My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1725 HOYT AVE 2022 Plans 2025-09-30
>
Address Records
>
HOYT AVE
>
1725
>
Plans
>
1725 HOYT AVE 2022 Plans 2025-09-30
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/30/2025 9:07:37 AM
Creation date
9/30/2025 9:06:31 AM
Metadata
Fields
Template:
Address Document
Street Name
HOYT AVE
Street Number
1725
Permit
B2212-005
Year
2022
Notes
REMODEL EXISTING BATHROOM & (3) BEDROOMS, CONSTRUCT NEW BATH
Address Document Type
Plans
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
25
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
"" ent stack <br /> F <br /> Vertical Section View Waste Pipes from New Master Bath to Basement <br /> 2nd Level <br /> p E Toilet Shower <br /> A E <br /> Approx.1.5"drop.71"run Approx.3.2"drop,153"run <br /> in joist bay between 11/21 levels in joist bay between 111/2n°levels <br /> Shift Toad to this wall <br /> (original lontlon) <br /> B Approx.115"vertical drop Approx.115"vertical <br /> in closet behind door drop in exterior wall <br /> 1st Level <br /> �P Sink <br /> Shower <br /> fireplace <br /> r. <br /> A <br /> r <br /> � �•�, C Ci Not shown;Approx. <br /> 0 t.---•J "—_g Not shown:36"run,0.75"drop Approx.2.75"drop,13SD 23"run,0.5"drop <br /> run In joist <br /> -= Connecting B to D Soil Stack connecting f to <br /> o r,% bay between 1't level&basement Soil Stack <br /> 1 ' Toilet <br /> c o ^s J Basement <br /> A <br /> FYI <br /> Detail Plan A: Waste Pipe Route for Master <br /> Bath Between 2nd Level and Basement Cameron-Behees, 1' Floor �"=1 foot s,r <br />
The URL can be used to link to this page
Your browser does not support the video tag.