Laserfiche WebLink
GROUNDING NOTES: <br /> T Mobile,. <br /> 1. GROUNDING SHALL COMPLY WITH LATEST EDITION OF THE <br /> NATIONAL ELECTRICAL CODE,AS WELL AS T-MOBILE <br /> STANDARDS. <br /> 2. MINIMUM BENDING RADIUS FOR GROUNDING CONNECTORS (E)OR(N)T-MOBILE ANTENNA MOUNTING <br /> S 8". PIPE CONNECTED TOC (R ANTENNA GROUND �t LYN X <br /> 3. NO SPLICES PERMITTED IN GROUND CONDUCTORS. BAR PER MANUFACTURER'S SPECIFICATIONS <br /> (QUANTITY VARIES PER PLAN) <br /> 4. ALL GROUNDING CONNECTORS TO BE CLEAN AND FREE OF <br /> PAINT AT THEIR MATING SURFACES AND INSTALLED PER (E)OR(N)T-MOBILE RRU CONNECTED TO(E)OR(N) <br /> MANUFACTURER'S RECOMMENDATIONS.USE PENETROX ANTENNA GROUND BAR PER MANUFACTURER'S <br /> ANTIOXIDANT GREASE(OR APPROVED EQUAL). SPECIFICATIONS(QUANTITY VARIES PER PLAN) CAPITAL DESIGN SERVICE <br /> 5. ALL GROUND BAR CONNECTIONS ARE TO BE 2-HOLE LUG 91 O 4TH AVE E, 850fi <br /> PME <br /> ,96 <br /> ❑L 360.9,1 6.6 <br /> WA 9B6 <br /> COMPRESSION TYPE.STACKED CONNECTIONS ARE NOT / 360.9 ACCEPTABLE.BACK TO BACK CONNECTIONS ON OPPOSITE #2 STRANDED GREEN INSULATED COPPER www.cAPiTALocsiB sERcRvmes.co <br /> GROUND LEAD FROM NEW EQUIPMENT <br /> SIDES OF THE GROUND BAR WILL BE PERMITTED. <br /> TO GROUND BAR,TYP <br /> 6. ENSURE ALL MECHANICAL CONNECTORS ARE TORQUED TO <br /> THE MANUFACTURER'S SPECIFIED VALUES. <br /> AGB <br /> 7. MULTIPLE BONDS ON GROUND RODS TO BE SEPARATED BY AT — CONNECTION FROM � ECTO R <br /> LEAST 6". ANTENNA GROUND BAR TO <br /> (E)T-MOBILE GROUND BAR AT E n o I n E E R s <br /> 8. MAXIMUM RESISTANCE OF THE COMPLETED GROUND SYSTEM EQUIPMENT AREA/ROOM <br /> SHALL NOT EXCEED A RESISTANCE OF 5 OHMS TO EARTH. <br /> DRAWN BY: U <br /> 9. GROUND WIRES SHALL NOT BE INSTALLED THROUGH HOLES IN (E)OR(N)T-MOBILE <br /> ANY METAL OBJECTS OR SUPPORTS;TO PRECLUDE ANTENNA GROUND BAR CHECKED BY: BU <br /> ESTABLISHING A"CHOKE"POINT. (TYP OF 1 PER SECTOR) <br /> DRAWING VERSION <br /> 10. GROUND BARS SHALL NOT BE FIELD MODIFIED. VER. DATE DESCRIPTION <br /> 11. GROUND RING BURIAL DEPTH SHALL BE 30". 1 11/22/24 PRELIM CX DRAWINGS <br /> 2 11/26/24 CLIENT COMMENT <br /> 12. A CERTIFIED CONTRACTOR WILL MAKE ALL MEASUREMENTS 3 12/02/24 FINAL CX DRAWINGS <br /> REQUIRED TO TEST THE GROUNDING SYSTEM USING A <br /> MEGGER OR EQUIVALENT.THE ACCEPTABLE RESISTANCE <br /> MEASURED FOR THE GROUNDING SYSTEM WILL NOT EXCEED <br /> 5 OHMS RESISTANCE.THREE DISTANCES SHALL BE USED:1 AT <br /> 100 FEET,1 AT 70 FEET AND 1 AT 35 FEET.THESE DISTANCES <br /> ARE SUBJECT TO A SITE-BY-SITE BASIS.T-MOBILE SHALL BE <br /> GIVEN 24 HOURS NOTICE.ALL COSTS ASSOCIATED WITH <br /> GROUND TESTING WILL BE AT THE EXPENSE OF THE LICENSER <br /> CONTRACTOR. I I <br /> y <br /> Q (E)ROOFTOP(SCHEMk C w <br /> IS TYPICAL OF ALL <br /> / ROOFTOP SITES) \ <br /> I <br /> GROUNDING LEGEND <br /> ® GROUND TEST WELL PROJECT INFORMATION <br /> SE01510A <br /> �. GROUND ROD DOWNTOWN <br /> • MECHANICAL CONNECTION EVERETT-WALL <br /> (DOUBLE HOLE LUG) <br /> 2930 WETMORE AVE <br /> ■ CAD WELD CONNECTION EVERETT,WA 98201 <br /> • CONNECT PER MANUFACTURER SHEET TITLE <br /> SPECIFICATIONS <br /> GROUNDING <br /> GB GROUNDBAR DIAGRAM <br /> EARTH GROUND <br /> SHEET NO. <br /> F1 GROUNDING DIAGRAM 11X17 SCALE:NTS E1 .0 <br /> 22 X 34 SCALE: NTS <br /> City of Everett Permit Services <br /> EVERETT Reviewed for Permit 12/17/2024 <br /> WASHINGTON <br />