Laserfiche WebLink
Covering Schedule Trim Schedule <br /> Id Qty Length Type Gage OP Fin. Color Direction Id Parts Color Details <br /> #1 72 39'-5 1/2" PR 26 1 K TD Left to Right T1 BSI,FPRFI,GGCI,MCC1 Cool Dark Bronze RC38N1 <br /> #2 72 20'-4" PR 26 1 K TD Left to Right T2 PRC,SPC10 Cool Dark Bronze RC38C4 <br /> #3 72 3'-4" PR 26 3 K TD Left to Right T3 BSI,FPRFI,GGCI,MCC1 Cool Dark Bronze RC38N1 <br /> #4 72 39'-5 1/2" PR 26 1 K TD Left to Right <br /> #5 72 20'-4" PR 26 1 K TD Left to Right <br /> Oper. Code:l=SQ,SQ <br /> Oper. Code:3=SQ,SQ <br /> Finish:K=KXL (Kynar) <br /> Color:TD=Standard Color <br /> 1 2 3 4 5 6 7 8 9 <br /> a T3 <br /> w ------------------------------------------------------------- T3 <br /> I <br /> I <br /> I <br /> (72) #4 <br /> I <br /> I <br /> I <br /> I <br /> I <br /> (72) #5 <br /> 0 T2 T2 <br /> o (72)#3 <br /> N <br /> r-I I <br /> (72) #2 <br /> I <br /> I <br /> I <br /> I <br /> I <br /> I <br /> (72)#1 <br /> I <br /> I <br /> I <br /> T1 ------------------------------------------------------------- T1 <br /> 215'-0 rr <br /> BL BL <br /> ROOF COVERING PLAN <br /> Fastener Schedule O 5O 92ST <br /> Part Description �sS/ouA`[ <br /> Roof Struct 1 1/4 (T-2) #12-14 x 1 1/4", 5/16" Hex Hd, SS Cap w/Washer 1� 4 <br /> 0097584-105 (T-2) #12-14 x 1 1/4", 5/16" Hex Hd, SS Cap w/Washer �4��8�2�19 <br /> Roof Stitch 7/8 SS(T-1) 1/4-14 x 7/8", 5/16" Hex Hd, SS Cap w/Washer <br /> Shape Name=Cadman 1 PERMIT SET-For Building Dept.Approval <br /> 1.PRE-DRILLING 1/8 DIAMETER HOLES FOR STRUCTURAL FASTENERS THE VP ENGINEER'S SEAL APPLIES ONLY THIS DRAWING,INCLUDING THE INFORMATION HEREON,REMAINS THE PROPERTY OF VP Buildings <br /> TO THE WORK PRODUCT OF VP BUILDINGS. IT ISMAY BE REQUIRED FOR HEAVY GAGE NESTED ZEE's AND/OR FASTENERS DESIGN AND PER ORMANCEVP AND IN THE APPLICABLE PUROCHIASE ORDER A DED D MAY BE SOLELY FORERECTIR NG PROD CTHEIEDIONLYESCRIBED FOR THAT 3200 Players Club Circle Memphis TN 38125 ROOF COVERING PLAN <br /> TO STRUCTURAL BEAMS REQUIREMENTS SPECIFIED BY VP. THE PURPOSE. IT SHALL NOT BE MODIFIED,REPRODUCED OR USED FOR ANY OTHER <br /> BV DES <br /> 2.STEEL PANELS ARE AN INTEGRAL PART OF THE STRUCTURAL SYSTEM. VP ENGINEERS R'S SEAL DOES NOT APPLY PURPOSE WITHOUT PRIOR WRITTEN APPROVAL F VP BUILDINGS. REV DATE BUILDER JcB# <br /> CHG Building Systems,Inc. 18-040734 <br /> REMOVAL OR ALTERATION WITHOUT PRIOR AUTHORIZATION IS PROHIBITED. TO THE PERFORMANCE OR DESIGN OF THE GENERAL CONTRACTOR AND/OR ERECTOR IS SOLELY RESPONSIBLE FOR ACCURATE CUSTOMERCadman <br /> ANY OTHER PRODUCT OR COMPONENT GOOD QUALITY WORKMANSHIP IN ERECTING THIS BUILDING IN ACCORDANCE WITH THIS DA E <br /> 3.DUE TO MANUFACTURING LIMITATIONS SHORT PANELS MAY REQUIRE LOCATION Everett,Washington VP BUILDINGS 4.5.2019 <br /> FIELD CUTTING,SEE THE COVERING SCHEDULE FOR CUT LENGTHS. FURNISHED BY VP EXCEPT TO ANY DRAWING,DETAILS REFERENCED IN THIS DRAWING,ALL APPLICABLE VP BUILDINGS pBw� DRAWWCHECK <br /> DESIGN OR PERFORMANCE ERECTION GUIDES,AND INDUSTRY STANDARDS PERTAINING TO PROPER ERECTION, jPR011CT Cadman Everett Bldg 1 jac <br /> 4.SEE JOB DETAILS FOR COVERING AND TRIM FASTENER SPECIFICATION. REQUIREMENTS SPECIFIED BY VP. INCLUDING THE CORRECT USE OF TEMPORARY BRACING. BULDERS Poa PAGE <br /> NTS 28103 vPcvERSION: 2018.2b 21 <br /> 4/4/2019 16:47:18 FLENAME:Cadman I a dMslon cf BluaScope Bulldl qs Nchh Amedca,h <br />