My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1725 HOYT AVE 2022 Plans 2025-09-30
>
Address Records
>
HOYT AVE
>
1725
>
Plans
>
1725 HOYT AVE 2022 Plans 2025-09-30
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/30/2025 9:07:37 AM
Creation date
9/30/2025 9:06:31 AM
Metadata
Fields
Template:
Address Document
Street Name
HOYT AVE
Street Number
1725
Permit
B2212-005
Year
2022
Notes
REMODEL EXISTING BATHROOM & (3) BEDROOMS, CONSTRUCT NEW BATH
Address Document Type
Plans
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
25
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
V Level: Library <br /> After 2n6 story plumbing/electrical work, move Dining Room/Library wall and complete <br /> sheetrock ceiling. <br /> Wall to be demolished is load bearing. It was added in 1970s, shifting load from original <br /> location. Ceiling/floor joints allow wall to be moved back to original 1910 location. New wall to <br /> have 5 foot framed/casing opening to library (but no operating doors). Header sufficient to <br /> support 2na story load. <br /> Library will be surrounded by built-in bookcases. Resulting space above bookcase on north <br /> wall allows run for water supply and waste pipes from 211 story bath without needing to cut <br /> into ceiling/floor joists. <br /> • Demolition: <br /> o Tear out load bearing south wall <br /> o Tear out particle board floor underlayment <br /> o Tear out exterior window <br /> • Framing/Walls: <br /> o New load bearing wall (in original 1910 location)to separate Library from Dining Room. 5-foot <br /> opening (no door) in wall, with traditional casing (see Elevation: Library Wall and Opening). <br /> o New ceiling (currently torn out) <br /> • Windows: <br /> o Install owner-furnished window <br /> • Electrical: <br /> o Replace electrical receptacles (four), one each wall <br /> o Install owner-furnished ceiling light fixture &wall switch <br /> • Floor: <br /> o About 50%of floor (^300 linear feet) is missing original 3'/"fir floor. Restore missing floor with <br /> owner-furnished tongue-and-groove fir flooring. <br /> • Trim/Finishes: <br /> o Traditional 5" casings around window and door opening with 6" cap/crown (stained finish) <br /> o Traditional milled S" baseboard molding(stained finish) <br /> o Paint ceiling,walls <br /> • Bookcases: Install Owner-provided built-in bookcases and bench seat below window. <br /> Notes: <br /> • Does not include refinish of wood floors (Owner will complete following remodel) <br /> • Owner is obtaining City of Everett building permit for project <br />
The URL can be used to link to this page
Your browser does not support the video tag.