My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
MacLeod Reckord PLLC 10/1/2025 Amendment 1
>
Contracts
>
Agreement
>
Professional Services (PSA)
>
MacLeod Reckord PLLC 10/1/2025 Amendment 1
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/1/2025 8:40:47 AM
Creation date
10/1/2025 8:40:38 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
MacLeod Reckord PLLC
Approval Date
10/1/2025
Council Approval Date
9/24/2025
End Date
8/31/2026
Department
Parks & Community Services
Department Project Manager
Lisa Page
Subject / Project Title
Forest Park Pickleball Installation Project Construction Support Services
Amendment/Change Order
Amendment
Amendment/Change Order Number
1
Tracking Number
0004282
Total Compensation
$59,123.44
Contract Type
Agreement
Contract Subtype
Professional Services (PSA)
Retention Period
6 Years Then Destroy
Imported from EPIC
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
7
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
EXHIBIT A <br />PROFESSIONAL SERVICES AGREEMENT <br />TASK 4. PRELIMINARY AND FINAL PUNCH LIST <br />4.1 Prepare for and attend in person (1) Preliminary and (1) Final Punch List Inspection. <br />Provide final punch list notes and photographs. <br />TASK 5. AS BUILT PLANS <br />5.1 Provide (1) set of As Built plans from Contractor-provided redline drawings. <br />Assumptions: <br />• Construction support limited to the estimated hours as shown in the fee proposal. City <br />has the option to reallocate funds between tasks and between consultants. <br />• Scope does not include archaeological monitoring during construction. <br />• As-Built documents are not field verified by consultant team. <br />• All documents in electronic (PDF) format. <br />• As Builts in both PDF and CAD format. <br />Deliverables: <br />• Preconstruction Agenda and Meeting Notes <br />• Weekly (or as on site) Construction Agenda and Meeting Notes <br />• RFI, ASI, Change Order, Pay Request responses <br />• Preliminary and Final Punchlist <br />• As-Built Plans <br />Forest Park Pickleball Court Improvements <br />Amendment 1 Construction Administration - Fee Summary <br />August 2025 <br />Compensation: <br />Maximum hourly additional compensation not to exceed $59,123.44
The URL can be used to link to this page
Your browser does not support the video tag.