Laserfiche WebLink
Bid Item #18: Schedule A Storm Sewer Pipe, 24-Inch Diameter. Modify bid <br />item #18 entitled, “Schedule A Storm Sewer Pipe, 24-Inch Diameter” at the <br />bid item unit price of $2,500.00/LF, by adding 5 Linear Feet to the Contract, <br />resulting in a Contract increase of $12,500.00. <br />Bid Item # 32: Cement Concrete Sidewalk. Modify bid item # 32 entitled, <br />“Cement Concrete Sidewalk” at the bid item unit price of $70.00/Square <br />Yard, by adding 50 SY to the Contract, resulting in a Contract increase of <br />$3,500.00. <br />Justification: These 3 bid items overran plan quantity, so they are being <br />modified to pay for those overruns. <br />Total Change Order # 1 Costs <br />New Item 101: $ 8,040.00 <br />New Item 102: $11,000.00 <br />Bid Item 13: $12,180.00 <br />Bid Item 18: $12,500.00 <br />Bid Item 32: $ 3.500.00 <br />Total Costs: $47,220.00 <br />There are no working days added to the Contract.