOLELY RESPONSIBLE FOR ACCURATE CUSTOMERCadman DATE <br /> 3.REMOVAL OR ALTERATION OF ANY COMPONENT IS PROHIBITED. ANY OTHER PRODUCT OR COMPONENT GOOD QUALITY WORKMANSHIP IN ERECTING THIS BUILDING IN ACCORDANCE WITH THIS LOCATION Everett Washington VP BUILDINGS 4.5.2019 <br /> , <br /> FURNISHED BY VP EXCEPT TO ANY DRAWING,DETAILS REFERENCED IN THIS DRAWING,ALL APPLICABLE VP BUILDINGS a� DRAWNICHECK <br /> DESIGN OR PERFORMANCE ERECTION GUIDES,AND INDUSTRY STANDARDS PERTAINING TO PROPER ERECTION, PRaecT Cadman Everett Bldg 1 jac <br /> REQUIREMENTS SPECIFIED BY VP. INCLUDING THE CORRECT USE OF TEMPORARY BRACING. NITS IBUILDEITS PO# P8103 VPCVERSION: 2016.2b PAGE19 <br /> 4/4/2019 16:47:16 FILENAMe Cadman 1 ediftw of BIwSwpe BWdings NoM Amerlw,he <br />
The URL can be used to link to this page
Your browser does not support the video tag.