Laserfiche WebLink
Covering Schedule Trim Schedule <br /> Id Qty Type Start Length Gage OP Fin. Color Increment Direction Id Parts Color Details <br /> #15 1 PR 9'-10 1/2" 26 T K TD Left to Right T1 (4.8)BA125,(12)BT10 Cool Dark Bronze EN52A1,ENVO03,RCOOAI,WCOIAB,WC04G1 <br /> #1 19 PR 9'-10 1/2" 26 T K TD -6" Left to Right T2 CT12 Match Wall Color WC20A1 <br /> #2 20 PR 9-10 1/2" 26 M K TD -6" Right to Left T3 (6)RKF20,RKFlO Cool Dark Bronze RC30B1,RS10R1 <br /> Oper. Code:T-RT,SQ T4 (7)GAC1040,(13)RCF10A Match Roof Color RC03B1,RC52B1,WC55A2 <br /> Oper. Code:M-LF,SQ <br /> Finish:K-KXL (Kynar) <br /> Color:TD-Standard Color <br /> I I <br /> T3-60-2 1/2" .. - T3-601_ <br /> tl15 <br /> (20)tl2 (19)tl1 <br /> i <br /> i <br /> I <br /> i <br /> Opening 1 Opening 3 <br /> I <br /> T1 <br /> T60'-0" 60'-0" <br /> 120-0" <br /> BL <br /> BL <br /> COVERING ELEVATION AT 7 <br /> Kw�fssf <br /> N <br /> 56 92 <br /> ISiEP� �' <br /> Fastener Schedule CIT OF EVERETT NAIE' <br /> Part Description REVIE ED FOR PERMIT 04/09/2019 <br /> Roof Struct 1 1/4 SS (T-2) #12-14 x 1 1/4", 5/16" Hex Htl, SS Cap w/Washer <br /> 0097584-105 (T-2) #12-14 x 1 1/4", 5/16" Hex Hd, SS Cap w/Washer <br /> Roof Stitch 7/8 S5 (T-1) 1/4-14 x 7/8", 5l16" Hex Hd, SS Cap w/Washer Shape Name Cadman z,Wall 3 p PERMIT SET-For BuildingDept.Approval <br /> roval <br /> = = <br /> 1.PRE-DRILLING 1/8 DIAMETER HOLES FOR STRUCTURAL FASTENERS THE VP ENGINEER'S SEAL APPLIES ONLY TO THE THIS DRAWING,INCLUDING THE INFORMATION HEREON,REMAINS THE PROPERTY OF VP BUILDINGS. D VP Buildings <br /> MAY BE REQUIRED FOR HEAVY GAGE NESTED 2EE's AND/OR FASTENERS WORK PRODUCT OF VP AND DESIGN AND IT IS PROVIDED SOLELY FOR ERECTING THE BUILDING DESCRIBED IN THE APPLICABLE PURCHASE COVERING ELEVATION AT 7 <br /> TO STRUCTURAL BEAMS PERFORMANCE REQUIREMENTS SPECIFIED BY ORDER AND MAY BE REPRODUCED ONLY FOR THAT PURPOSE.IT SHALL NOT BE MODIFIED, 3200 Players Club Circle Memphis TN 38125 <br /> VP.THE VP ENGINEER'S SEAL DOES NOT APPLY REPRODUCED OR USED FOR ANY OTHER PURPOSE WITHOUT PRIOR WRITTEN APPROVAL OF VP <br /> 2.STEEL PANELS ARE AN INTEGRAL PART OF THE STRUCTURAL SYSTEM. REv DATE By DEscwFnory <br /> TO THE PERFORMANCE OR DESIGN OF ANY BUILDINGS. BU1� CHG Buildin S terns,Inc. J ry <br /> REMOVAL OR ALTERATION WITHOUT PRIOR AUTHORIZATION IS PROHIBITED. OTHER PRODUCT OR COMPONENT FURNISHED THE GENERAL CONTRACTOR AND/OR ERECTOR IS SOLELY RESPONSIBLE FOR ACCURATE GOOD cusTOMER Cadman 18-040735-01 <br /> - 3.DUE TO MANUFACTURING LIMITATIONS SHORT PANELS MAY REQUIRE BY VP EXCEPT TO ANY DESIGN OR QUALITY WORKMANSHIP IN ERECTING THIS BUILDING IN ACCORDANCE WITH THIS DRAWING, <br /> FIELD CUTTING,SEE THE COVERING SCHEDULE FOR CUT LENGTHS. LocaTlory 04/08/2019 <br /> PERFORMANCE REQUIREMENTS SPECIFIED BY DETAILS REFERENCED IN THIS DRAWING,ALL APPLICABLE VP BUILDINGS ERECTION GUIDES,AND Everett,Washington VP BUILDINGS DRA—CHECK <br /> 4.SEE JOB DETAILS FOR COVERING AND TRIM FASTENER SPECIFICATION. VP. INDUSTRY STANDARDS PERTAINING TO PROPER ERECTION,INCLUDING THE CORRECT USE OF PROJECT vARco PRuoSnl <br /> Cadman Everett Bldg 2 LND <br /> 7777777tTEMPORARY BRACING. 0LDERS Pon A BlueScope Steel Company PAGE 28 <br /> NTS 28103 VPc VERSION: 2018.2b <br /> 4/5/2019 10:57:00 NLEry ME: Cadman .amwa"er awes�ne ewmin9+u.m,Am..,m" <br />