My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
17 E MARINE VIEW DR 2019 Plans 2025-09-29 (4)
>
Address Records
>
E MARINE VIEW DR
>
17
>
Plans
>
17 E MARINE VIEW DR 2019 Plans 2025-09-29 (4)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/29/2025 2:05:41 PM
Creation date
9/29/2025 1:39:18 PM
Metadata
Fields
Template:
Address Document
Street Name
E MARINE VIEW DR
Street Number
17
Permit
B1904-034
B1904-035
Year
2019
Notes
SOIL REMEDIATION RECYCLING FACILITY BY CADMAN
Address Document Type
Plans
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
43
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Trim Schedule <br /> Id Parts Color Details <br /> T1 (10)EG201,EG161, (74)STR2, (22)5SF21, (22)GRA10 Cool Dark Bronze RC03B1,RC04B2,RC39A3,RC61B6, <br /> RCV047,RCV324 <br /> T2 5CE75, (3)CP510,DN1, (6)DST1 Standard Color RC38P1 <br /> 9 1 <br /> T1 <br /> o Open <br /> I <br /> rn <br /> N EH E E-E EH N <br /> E <br /> 215'-0" <br /> BL BL <br /> COVERING ELEVATION AT A <br /> K W ESS <br /> r <br /> 56 92 <br /> 04/08/2019 <br /> Shape Name=Cadman 1 Wall=2 PERMIT SET-For Building Dept.Approval <br /> 1.PRE-DRILLING 1/8 DIAMETER HOLES FOR STRUCTURAL FASTENERS THE VP ENGINEER'S SEAL APPLIES ONLY THIS DRAWING,INCLUDING THE INFORMATION HEREON,REMAINS THE PROPERTY OF VP Buildings <br /> TO THE WORK IT IS PROVIDED SOLELY FORBI <br /> MAY BE REQUIRED FOR HEAVY GAGE NESTED ZEE's AND/OR FASTENERS DESIGN AND PER ODRMANOCE VP AND INTHEIAPPLICABLE PURCHASE ORDER AN MAY BE ERECTTNG HE <br /> ONLYESCRIBED FOR THAT 3200 Players Club Circle Memphis TN 38125 COVERING ELEVATION AT A <br /> TO STRUCTURAL BEAMS REQUIREMENTS SPECIFIED BY VP. THE PURPOSE. IT SHALL NOT BE MODIFIED,REPRODUCED OR USED FOR ANY OTHER <br /> B D <br /> 2.STEEL PANELS ARE AN INTEGRAL PART OF THE STRUCTURAL SYSTEM. VP ENGINEER'S SEAL DOES NOT APPLY PURPOSE WITHOUT PRIOR WRITTEN APPROVAL F VP BUILDINGS. REV DATE Y E.C... BULDER JOB CHG Building Systems,Inc. 18-040734 <br /> REMOVAL OR ALTERATION WITHOUT PRIOR AUTHORIZATION IS PROHIBITED. TO THE PERFORMANCE OR DESIGN OF THE GENERAL CONTRACTOR ND/OR ERECTOR IS SOLELY RESPONSIBLE FOR ACCURATE CUSTOMERCadman <br /> ANY OTHER PRODUCT OR COMPONENT GOOD QUALITY WORKMANSHIP IN ERECTING THIS BUILDING IN ACCORDANCE WITH THIS Everett,Washington �gn <br /> 3.DUE TO MANUFACTURING LIMITATIONS SHORT PANELS MAY REQUIRE �ocnnoN 4.5.2019 <br /> FIELD CUTTING,SEE THE COVERING SCHEDULE FOR CUT LENGTHS. FURNISHED BY VP EXCEPT TO ANY DRAWING,DETAILS REFERENCED IN THIS DRAWING,ALL APPLICABLE VP BUILDINGS DRAVINCHECK <br /> DESIGN OR PERFORMANCE ERECTION GUIDES,AND INDUSTRY STANDARDS PERTAINING TO PROPER ERECTION, PROJECT Cadman Everett Bldg 1 jac <br /> 4.SEE JOB DETAILS FOR COVERING AND TRIM FASTENER SPECIFICATION. REQUIREMENTS SPECIFIED BY VP. INCLUDING THE CORRECT USE OF TEMPORARY BRACING. BULDERS Poa PAGE <br /> NITS28103 VPC VERSION: ZO18.2b 23 <br /> 4/4/2019 16:47:22 FLEn ME'Cadman 1-APD a dldsionofeweSmpe Wldinw NoMAm nd ,b, <br />
The URL can be used to link to this page
Your browser does not support the video tag.