Laserfiche WebLink
2x4 Attic Ceiling Joists/Collar Ties <br /> (=2'OC per Existing Rafters) <br /> Existing Arch.Composition Roof <br /> over Plywood&Skip Sheeting <br /> 3.5"Sprayy Foam Insulation between existing Rafters(=R24) <br /> (Ignition/I hermal Barrier Coating applied when not covered by'/i'Drywall) <br /> 2'x4'Skylight between ExistingRafters <br /> (Details&Flashing not Show ,-;�'����)1� <br /> '/V Drywall <br /> Project Ro Dm <br /> Existing Knee Walls(see Sheet 5) <br /> Picture Rail <br /> ao <br /> M <br /> C7 <br /> N <br /> Lf7 <br /> Baseboard 3/8"Plywood <br /> Carpet with Pad Existing S iplap <br /> Existing Soffit Existing 2x8 Ceiling Joists at V-4"OC Existing Soffit <br /> PROJECT ROOM SECTION <br /> SCALE 3/8" = 1'-0" <br /> Daniel B Douglass <br /> 1401 Lombard Ave. <br /> Everett, WA 98201 <br /> 2"d Floor Plan 2 of 5 <br />