Laserfiche WebLink
Change Order No._________________________ <br />Change Order Effective Date:________________ <br />Contractor and City agree as follows: <br />1. The scope of Work shall be changed to the extent described in Exhibit A. <br />2. The amount of this Change Order for the changes described in Exhibit A, <br />represents complete compensation for the changes described in Exhibit A, <br />including all direct and indirect costs and impacts. The Contract Sum shall be <br />adjusted as described in this Change Order. <br />3. Everett Municipal Code 3.80.050 sets forth the threshold amounts below which <br />the Mayor or his designee is authorized to direct Contractor to perform <br />additional work. In calculating such threshold amounts, Washington State <br />sales tax, as applicable to the Work, has been considered. <br />4. The Contract Time of the Contract shall be adjusted to the extent described in <br />this Change Order. <br />5. Contractor waives and releases any and all claims arising out of, or related to, <br />this Change Order, the work described in Exhibit A, and all work and actual or <br />constructive changes that occurred or began prior to the date of this Change <br />Order, including, but not limited to, claims for equitable adjustment of time and <br />compensation, delay, impact, overhead, or inefficiencies. This provision does <br />not apply to requests for equitable adjustment of time or price for which the <br />Contractor timely and properly provided notice of a differing site condition, <br />protest, dispute, claim or Contract Claim as required by the Contract <br />Documents. If the Contract Documents establish a time period for notice of a <br />differing site condition, protest, dispute, claim, or Contract Claim that ends <br />after the date of this Change Order, but relates to work performed prior to the <br />date of this Change Order, then this provision does not apply if the Contractor <br />timely and properly submits such notice <br />6. This Change Order only changes the contract between Contractor and City to <br />the extent explicitly provided herein. <br />7. Signature(s) on this Change Order may be by pdf, email, fax or other electronic <br />means, in which case such signature(s) will have the same effect as an original <br />ink signature. This Change Order may be signed in counterparts, each of <br />which shall be deemed an original, and all of which, taken together, shall be <br />deemed one and the same document. <br />8/18/2025 <br />1