My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
17 E MARINE VIEW DR 2019 Geotech Report 2025-10-01
>
Address Records
>
E MARINE VIEW DR
>
17
>
Geotech Report
>
17 E MARINE VIEW DR 2019 Geotech Report 2025-10-01
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/1/2025 11:28:32 AM
Creation date
10/1/2025 11:25:13 AM
Metadata
Fields
Template:
Address Document
Street Name
E MARINE VIEW DR
Street Number
17
Permit
B1904-035
Year
2019
Notes
SOIL REMEDIATION RECYCLING FACILITY BY CADMAN
Address Document Type
Geotech Report
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
67
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
APPENDIX A <br /> BORING LOGS AND LABORATORY DATA FROM PREVIOUS STUDIES <br /> Included in Appendix A are logs from previous studies completed in the vicinity of the site soil remediation <br /> facility. <br /> ■ Logs of two borings (B-1 and MW-1) completed by GeoEngineers, Inc. in 1991 for the geotechnical <br /> engineering study for the Bleach Plant Project. <br /> ■ Logs of eight borings (B-1 through B-10) completed by GeoEngineers, Inc. in 2008 for the Shadow <br /> Development geotechnical engineering study. <br /> ■ Consolidation test results of boring MW-1 at a depth of 53 feet completed by GeoEngineers, Inc. in <br /> 1991 for the Bleach Plant geotechnical study. <br /> ■ Atterberg limit test results for boring B-6 at a depth of 15 feet completed by GeoEngineers,Inc.in 2008 <br /> for the Shadow Development geotechnical engineering study. <br /> GEOENGINEERS August3,2018 PageA-1 <br /> File No.0643-015-00 <br />
The URL can be used to link to this page
Your browser does not support the video tag.